Recovery decides how a place rebuilds after a disaster: who leads, how damage is assessed, which standards apply, where money comes from and who is consulted. Done well, recovery reduces future risk; done poorly, it rebuilds the same exposure or leaves groups behind. This page sets out how recovery governance holds or fails, the records that show progress, and who decides.

02La domanda

Recovery governance: how the risk develops.

Reconstruction, funding and accountability. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Meccanismo

Speed competes with quality

Pressure to rebuild fast pushes reconstruction to existing sites and designs. Building back better needs time for hazard mapping, new standards and consultation, which delay visible progress.

Meccanismo

Finance arrives in fragments

Insurance, budgets, loans, grants and donor pledges arrive at different times with different conditions. Without a recovery framework that sequences them, gaps and duplication appear.

Meccanismo

Renters and informal residents fall out

Compensation often follows ownership records. Tenants, informal settlers and people without documents can be excluded from assistance and displaced by reconstruction.

Meccanismo

Integrity risks rise

Large, urgent contracts with relaxed procurement invite fraud and corruption. Transparent tracking of funds and contracts protects resources and trust.

03Geografia

Pericoli attuali nei Caraibi.

Densità di popolazione, acque di piena e incendi attivi sui Caraibi, da NASA GIBS. Ogni livello riporta la propria data.

La mappa interattiva richiede JavaScript; l'elenco dei livelli e le fonti sono riportati sotto.

Livelli 3

Pericoli attuali, per questa pagina

Informazioni su questo livello
Evidenze
Stimato
Fonte
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Columbia University))
Fornitore
NASA SEDAC (CIESIN, Columbia University)
Licenza
CC BY 4.0
Annata
null; Stima basata sul censimento, statica (2020)
Risoluzione
griglia di circa 1 km
Incertezza
Stima basata sul censimento degli abitanti per chilometro quadrato nel 2020, mostrata come contesto di esposizione; non un conteggio delle persone colpite da un pericolo.
Raggiungibile tramite
gibs.earthdata.nasa.gov, solo dopo che avete consentito la mappa dal vivo
Informazioni su questo livello
Evidenze
Osservato (le nuvole lasciano lacune)
Fonte
VIIRS Global Flood Product (NASA LANCE)
Fornitore
NASA LANCE
Licenza
Dati aperti NASA
Annata
giornaliero; rilevamento satellitare; le nuvole lasciano lacune
Più recente alla compilazione
2026-10-14
Risoluzione
griglia di circa 250 m
Incertezza
Rilevamento satellitare; le nuvole lasciano lacune. Raster satellitare o di modello come pubblicato dal fornitore. Nuvole, lacune di swath ed errori di recupero lasciano lacune e rumore; i valori sono indicatori, non misurazioni in un luogo.
Raggiungibile tramite
gibs.earthdata.nasa.gov, solo dopo che avete consentito la mappa dal vivo
Informazioni su questo livello
Evidenze
Osservato (nuvole e orari di passaggio lasciano lacune)
Fonte
VIIRS NOAA-20 375 m (FIRMS) (NASA LANCE FIRMS)
Fornitore
NASA LANCE FIRMS
Licenza
Dati aperti NASA
Annata
giornaliero; rilevamento satellitare; nuvole e orari di passaggio lasciano lacune
Più recente alla compilazione
2026-10-13
Risoluzione
griglia di circa 500 m
Incertezza
Rilevamenti satellitari di punti caldi per il giorno mostrato, comprese torce di gas e calore industriale; non un incendio confermato, un rapporto di incidente o un'allerta.
Raggiungibile tramite
gibs.earthdata.nasa.gov, solo dopo che avete consentito la mappa dal vivo
Informazioni su questo livello
Evidenze
Osservato
Fonte
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Fornitore
NASA LAADS DAAC
Licenza
Dati aperti NASA
Annata
giornaliero; radianza satellitare, corretta per luce lunare e atmosfera
Più recente alla compilazione
2026-10-12
Risoluzione
griglia di circa 500 m
Incertezza
Radianza notturna da satellite per la data mostrata; le luci sono un indicatore indiretto di consumo elettrico e interruzioni, non una misura di fornitura o accesso.
Raggiungibile tramite
gibs.earthdata.nasa.gov, solo dopo che avete consentito la mappa dal vivo
Informazioni su questo livello
Evidenze
Stimato
Fonte
GPM IMERG (NASA GES DISC)
Fornitore
NASA GES DISC
Licenza
Dati aperti NASA
Annata
giornaliero; stima satellitare, quasi in tempo reale
Più recente alla compilazione
2026-10-12
Risoluzione
griglia di circa 2 km
Incertezza
Stima satellitare, quasi in tempo reale. Raster satellitare o di modello come pubblicato dal fornitore. Nuvole, lacune di swath ed errori di recupero lasciano lacune e rumore; i valori sono indicatori, non misurazioni in un luogo.
Raggiungibile tramite
gibs.earthdata.nasa.gov, solo dopo che avete consentito la mappa dal vivo
Informazioni su questo livello
Evidenze
Osservato
Fonte
VIIRS NOAA-20 riflettanza corretta (NASA LANCE)
Fornitore
NASA LANCE
Licenza
Dati aperti NASA
Annata
giornaliero; immagine satellitare
Più recente alla compilazione
2026-10-14
Risoluzione
griglia di circa 250 m
Incertezza
Immagine satellitare. Raster satellitare o di modello come pubblicato dal fornitore. Nuvole, lacune di swath ed errori di recupero lasciano lacune e rumore; i valori sono indicatori, non misurazioni in un luogo.
Raggiungibile tramite
gibs.earthdata.nasa.gov, solo dopo che avete consentito la mappa dal vivo

