GRF · Disaster and Crisis Governance
Business continuity governance
When a disaster strikes, hospitals, utilities, banks, ports and ministries must keep their essential services running. Business continuity governance decides which services are essential, how long they may be interrupted and who answers if they fail. ISO 22301 and sector rules on operational resilience set the frame. This page sets out how continuity governance works and fails, the records that show it, and who holds the decisions.
Business continuity governance in seven parts.
- 01The questionBusiness continuity governance: how the risk develops
- 02IndicatorsWhat is measured, and how well
- 03SourcesWhere the evidence comes from
- 04DecisionsWho decides, and what the evidence serves
- 05Core questionsWhat governance experts ask
- 06MechanismsHow the arrangements work
- 07Methods and evidenceHow the evidence is built, and its limits
Business continuity governance: how the risk develops.
Operator and public coordination. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.
Essential services are defined
Continuity starts by identifying the services whose interruption would cause harm, and setting tolerances for how long and how much disruption is acceptable. Without that, plans protect systems rather than outcomes.
Dependencies hide single points
Services rely on power, telecom, suppliers and staff who may all be affected by the same event. Plans that ignore shared dependencies fail when the backup shares the same weak point.
Boards own continuity
Continuity is a governing body responsibility. Where it sits only with an operational team, investment decisions do not reflect tolerances and gaps surface in an event.
Plans decay untested
Staff change, systems are replaced and suppliers shift. Plans that are not exercised against severe, plausible scenarios lose accuracy without anyone noticing.
People and hazards in the Caribbean.
Population density, night lights and flood water over the Caribbean, from NASA GIBS. Each layer carries its own date.
Imephu esebenzisanayo idinga i-JavaScript; uhlu lwezendlalelo nemithombo luphansi.
Izendlalelo 3
People and hazards, for this page
Mayelana nalesi sendlalelo
- Ubufakazi
- Kulinganisiwe
- Umthombo
- Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Columbia University))
- Umhlinzeki
- NASA SEDAC (CIESIN, Columbia University)
- Ilayisensi
- CC BY 4.0
- Inguqulo
- null; isilinganiso esisekelwe ekubalweni kwabantu, akuguquki (2020)
- Ukucaca
- igridi elinganiselwa ku-1 km
- Ukungaqiniseki
- Isilinganiso esisekelwe ekubalweni kwabantu sabantu ngekhilomitha eyisikwele ngo-2020, esiboniswa njengesimo sokuchayeka; akusona isibalo sabantu abathintwe yinoma iyiphi ingozi.
- Kufinyelelwe nge-
- ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
- Ubufakazi
- Kubonwe
- Umthombo
- VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
- Umhlinzeki
- NASA LAADS DAAC
- Ilayisensi
- Idatha evulekile ye-NASA
- Inguqulo
- nsuku zonke; ukukhanya kwesathelayithi, kulungiselwe ukukhanya kwenyanga nomkhathi
- Okusha kakhulu ngesikhathi sokwakha
- 2026-10-12
- Ukucaca
- igridi elinganiselwa ku-500 m
- Ukungaqiniseki
- Ukukhanya kwasebusuku okutholwe ngesathelayithi ngosuku oluboniswayo; izibani ziyinkomba yokusetshenziswa kukagesi nokucima kwawo, hhayi isilinganiso sokuhlinzekwa noma ukufinyelela.
- Kufinyelelwe nge-
- ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
- Ubufakazi
- Kubonwe (amafu ashiya izikhala)
- Umthombo
- VIIRS Global Flood Product (NASA LANCE)
- Umhlinzeki
- NASA LANCE
- Ilayisensi
- Idatha evulekile ye-NASA
- Inguqulo
- nsuku zonke; ukutholwa ngesathelayithi; amafu ashiya izikhala
- Okusha kakhulu ngesikhathi sokwakha
- 2026-10-14
- Ukucaca
- igridi elinganiselwa ku-250 m
- Ukungaqiniseki
- Ukutholwa ngesathelayithi; amafu ashiya izikhala. I-raster yesathelayithi noma yemodeli njengoba umhlinzeki eyishicilela. Amafu, izikhala zomzila nephutha lokuthola kushiya izikhala nomsindo; amanani angizinkomba, hhayi izilinganiso endaweni.
- Kufinyelelwe nge-
- ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
- Ubufakazi
- Kubonwe (amafu nesikhathi sokudlula kwesathelayithi kushiya izikhala)
- Umthombo
- VIIRS NOAA-20 375 m (FIRMS) (NASA LANCE FIRMS)
- Umhlinzeki
- NASA LANCE FIRMS
- Ilayisensi
- Idatha evulekile ye-NASA
- Inguqulo
- nsuku zonke; ukutholwa ngesathelayithi; amafu nesikhathi sokudlula kushiya izikhala
- Okusha kakhulu ngesikhathi sokwakha
- 2026-10-13
- Ukucaca
- igridi elinganiselwa ku-500 m
- Ukungaqiniseki
- Izindawo ezishisayo ezitholwe ngesathelayithi ngosuku oluboniswayo, kuhlanganise namalangabi egesi nokushisa kwezimboni; akuwona umlilo oqinisekisiwe, umbiko wesehlakalo noma isexwayiso.
