Skip to content

GRF · 灾害与危机治理

面向灾害与危机治理的优化与运筹学

Optimisation finds the best use of limited resources under constraints. In crisis governance it supports the placement of shelters and stockpiles, routing of relief, scheduling of response teams and the sequencing of recovery investment, with the assumptions that decide each result stated.

02申请

What optimisation and operations research does here.

Optimisation and operations research develop mathematical methods for allocating resources and making decisions under constraints. They support planning and logistics in complex, interconnected 系统. In disaster and crisis and 关键基础设施, optimisation supports prepositioning of supplies, network investment and recovery sequencing. Robust formulations help choose options that perform acceptably across many scenarios. The canonical description is on STEM Commons.

Pre-positioning relief stocks

Location models compare warehouse sites against hazard scenarios, travel times and costs, showing how stock placement changes access in different events.

Evacuation and relief routing

Network models estimate evacuation clearance times and relief routes under road closures, giving planners evidence on bottlenecks.

Sequencing recovery investment

Multi-objective models compare reconstruction sequences on cost, time and 风险, with the weights chosen by the decision maker shown.

03监测

Optimisation run.

团队遵循该方法时会使用的界面:其指标、状态与决策。名称为示例,数值仅作示意。

Optimisation run

Crisis governance · Optimisation and operations · Run R-3696

Feasible, gap closingGRF · 灾害与危机治理

融合

方法卡

方法
优化与运筹学
Variables
55,100
Optimality gap
1.8 pct
标签
模型估算

Binding constraints

能力011Binding
Budget00.3Binding
服务级别70Slack
Optimisation run: the screen’s structure, terms and states for Crisis governance.示例名称和示意数值;是设计方案,并非记录或实时系统。
04数据

该方法使用的输入。

Datasets and records used by optimisation and operations research on this platform, with the role each plays and the label its values carry. Sources are listed in 来源登记册.

数据角色标签
Road and facility networksModel structure观测
Hazard scenariosDisruption inputs模型估算
Population and demand dataNeed estimates估算
Cost and capacity recordsConstraints已报告
05政策情景

比较文书:规则、激励和信息。

三类工具在你设定的覆盖率和遵从率下与基线并列比较,每类都有自己的滞后和采用速度;效应大小是教学用数值,应以证据替换。情景:关于未来的具名假设,不是预测。

控制措施

结果的基线趋势
每年 2.0%
该工具的覆盖范围
70%
合规
75%
效应量,相对于教学取值
100%
未来年数
20 年

读数

期末时点降幅最大
监管
相对基线的降幅
21%
数字、方法与来源
年份基线监管经济激励信息与能力
0100.099.598.899.1
1102.0101.2100.199.8
2104.0102.5101.199.9
3106.1103.5101.6100.0
4108.2103.7101.8100.7
5110.4103.2101.7102.1
6112.6102.0101.6103.9
7114.9100.4101.6105.9
8117.299.2102.1108.0
9119.598.6102.9110.1
10121.998.9104.2112.3
11124.399.7105.7114.5
12126.8101.1107.4116.8
13129.4102.7109.4119.2
14131.9104.5111.4121.6
15134.6106.5113.5124.0
16137.3108.5115.7126.5
17140.0110.7118.0129.0
18142.8112.9120.4131.6
19145.7115.1122.8134.2
20148.6117.4125.2136.9

方法

  1. 政府工具 Hood (1983), The Tools of Government, Macmillan
  2. 胡萝卜、大棒与说教 Bemelmans-Videc, Rist and Vedung (1998), Transaction
  3. 创新扩散 Rogers (2003), Diffusion of Innovations, Free Press
  4. 不确定性扇形图(参数蒙特卡罗) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
  5. 单因素敏感性(龙卷风图) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

数据

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:

  • 边界 Natural Earth
  • 城市 Natural Earth
比较政策工具:规则、激励和信息。示意性教学模型:依据控件设定的数值运行,而非实测数据。方法:政府工具(Hood (1983), The Tools of Government, Macmillan);胡萝卜、大棒与说教(Bemelmans-Videc, Rist and Vedung (1998), Transaction);创新扩散(Rogers (2003), Diffusion of Innovations, Free Press)。
06验证

结果如何核查。

Solutions are checked for feasibility, tested through simulation and compared with historical decisions. 敏感性分析 examines how results change with parameters.