Ultimo disponibile

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © contributori di OpenStreetMap (ODbL) · Natural Earth

Caricamento delle immagini NASA più recenti.

Trascina per spostare. Ctrl o ⌘ e scorrimento, pizzico o i pulsanti per lo zoom; passa il puntatore per i valori sottostanti; il ripristino riporta alla regione.

Pericoli in corso, inquadrati sui Caraibi.Prodotti satellitari e di modelli così come li pubblica la NASA, ciascuno con la propria data. Sono indicatori, non valutazioni di alcun luogo.

Dati: NASA GIBS · ASTER GDEM · Blue Marble · © contributori di OpenStreetMap · Natural Earth · NASA EONET · U.S. Geological SurveyFonti e licenze

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Dati aperti NASA
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Dati aperti NASA
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Con licenza CC BY 4.0. Colori ridisegnati dalla palette pubblicata; valori mediati in celle esagonali ove mostrati (modificato). doi:10.7927/H49C6VHW. CC BY 4.0
  • Prodotti VIIRS quasi in tempo reale (alluvioni, temperatura della superficie terrestre, copertura nevosa, riflettanza corretta), NASA LANCE; immagini tramite NASA GIBS. Colori ridisegnati dalla scala cromatica pubblicata; valori mediati in celle esagonali dove mostrati (modificato). Dati aperti NASA
  • Fire Information for Resource Management System (FIRMS) della NASA, prodotto incendi attivi VIIRS 375 m, NASA LANCE; tile vettoriali tramite NASA GIBS. Colori ridisegnati dalla scala cromatica pubblicata; valori mediati in celle esagonali dove mostrati (modificato). Dati aperti NASA
  • Luci notturne VIIRS Black Marble, NASA Goddard Space Flight Center; distribuite dal NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); immagini tramite NASA GIBS. Colori ridisegnati dalla scala cromatica pubblicata; valori mediati in celle esagonali dove mostrati (modificato). Dati aperti NASA
  • Precipitazioni GPM IMERG, NASA Precipitation Processing System; distribuite dal NASA Goddard Earth Sciences Data and Information Services Center (GES DISC); immagini tramite NASA GIBS. Colori ridisegnati dalla mappa cromatica pubblicata; valori mediati in celle esagonali dove indicato (modificato). Dati aperti NASA
  • ASTER GDEM è un prodotto di METI e NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); immagini tramite NASA GIBS. Colori ridisegnati dalla scala cromatica pubblicata; valori mediati in celle esagonali dove mostrati (modificato). Citare come: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. Dati aperti NASA
  • Realizzato con Natural Earth. Dati cartografici vettoriali e raster gratuiti @ naturalearthdata.com. Pubblico dominio
  • © Collaboratori di OpenStreetMap (ODbL), tramite NASA GIBS (coste, confini, strade e nomi di luoghi). Colori ridisegnati dalla mappa di colori pubblicata; valori mediati in celle esagonali dove mostrati (modificato). ODbL
  • Blue Marble, NASA Earth Observatory; immagini tramite NASA GIBS. Colori ridisegnati dalla scala cromatica pubblicata; valori mediati in celle esagonali dove mostrati (modificato). Dati aperti NASA
  • Contesto sul globo e sulla mappa piana: linee costiere, confini, strade e toponimi dai livelli di riferimento NASA GIBS (dati OpenStreetMap, ODbL, © contributori di OpenStreetMap); immagini Blue Marble come base facoltativa; terreno 3D e lettura dell'altitudine dall'indice cromatico di elevazione ASTER GDEM (classi da 5 m a 200 m, esagerate per leggibilità). I confini sono tracciati come pubblicati e non implicano alcuna posizione su alcun territorio.
  • Eventi in tempo reale: NASA Earth Observatory Natural Event Tracker (EONET); gli eventi sono indicativi e conservano i link alle fonti originali.
  • In diretta: gli eventi NASA EONET sono indicativi e non costituiscono allerte delle autorità.
  • In tempo reale: gli eventi dell'U.S. Geological Survey sono indicativi, non allerte delle autorità.
  • NASA GIBS: We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • Previsione della portata fluviale, 30 giorni con intervallo (GloFAS tramite Open-Meteo): contiene informazioni modificate del Copernicus Emergency Management Service 2026; non è un'allerta alluvione.
  • Dati meteorologici di Open-Meteo.com (https://open-meteo.com/), con licenza CC BY 4.0 (https://creativecommons.org/licenses/by/4.0/).
  • I livelli opzionali (20 fonti nell'elenco dei livelli: in tempo reale, previsionali, osservati e di contesto) riportano il credito del fornitore sulla mappa e qui quando attivati; le previsioni sono output di modelli e gli indici derivati sono stime.

