Skip to content

GRF · Tata Kelola Bencana dan Krisis

Optimasi dan riset operasi untuk tata kelola bencana dan krisis

Optimisation finds the best use of limited resources under constraints. In crisis governance it supports the placement of shelters and stockpiles, routing of relief, scheduling of response teams and the sequencing of recovery investment, with the assumptions that decide each result stated.

02Permohonan

What optimisation and operations research does here.

Optimisation and operations research develop mathematical methods for allocating resources and making decisions under constraints. They support planning and logistics in complex, interconnected sistem. In disaster and crisis and infrastruktur kritis, optimisation supports prepositioning of supplies, network investment and recovery sequencing. Robust formulations help choose options that perform acceptably across many scenarios. The canonical description is on STEM Commons.

Pre-positioning relief stocks

Location models compare warehouse sites against hazard scenarios, travel times and costs, showing how stock placement changes access in different events.

Evacuation and relief routing

Network models estimate evacuation clearance times and relief routes under road closures, giving planners evidence on bottlenecks.

Sequencing recovery investment

Multi-objective models compare reconstruction sequences on cost, time and pengurangan risiko, with the weights chosen by the decision maker shown.

03Pantau

Optimisation run.

Layar yang akan digunakan sebuah tim untuk mengikuti metode ini: ukuran, status, dan keputusannya. Nama adalah contoh dan nilai bersifat ilustratif.

Optimisation run

Crisis governance · Optimisation and operations · Run R-3696

Feasible, gap closingGRF · Tata Kelola Bencana dan Krisis

Konvergensi

Kartu metode

Metode
Optimisasi dan riset operasi
Variables
55,100
Optimality gap
1.8 pct
Label
DIMODELKAN

Binding constraints

Kapasitas011Binding
Budget00.3Binding
Tingkat layanan70Slack
Optimisation run: the screen’s structure, terms and states for Crisis governance.Nama contoh dan nilai ilustratif; sebuah rancangan, bukan catatan atau sistem yang aktif.
04Data

Apa yang digunakan metode ini.

Datasets and records used by optimisation and operations research on this platform, with the role each plays and the label its values carry. Sources are listed in register sumber.

DataPeranLabel
Road and facility networksModel structureTERAMATI
Hazard scenariosDisruption inputsDIMODELKAN
Population and demand dataNeed estimatesESTIMASI
Cost and capacity recordsConstraintsDILAPORKAN
05Skenario kebijakan

Bandingkan instrumen: aturan, insentif, dan informasi.

Tiga rumpun instrumen berdampingan dibandingkan dengan garis dasar, masing-masing dengan jeda dan kecepatan adopsinya sendiri, pada cakupan dan kepatuhan yang Anda tetapkan; besaran efek adalah nilai pengajaran yang perlu diganti dengan bukti. Skenario: asumsi bernama tentang masa depan, bukan prakiraan.

Kendali

Tren dasar hasil
2,0% per tahun
Cakupan instrumen
70%
Kepatuhan
75%
Ukuran efek, terhadap nilai pengajaran
100%
Tahun ke depan
20 tahun

Pembacaan

Pengurangan terbesar pada cakrawala waktu
Regulasi
Pengurangannya terhadap garis dasar
21%
Angka, metode, dan sumber
TahunGaris dasarRegulasiInsentif ekonomiInformasi dan kapasitas
0100.099.598.899.1
1102.0101.2100.199.8
2104.0102.5101.199.9
3106.1103.5101.6100.0
4108.2103.7101.8100.7
5110.4103.2101.7102.1
6112.6102.0101.6103.9
7114.9100.4101.6105.9
8117.299.2102.1108.0
9119.598.6102.9110.1
10121.998.9104.2112.3
11124.399.7105.7114.5
12126.8101.1107.4116.8
13129.4102.7109.4119.2
14131.9104.5111.4121.6
15134.6106.5113.5124.0
16137.3108.5115.7126.5
17140.0110.7118.0129.0
18142.8112.9120.4131.6
19145.7115.1122.8134.2
20148.6117.4125.2136.9

Metode

  1. Perangkat pemerintahan Hood (1983), The Tools of Government, Macmillan
  2. Wortel, tongkat, dan khotbah Bemelmans-Videc, Rist and Vedung (1998), Transaction
  3. Difusi inovasi Rogers (2003), Diffusion of Innovations, Free Press
  4. Kipas ketidakpastian (Monte Carlo parameter) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
  5. Sensitivitas satu per satu (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Data

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:

  • Perbatasan Natural Earth
  • Kota Natural Earth
Bandingkan instrumen: aturan, insentif, dan informasi. Model pengajaran ilustratif: model ini berjalan pada nilai yang ditetapkan oleh kontrol, bukan pada data terukur. Metode: Tools of government (Hood (1983), The Tools of Government, Macmillan); Carrots, sticks and sermons (Bemelmans-Videc, Rist and Vedung (1998), Transaction); Diffusion of innovations (Rogers (2003), Diffusion of Innovations, Free Press).
06Validasi

Cara hasil diperiksa.

Solutions are checked for feasibility, tested through simulation and compared with historical decisions. Analisis sensitivitas examines how results change with parameters.

PemeriksaanCara pelaksanaannya
Scenario rangeResults are tested across several hazard scenarios, not one
Sensitivity to weightsChanges in objective weights and their effect are reported
Field validationModel assumptions such as travel times are compared with observed data from exercises or events

Optimal solutions can be fragile when assumptions are wrong. Objectives may omit values that are hard to quantify.

07Implementasi

Dari mandat hingga evaluasi, per pilar.