核查如何开展
Scenario rangeResults are tested across several hazard scenarios, not one
Sensitivity to weightsChanges in objective weights and their effect are reported
Field validationModel assumptions such as travel times are compared with observed data from exercises or events

Optimal solutions can be fragile when assumptions are wrong. Objectives may omit values that are hard to quantify.

07实施

从授权到评估,按支柱划分。

一项文书从授权到评估所经历的步骤,每一步都标明负责运行的支柱,以及仍由当局作出的决定。这是带有明示说明性数值的教学模型,不是预测。

  1. 授权与问题界定 主管当局(计划之外)
    主管当局依其自身规则界定问题和授权。 Howlett、Ramesh 和 Perl(2009)
  2. 证据与系统模型 Foundry
    对系统及其反馈、数据和已说明的局限进行建模。 OECD (2014),原则 2
  3. 在情景下评估备选方案 Foundry
    在情景下比较各项政策工具,并显示不确定性。 Hood (1983)
  4. 与利益相关方演练 宇宙
    在演练中与将实施和承担这些方案的各方一起检验方案。 OECD(2014),原则 3
  5. 起草标准或指南 Nexus Standards
    行之有效的做法被编纂为标准或指南,并公开征求意见。 Nexus Standards 流程
  6. 由主管当局决定 主管当局(计划之外)
    主管当局在计划之外,依据记录在案的证据作出决定。 Howlett、Ramesh 和 Perl(2009)
  7. 能力与培训 Risk Academy
    负责实施的人员接受关于所决定文书及其数据的培训。 仙台框架(2015),优先事项 2
  8. 监测与公开报告 报告
    指标连同来源、局限和更正一并发布。 OECD(2014),原则 5
  9. 评估与修订 Nexus Standards
    结果反馈至标准和模型:循环闭合。 Howlett、Ramesh 和 Perl(2009)

方法

  1. 政策周期 Howlett, Ramesh and Perl (2009), Studying Public Policy, Oxford University Press
  2. 关键风险治理 OECD(2014),Recommendation of the Council on the Governance of Critical Risks
  3. 有向图的分层绘制 Sugiyama, Tagawa and Toda (1981), IEEE SMC 11
从授权到评估,按支柱划分:所记录的各个步骤及其所属支柱;来源按各步骤所引。
09工具与承诺

工具、职责与承诺。

政策制定者、外交官或发展机构所使用的文书、授权、行为方和问责安排,并注明设定它们的协定。结构遵循所列框架。所绘制的任何状态或进展均为说明性,并非记录。

随时间变化的授权与协定

The agreements that set mandates and commitments on optimisation and operations research for disaster and crisis governance, from adoption to their current horizon.

  1. 2015《仙台减少灾害风险框架》UNDRR
  2. 2015《2030 年可持续发展议程》和可持续发展目标联合国
  3. 2030《2030 年议程》和《仙台框架》的时间跨度联合国
Adoption years of the agreements named; the texts and their bodies are the authority. Chosen from the page’s fields.
《仙台框架》(减少灾害风险) · 联合国减少灾害风险办公室《巴黎协定》 · 《联合国气候变化框架公约》《2030 年可持续发展议程》和可持续发展目标 · 联合国《国际卫生条例》 · 世卫组织
10管理责任

由谁维护该方法。

系统科学与建模 stewards optimisation and operations research for the Consortium and reviews how it is applied across platforms.

12问题

问题与解答。

What are the limits of optimisation and operations research in this field?
Optimal solutions can be fragile when assumptions are wrong. Objectives may omit values that are hard to quantify.
结果如何核查?
Solutions are checked for feasibility, tested through simulation and compared with historical decisions. Sensitivity analysis examines how results change with parameters.
本页面上的数值是真实的吗?
The data names, roles and checks are real descriptions of practice. The canvas shows a design of the method’s use, not a run; no result is reported here.
该方法还应用于何处?
维持社会运转的各个 规范方法页面 列出应用该方法的每个平台。
报告贡献

从本页贡献证据。

报告 is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

全球风险论坛(Global Risks Forum)灾害与危机治理Universe 年度综述证据简报
灾害与危机治理

把一个治理问题带到论坛。

信息和咨询现已开放。每项咨询都会获得一个编号,并告知下一步;申请、付款、算力分配和注册只有在相应团队、条款和审查能力就绪时才会开放。