Livelli e date

  • Densità di popolazione, 2020: Popolazione: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · statico
  • Acqua di inondazione, composito a 3 giorni: VIIRS Global Flood Product, NASA LANCE · 14 ott 2026
  • Incendi attivi e anomalie termiche: VIIRS NOAA-20 375 m (FIRMS), NASA LANCE FIRMS · 13 ott 2026
  • Luci notturne, giornaliere: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 ott 2026
  • Intensità delle precipitazioni, media giornaliera: GPM IMERG, NASA GES DISC · 12 ott 2026
  • Colori reali: riflettanza corretta VIIRS NOAA-20, NASA LANCE · 13 ott 2026

04Indicatori

Cosa viene misurato e con quale accuratezza.

Ogni indicatore riporta la sua unità, la sua cadenza, il tipo di fonte su cui si basa e l'etichetta di evidenza che un valore riporterebbe. Non sono mostrati valori: un programma li fornisce sotto la propria autorità.

IndicatoreUnitàCadenzaTipo di fonteEtichetta
Post-disaster needs assessment completedyes or no, with dateper eventoGovernment and partner recordsStatistiche pubblicate
Recovery framework adoptedsì o noper eventoRegistri governativiStatistiche pubblicate
Recovery funds pledged, committed and disbursedcurrency, by stagetrimestraleRecovery tracking sistemiRIPORTATO
Housing units reconstructedcount against needtrimestraleRecovery agency reportsRIPORTATO
Reconstruction meeting updated hazard standardsshare of rebuilt assetsperiodicoBuilding control recordsRIPORTATO
Households excluded from assistance for lack of documentsconteggioper programmeProgramme reviewsSTIMATO
05Monitoraggio

Comitato di coordinamento interagenzia.

La schermata che un gruppo utilizzerebbe per seguire questo tema: misure, stati e decisioni. I nomi sono esempi e i valori sono illustrativi.