Langkah-langkah yang ditempuh sebuah instrumen dari mandat hingga evaluasi, masing-masing dengan pilar yang menjalankannya, serta keputusan yang tetap berada pada otoritas. Model pengajaran dengan nilai ilustratif yang dinyatakan, bukan prediksi.

  1. Mandat dan pembingkaian masalah Otoritas yang berwenang (di luar program)
    Otoritas yang berwenang membingkai masalah dan mandat menurut aturannya sendiri. Howlett, Ramesh dan Perl (2009)
  2. Bukti dan model sistem Foundry
    Sistem dimodelkan beserta umpan baliknya, datanya, dan batasan yang dinyatakan. OECD (2014), prinsip 2
  3. Opsi dinilai dengan skenario Foundry
    Instrumen dibandingkan dalam berbagai skenario, dengan ketidakpastian ditampilkan. Hood (1983)
  4. Latihan bersama pemangku kepentingan Semesta
    Opsi-opsi diuji dalam latihan bersama pihak yang akan melaksanakan dan menanggungnya. OECD (2014), principle 3
  5. Standar atau panduan disusun Nexus Standards
    Apa yang berhasil dikodifikasi sebagai standar atau panduan, terbuka untuk komentar. Proses Nexus Standards
  6. Keputusan otoritas Otoritas yang berwenang (di luar program)
    Otoritas memutuskan, di luar program, dengan bukti yang tercatat. Howlett, Ramesh dan Perl (2009)
  7. Kapasitas dan pelatihan Akademi Risiko
    Pihak yang melaksanakan dilatih mengenai instrumen yang diputuskan dan datanya. Kerangka Kerja Sendai untuk Pengurangan Risiko Bencana (2015), prioritas 2
  8. Pemantauan dan laporan publik Laporan
    Indikator dipublikasikan beserta sumber, batasan, dan koreksinya. OECD (2014), principle 5
  9. Evaluasi dan revisi Nexus Standards
    Hasil kembali ke standar dan model: siklus pun tertutup. Howlett, Ramesh dan Perl (2009)

Metode

  1. Siklus kebijakan Howlett, Ramesh and Perl (2009), Studying Public Policy, Oxford University Press
  2. Tata kelola risiko kritis OECD (2014), Recommendation of the Council on the Governance of Critical Risks
  3. Penggambaran berlapis graf berarah Sugiyama, Tagawa and Toda (1981), IEEE SMC 11
Dari mandat hingga evaluasi, per pilar: langkah-langkah sebagaimana tercatat, masing-masing dengan pilarnya; sumber sebagaimana dikutip pada setiap langkah.
09Instrumen dan komitmen

Instrumen, mandat, dan komitmen.

Instrumen, mandat, aktor, dan pengaturan akuntabilitas yang digunakan pembuat kebijakan, diplomat, atau lembaga pembangunan, dengan merujuk perjanjian yang menetapkannya. Struktur mengikuti kerangka yang disebutkan. Setiap kondisi atau kemajuan yang digambarkan bersifat ilustratif, bukan catatan.

Mandat dan perjanjian dari waktu ke waktu

The agreements that set mandates and commitments on optimisation and operations research for disaster and crisis governance, from adoption to their current horizon.

  1. 2015Kerangka Kerja Sendai untuk Pengurangan Risiko BencanaUNDRR
  2. 2015Agenda 2030 dan Tujuan Pembangunan BerkelanjutanPerserikatan Bangsa-Bangsa
  3. 2030Cakrawala Agenda 2030 dan Kerangka Kerja Sendai untuk Pengurangan Risiko BencanaPerserikatan Bangsa-Bangsa
Adoption years of the agreements named; the texts and their bodies are the authority. Chosen from the page’s fields.
Kerangka Kerja Sendai untuk Pengurangan Risiko Bencana · UNDRRPersetujuan Paris · UNFCCCAgenda 2030 dan Tujuan Pembangunan Berkelanjutan · Perserikatan Bangsa-BangsaPeraturan Kesehatan Internasional · WHO
10Pengelolaan

Siapa yang memelihara metode ini.

Ilmu Sistem dan Pemodelan stewards optimisation and operations research for the Consortium and reviews how it is applied across platforms.

11Terhubung

Ke mana halaman ini mengarah di seluruh Konsorsium.

12Pertanyaan

Tanya jawab.

What are the limits of optimisation and operations research in this field?
Optimal solutions can be fragile when assumptions are wrong. Objectives may omit values that are hard to quantify.
Bagaimana hasil diperiksa?
Solutions are checked for feasibility, tested through simulation and compared with historical decisions. Sensitivity analysis examines how results change with parameters.
Apakah nilai di halaman ini nyata?
The data names, roles and checks are real descriptions of practice. The canvas shows a design of the method’s use, not a run; no result is reported here.
Di mana lagi metode ini diterapkan?
Observatory Halaman metode kanonis mencantumkan setiap platform yang menerapkannya.
LaporanBerkontribusi

Kontribusikan bukti dari halaman ini.

Laporan is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks ForumTata Kelola Bencana dan KrisisSintesis Tahunan UniverseRingkasan Bukti
Tata Kelola Bencana dan Krisis

Ajukan pertanyaan tata kelola kepada Forum.

Informasi dan pertanyaan sudah terbuka hari ini. Sebuah pertanyaan menerima nomor referensi dan menyebutkan langkah berikutnya; lamaran, pembayaran, alokasi komputasi, dan pendaftaran hanya dibuka ketika tim, ketentuan, dan kapasitas tinjauannya tersedia.