Comitato di coordinamento interagenzia

Recovery governance · National crisis centre · Exercise EX-72

Esercitazione di coordinamentoGRF · Governance dei disastri e delle crisi

Chi guida cosa

AllertaServizio meteorologicoProtezione civileCancellaAttivo
EvacuazioneComunePoliziaSovrapposizioneIncaricato
AlloggioServizi socialiSocietà di volontariCancellaAttivo
Informazione pubblicaCoordinatore di crisiTuttiDivarioNon assegnato

Registro delle esercitazioni

  1. 09:00STAInizio dell'esercitazione
  2. 09:38WRNAllerta rossa emessa
  3. 10:17GAPDue agenzie diffondono indicazioni contrastanti
  4. 11:00FIXPortavoce unico nominato

Punti dell'analisi post-intervento

  1. AA-1Attribuire per legge la responsabilità dell'informazione pubblicaResponsabile della policy81 d
  2. AA-2Quadro della situazione condiviso tra le agenzieCentro di crisi66 d
Multi-agency coordination board: the screen’s structure, terms and states for Recovery governance.Nomi di esempio e valori illustrativi; un progetto, non un registro né un sistema attivo.
06Fonti

Da dove provengono le evidenze.

Set di dati pubblici e registri istituzionali specifici, ciascuno con la sua classe di licenza. Le fonti soggette ad accordo sono utilizzate solo alle relative condizioni e mai ripubblicate.

FonteCosa fornisceClasse di licenza
Post-disaster needs assessments (PDNA) and Global Rapid Post-Disaster Damage Estimation (GRADE) reportsDamage, loss and recovery needs after major disastersPublic reports, terms per publisher
GFDRR recovery framework guidanceGuidance on organising recovery institutions and financeFree, World Bank terms
Recovery agency progress reportsReconstruction progress and spendingRegistri pubblici, condizioni stabilite da ciascuna agenzia
OCHA Financial Tracking ServiceHumanitarian funding flows by crisisFree, OCHA terms
Open Contracting data on emergency procurementContracts awarded during emergencies, where publishedLicence per publisher
07Scenari di policy

Confrontare gli strumenti: regole, incentivi e informazione.

Tre famiglie di strumenti a confronto con lo scenario di riferimento, ciascuna con il proprio ritardo e la propria velocità di adozione, con la copertura e la conformità da voi impostate; le dimensioni degli effetti sono valori didattici da sostituire con evidenze. Scenario: ipotesi dichiarate sul futuro, non una previsione. La mappa di questa pagina mostra i Caraibi; il modello in sé non è legato a un luogo.

Comandi

Andamento di base dell'esito
2,0% all'anno
Copertura dello strumento
70%
Conformità
75%
Dimensione dell'effetto, rispetto al valore didattico
100%
Anni a venire
20 anni

Letture

Maggiore riduzione all'orizzonte
Regolamentazione
La sua riduzione rispetto al valore di riferimento
21%
Numeri, metodi e fonti
AnnoBase di riferimentoRegolamentazioneIncentivo economicoInformazione e capacità
0100.099.598.899.1
1102.0101.2100.199.8
2104.0102.5101.199.9
3106.1103.5101.6100.0
4108.2103.7101.8100.7
5110.4103.2101.7102.1
6112.6102.0101.6103.9
7114.9100.4101.6105.9
8117.299.2102.1108.0
9119.598.6102.9110.1
10121.998.9104.2112.3
11124.399.7105.7114.5
12126.8101.1107.4116.8
13129.4102.7109.4119.2
14131.9104.5111.4121.6
15134.6106.5113.5124.0
16137.3108.5115.7126.5
17140.0110.7118.0129.0
18142.8112.9120.4131.6
19145.7115.1122.8134.2
20148.6117.4125.2136.9

Metodi

  1. Gli strumenti del governo Hood (1983), The Tools of Government, Macmillan
  2. Carrots, sticks and sermons Bemelmans-Videc, Rist e Vedung (1998), Transaction
  3. Diffusione delle innovazioni Rogers (2003), Diffusion of Innovations, Free Press
  4. Ventaglio di incertezza (Monte Carlo sui parametri) Spiegelhalter, Pearson e Short (2011), Visualising uncertainty about the future, Science 333
  5. Sensibilità un fattore alla volta (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Dati

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:

  • Confini Natural Earth
  • Città Natural Earth
Confrontare gli strumenti: regole, incentivi e informazione. Modello didattico illustrativo: funziona con i valori impostati dai controlli, non con dati misurati. Metodi: Tools of government (Hood (1983), The Tools of Government, Macmillan); Carrots, sticks and sermons (Bemelmans-Videc, Rist e Vedung (1998), Transaction); Diffusion of innovations (Rogers (2003), Diffusion of Innovations, Free Press).
08Decisioni

Chi decide, e a cosa servono le evidenze.

Governance dei disastri e delle crisi prepara le evidenze. Le decisioni seguenti sono prese dalle autorità indicate, secondo le proprie regole, e mai dalla piattaforma.

Chi decideLa domandaEvidenze fornite da questa pagina
Recovery authorities and ministriesWho leads recovery and which standards apply to reconstructionComparative recovery frameworks and assessment records
Ministeri delle finanzeHow recovery finance is mobilised and sequencedFunding flows and lessons from past recoveries
Enti localiWhere and how to rebuild, and how residents are consultedHazard maps, needs assessments and consultation practice
Audit institutionsWhether recovery funds were used as intendedProcurement and spending records

Output prodotti da questo argomento

  • Comparative notes on recovery institutions and frameworks
  • Guide to sequencing recovery finance
  • Dialogue briefs on inclusion of renters and informal residents in recovery
  • Questions for recovery authorities on transparency of funds
09Implementazione

Dal mandato alla valutazione, per pilastro.

I passaggi che uno strumento compie dal mandato alla valutazione, ciascuno con il pilastro che lo gestisce, e le decisioni che restano all'autorità. Modello didattico con valori illustrativi dichiarati, non una previsione. La mappa di questa pagina mostra i Caraibi; il modello in sé non è legato a un luogo.

  1. Mandato e inquadramento del problema Autorità competente (al di fuori del programma)
    Un'autorità competente inquadra il problema e il mandato secondo le proprie regole. Howlett, Ramesh e Perl (2009)
  2. Evidenze e modello del sistema Foundry
    Il sistema è modellato con i suoi meccanismi di retroazione, i dati e i limiti dichiarati. OCSE (2014), principio 2
  3. Opzioni valutate con scenari Foundry
    Gli strumenti sono confrontati in diversi scenari, con l'incertezza esplicitata. Hood (1983)
  4. Esercitazione con i portatori di interesse Universo
    Le opzioni sono messe alla prova in un'esercitazione con chi dovrebbe attuarle e sopportarne le conseguenze. OECD (2014), principio 3
  5. Norma o linee guida redatte Nexus Standards
    Ciò che funziona viene codificato come norma o linee guida, aperte ai commenti. Processo di Nexus Standards
  6. Decisione dell'autorità Autorità competente (al di fuori del programma)
    L'autorità decide, al di fuori del programma, sulla base delle evidenze agli atti. Howlett, Ramesh e Perl (2009)
  7. Capacità e formazione Risk Academy
    Chi attua riceve formazione sullo strumento deciso e sui suoi dati. Quadro di riferimento di Sendai per la riduzione del rischio di disastri (2015), priorità 2
  8. Monitoraggio e rapporto pubblico Rapporti
    Gli indicatori sono pubblicati con fonti, limiti e correzioni. OECD (2014), principio 5
  9. Valutazione e revisione Nexus Standards
    I risultati tornano alla norma e al modello: il ciclo si chiude. Howlett, Ramesh e Perl (2009)

Metodi

  1. Ciclo delle politiche Howlett, Ramesh e Perl (2009), Studying Public Policy, Oxford University Press
  2. Governance dei rischi critici OECD (2014), Recommendation of the Council on the Governance of Critical Risks
  3. Layered drawing of directed graphs Sugiyama, Tagawa e Toda (1981), IEEE SMC 11
Dal mandato alla valutazione, per pilastro: i passaggi come registrati, ciascuno con il proprio pilastro; fonti come citate in ogni passaggio.
10Questioni centrali

Cosa si chiedono gli esperti di governance.

Recovery is the phase with the most money, the most decisions and often the least attention once the emergency fades. Choices about where and how to rebuild set risk for decades. Recovery funding can be captured, delayed or misdirected, and affected communities can be excluded from decisions about their own futures. The idea of building back better captures the opportunity, but realising it depends on governance.

  • Who leads recovery, and how are national, local and community roles balanced?
  • How are recovery priorities set, and how do they reflect the needs of the most affected people?
  • How is recovery funding raised, allocated, tracked and audited?
  • Does reconstruction reduce future risk, or does it recreate the conditions that caused the disaster?
11Simulatore di gemello e cascata

Exercise a cascade in recovery governance with the people who decide.

Assembled from the Nexus Standards area profile Allerta precoce e azione anticipatoria: the hazards it names, the sistemi and communities that carry the loss, the controls and institutions that dampen it and the data that observe it. Pick an initiating event and step through the cascade to see where mandates meet and which decisions fall to whom. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise for dialogue, not a forecast, an assessment or a position. To model a place of your own choosing, open the full Costruttore di sistemi.

Pericoli

  • Alluvione da ingorgo di ghiaccio
  • Ciclone tropicale
  • Ondata di calore
  • Epidemia di HIV
  • Mareggiata (innescata a valle)
  • Piogge intense (innescate a valle)
  • Alluvione fluviale (innescata a valle)
  • Flash flood (set off downstream)
  • Mareggiata pericolosa (innescata a valle)
  • Blackout diffuso (innescato a valle)
  • Sfollamenti di massa (innescati a valle)
  • Alluvione costiera (innescata a valle)
  • Condizioni meteorologiche estreme per gli incendi (innescate a valle)
  • Incendio boschivo (innescato a valle)
  • Stress della rete dovuto al caldo (innescato a valle)
  • Siccità agricola (innescata a valle)
  • Siccità lampo (innescata a valle)
  • Siccità nevosa (innescata a valle)

Comandi

  • NS-0 Costituzione e principi
  • NS-3 UNI dei record di rischio (grammatica, corrispondenza legacy, autorità di assegnazione)
  • NS-9 UNI contestuali (distribuzioni, istanze, istanze di programma)
  • NS-10 Politiche e clausole (obblighi leggibili dalle macchine: definizione, vincolo, valutazione e applicazione)
  • NS-11 Verifica e monitoraggio (evidenze, attestazioni, osservazione della conformità zero trust)
  • NRS-C7 Allerta precoce, soglie di attivazione e azione anticipatoria
  • NRS-S9 System profile: NXS-AAP (Anticipatory action and triggers)
  • NRS-H117 Famiglia di pericoli: coesione sociale e rischio di atrocità (NHS-1 soc.cohesion)
  • NRS-H83 Famiglia di pericoli: cedimento della capacità del sistema sanitario (NHS-1 health.system)
  • NRS-H98 Famiglia per pericolo: IA agentica che agisce su larga scala (NHS-1 tech.ai-agentic)
  • NRS-H22 Famiglia di pericoli: tempeste solari-terrestri (NHS-1 space.solar-storm)

Osservazione

  • NWS API active alerts (CAP 1.2 as GeoJSON) (listed for reference)
  • GloFAS global flood forecasts and reanalysis (listed for reference)
  • ECMWF open data (IFS and AIFS real-time forecasts) (listed for reference)
  • CHIRPS quasi-global gridded precipitation (listed for reference)
  • Numero di paesi dotati di sistemi di allerta precoce multi-pericolo
  • Number of countries that have multi-hazard monitoring and forecasting systems
  • Number of people per 100,000 covered by early warning information through local governments or national dissemination mechanisms
  • Number of countries with accessible, understandable, usable and relevant disaster risk information and assessment

Geografia di esempio

  • Southeast Asia: 51 hexagonal cells
  • Acque superficiali attraverso le nuvole, 30 m (radar OPERA DSWx-S1), NASA GIBS
  • Intensità delle precipitazioni, ultima mezz'ora (IMERG), NASA GIBS
  • Temperatura dell'aria in superficie, diurna (AIRS), NASA GIBS
  • Luci notturne di stanotte, blackout (VIIRS Day/Night Band), NASA GIBS
12Meccanismi

Come funzionano gli assetti.

Recovery governance combines leadership, finance and accountability over a long period.

Vertici

Recovery institutions

Dedicated recovery agencies, existing ministries or local governments may lead. Each model has trade-offs between speed and integration.

Finanza

Funding and flows

Budgets, insurance, development finance and donations flow through different channels with different rules. Their fiscal dimension is studied at Finanza pubblica e debito sovrano at Global Risks Alliance (GRA).

Responsabilità

Transparency and oversight

Public tracking of funds and progress, audit and community feedback reduce leakage and build trust.

A tension runs through recovery governance: the demand to rebuild quickly against the need to rebuild safely and fairly. Rapid reconstruction on the same sites restores normality but may repeat exposure; careful planning reduces risk but leaves people waiting. Transparent decision processes that explain these trade-offs to affected communities help maintain trust while choices are made.

Why now: recovery after recent large earthquakes, floods and storms has shown how decisions on land, housing and funding taken in the first months shape exposure for decades. The platform is designed to convene recovery authorities, communities and funders on who decides recovery priorities, and to record the lessons as cases.

13Strumenti e impegni

How recovery governance is governed: instruments, mandates and commitments.

Gli strumenti, i mandati, gli attori e gli assetti di responsabilità con cui lavorano decisori politici, diplomatici e agenzie di sviluppo, con la citazione degli accordi che li stabiliscono. Le strutture seguono i quadri indicati. Qualsiasi stato o avanzamento raffigurato è illustrativo, non un registro.

Mandati e accordi nel tempo

The agreements that set mandates and commitments on recovery governance, from adoption to their current horizon.

  1. 2015Quadro di riferimento di Sendai per la riduzione del rischio di disastriUNDRR
  2. 2015Agenda 2030 e Obiettivi di sviluppo sostenibileNazioni Unite
  3. 2030Orizzonte dell'Agenda 2030 e del Quadro di riferimento di Sendai per la riduzione del rischio di disastriNazioni Unite
Adoption years of the agreements named; the texts and their bodies are the authority. Chosen from the page’s fields.
Quadro di riferimento di Sendai per la riduzione del rischio di disastri · UNDRRAccordo di Parigi · UNFCCCAgenda 2030 e Obiettivi di sviluppo sostenibile · Nazioni UniteRegolamento sanitario internazionale · OMS
14Metodi ed evidenze

Come si costruiscono le evidenze, e i loro limiti.

  1. 01

    Needs assessment

    Post-disaster needs assessments estimate damage, losses and recovery needs. Methods are established but estimates carry uncertainty.

  2. 02

    Recovery monitoring

    Tracking of reconstruction and livelihood outcomes over years. Monitoring often ends before recovery does.

  3. 03

    Comparative case study

    Comparison of recovery approaches across events to identify what works in which context.

  4. 04

    Financial tracking

    Analysis of funding flows and their timing. Data are scattered across many sources.

15Metodi

Come viene studiato, e cosa i metodi non possono dire.

16Domande

Domande e risposte.

What is build back better?
A Sendai Framework principle of using recovery, rehabilitation and reconstruction to increase resilience, by integrating risk reduction into rebuilt infrastructure, society, livelihoods and the environment.
What is a post-disaster needs assessment?
A government-led assessment, often supported by the UN, EU and World Bank, that estimates damage, losses and recovery needs and sets out a recovery strategy.
Why are tenants often missed in recovery?
Assistance is often tied to proof of ownership. People who rent, live informally or lack documents may not qualify unless programmes are designed to include them.
What does building back better mean?
Using recovery to reduce future risk and improve conditions, for example through safer construction, better land use and stronger services, rather than restoring what existed before.
Does GRF fund recovery?
No. GRF convoca e governa i programmi. Non regolamenta, non finanzia, non appalta e non certifica, e l'ospitalità o la sponsorizzazione non conferisce alcuna autorità sui risultati.
Why does recovery often exclude affected communities?
Pressure for speed, centralised decision-making and lack of mechanisms for participation. Inclusive recovery takes deliberate design.
How long does recovery take?
It varies widely. Infrastructure may be restored in months, while housing, livelihoods and psychosocial recovery can take many years.
RapportiContribuisci

Contribuisci con evidenze da questa pagina.

Rapporti is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks ForumGovernance dei disastri e delle crisiSintesi annuale di UniverseNota sulle evidenze
Governance dei disastri e delle crisi

Portate una questione di governance al Forum.

Informazioni e richieste sono aperte oggi. Una richiesta riceve un riferimento e indica il passo successivo; candidature, pagamenti, assegnazioni di calcolo e registrazioni si aprono solo quando esistono il team, le condizioni e la capacità di revisione.