- Kufinyelelwe nge-
- ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
- Ubufakazi
- Kubonwe
- Umthombo
- VIIRS NOAA-20 corrected reflectance (NASA LANCE)
- Umhlinzeki
- NASA LANCE
- Ilayisensi
- Idatha evulekile ye-NASA
- Inguqulo
- daily; Satellite image
- Okusha kakhulu ngesikhathi sokwakha
- 2026-10-14
- Ukucaca
- igridi elinganiselwa ku-250 m
- Ukungaqiniseki
- Satellite image. Satellite or model raster as the provider publishes it. Clouds, swath gaps and retrieval error leave gaps and noise; values are indicators, not measurements at a place.
- Kufinyelelwe nge-
- ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Mayelana nalesi sendlalelo
- Ubufakazi
- Modelled (latest year GIBS publishes)
- Umthombo
- MODIS Terra and Aqua land cover (MCD12Q1) (NASA LP DAAC)
- Umhlinzeki
- NASA LP DAAC
- Ilayisensi
- Idatha evulekile ye-NASA
- Inguqulo
- yearly; Satellite classification; latest year GIBS publishes
- Okusha kakhulu ngesikhathi sokwakha
- 2024-01-01
- Ukucaca
- igridi elinganiselwa ku-500 m
- Ukungaqiniseki
- Satellite land cover classes for the year shown, including croplands; a classification with known errors, not a farm register.
- Kufinyelelwe nge-
- ukudluliswa kwedatha kwale sayithi, kusuka ku-gibs.earthdata.nasa.gov
Ikhibhodi, kugxilwe emephini
Bamba u-Ctrl noma u-⌘ bese uskrola ukuze usondeze
Okutholakala kwakamuva
NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © abanikele ku-OpenStreetMap (ODbL) · Natural Earth
Iyalayisha izithombe zakamuva ze-NASA.
Donsa ukuze unyakazise. U-Ctrl noma u-⌘ bese uskrola, ucindezele ngeminwe emibili noma izinkinobho ukuze usondeze; beka isikhombi ukuze ubone amanani aphansi kwaso; ukusetha kabusha kubuyisela esifundeni.
People and hazards, framed on the Caribbean.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.
Idatha: NASA GIBS · ASTER GDEM · Blue Marble · © abanikele ku-OpenStreetMap · Natural Earth · NASA EONET · Isikhungo Sezokuhlola Umhlaba sase-U.S.Imithombo namalayisense
- We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
- We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
- Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
- VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
- VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
- NASA Fire Information for Resource Management System (FIRMS), VIIRS 375 m active fire product, NASA LANCE; vector tiles via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
- MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
- ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
- Kwenziwe nge-Natural Earth. Idatha yamamephu yamahhala ye-vector ne-raster ku-naturalearthdata.com. Esizindeni somphakathi
- © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
- Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
- Umongo ephaseleni nasemephini oyisicaba: amagoda olwandle, imingcele, imigwaqo namagama ezindawo avela emaleyeni ereferensi e-NASA GIBS (idatha ye-OpenStreetMap, ODbL, © abafaki be-OpenStreetMap); izithombe ze-Blue Marble njengesisekelo ongasikhetha; umhlaba we-3D nokufundwa kokuphakama okuvela enkombeni yombala wokuphakama ye-ASTER GDEM (amakilasi e-5 m kuya ku-200 m, andiswe ukuze afundeke kahle). Imingcele idwetshwe njengoba ishicilelwe futhi ayisho sikhundla ngasiphi isifunda.
- Imicimbi eqondene nesikhathi samanje: NASA Earth Observatory Natural Event Tracker (EONET); imicimbi iyisikhombisi kuphela futhi igcina izixhumanisi zomthombo wayo wokuqala.
- Bukhoma: NASA EONET Imicimbi iyisikhombisi, akuyizixwayiso zesiphathimandla.
- Bukhoma: U.S. Geological Survey Imicimbi iyisikhombisi, akuyizixwayiso zesiphathimandla.
- NASA GIBS: Siyakwamukela ukusetshenziswa kwezithombe ezihlinzekwe yizinsiza ze-NASA Global Imagery Browse Services (GIBS), eziyingxenye ye-NASA Earth Science Data and Information System (ESDIS).
- Optional layers (5 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.
Izendlalelo nezinsuku
- Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
- Amalambu ebusuku, nsuku zonke: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Okt 2026
- Amanzi esikhukhula, inhlanganisela yezinsuku ezi-3: VIIRS Global Flood Product, NASA LANCE · 14 Okt 2026
- Imililo esebenzayo nokungajwayelekile kokushisa: VIIRS NOAA-20 375 m (FIRMS), NASA LANCE FIRMS · 13 Okt 2026
- Umbala weqiniso: VIIRS NOAA-20 corrected reflectance, NASA LANCE · 13 Okt 2026
- Land cover type (IGBP), yearly: MODIS Terra and Aqua land cover (MCD12Q1), NASA LP DAAC · 2024
What is measured, and how well.
Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.
| Indicator | Unit | Cadence | Source type | Label |
|---|---|---|---|---|
| ISO 22301 certificates issued | count | annual | ISO Survey of certifications | REPORTED |
| Essential services with set impact tolerances | share of identified services | annual | Self-assessments | DECLARED |
| Continuity exercises against severe scenarios | count per year | annual | Exercise records | DECLARED |
| Recovery time achieved against target | hours | per incident and per test | Incident and test records | OBSERVED |
| Critical suppliers with continuity assurance | share of critical suppliers | annual | Supplier management records | DECLARED |
| Public service interruptions after disasters | service hours lost | per event | Regulator and operator reports | REPORTED |
Multi-agency coordination board.
The screen a team would use to follow this subject: its measures, states and decisions. Names are examples and values are illustrative.
Multi-agency coordination board
Business continuity governance · National crisis centre · Exercise EX-98
Who leads what
| Warning | Meteorological service | Civil protection | Sula | Active |
| Evacuation | Municipality | Police | Overlap | Tasked |
| Shelter | Social services | Volunteer society | Sula | Active |
| Public information | Crisis coordinator | Konke | Gap | Unassigned |
Exercise log
- 09:00STAExercise start
- 09:31WRNRed warning issued
- 10:48GAPTwo agencies issue conflicting advice
- 11:00FIXSingle spokesperson named
After-action items
- AA-1Assign public information lead in lawPolicy owner67 d
- AA-2Shared situation picture between agenciesCrisis centre45 d
Where the evidence comes from.
Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.
| Umthombo | What it gives | Licence class |
|---|---|---|
| ISO Survey of management system standard certifications | Counts of certifications by standard and country | Free to read, ISO terms |
| Basel Committee Principles for Operational Resilience | Expectations for banks’ operational resilience and continuity | Free, BIS terms |
| Sector regulator operational resilience rules and reports | Requirements and supervisory findings for regulated sectors | Public records, terms per regulator |
| Business Continuity Institute research | Surveys of continuity practice and incidents | Free to read with registration, terms to check |
| Utility and telecom outage reports | Recorded service interruptions and causes | Public records, terms per regulator |
Compare instruments: rules, incentives and information.
Three families of instruments side by side against the baseline, each with its own lag and adoption speed, under the coverage and compliance you set; effect sizes are teaching values to replace with evidence. Scenario: named assumptions about the future, not a forecast. The map on this page shows The Caribbean; the model itself is not tied to a place.
Controls
- Baseline trend of the outcome
- 2.0% a year
- Coverage of the instrument
- 70%
- Ukuthobela imithetho
- 75%
- Effect size, against the teaching value
- 100%
- Years ahead
- 20 years
Readouts
- Largest reduction at the horizon
- Regulation
- Its reduction against the baseline
- 21%
Numbers, methods and sources
| Year | Isisekelo | Regulation | Economic incentive | Information and capacity |
|---|---|---|---|---|
| 0 | 100.0 | 99.5 | 98.8 | 99.1 |
| 1 | 102.0 | 101.2 | 100.1 | 99.8 |
| 2 | 104.0 | 102.5 | 101.1 | 99.9 |
| 3 | 106.1 | 103.5 | 101.6 | 100.0 |
| 4 | 108.2 | 103.7 | 101.8 | 100.7 |
| 5 | 110.4 | 103.2 | 101.7 | 102.1 |
| 6 | 112.6 | 102.0 | 101.6 | 103.9 |
| 7 | 114.9 | 100.4 | 101.6 | 105.9 |
| 8 | 117.2 | 99.2 | 102.1 | 108.0 |
| 9 | 119.5 | 98.6 | 102.9 | 110.1 |
| 10 | 121.9 | 98.9 | 104.2 | 112.3 |
| 11 | 124.3 | 99.7 | 105.7 | 114.5 |
| 12 | 126.8 | 101.1 | 107.4 | 116.8 |
| 13 | 129.4 | 102.7 | 109.4 | 119.2 |
| 14 | 131.9 | 104.5 | 111.4 | 121.6 |
| 15 | 134.6 | 106.5 | 113.5 | 124.0 |
| 16 | 137.3 | 108.5 | 115.7 | 126.5 |
| 17 | 140.0 | 110.7 | 118.0 | 129.0 |
| 18 | 142.8 | 112.9 | 120.4 | 131.6 |
| 19 | 145.7 | 115.1 | 122.8 | 134.2 |
| 20 | 148.6 | 117.4 | 125.2 | 136.9 |
Izindlela
- Tools of government Hood (1983), The Tools of Government, Macmillan
- Carrots, sticks and sermons Bemelmans-Videc, Rist and Vedung (1998), Transaction
- Diffusion of innovations Rogers (2003), Diffusion of Innovations, Free Press
- Uncertainty fan (parameter Monte Carlo) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
- One-at-a-time sensitivity (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley
Idatha
The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:
- Borders Natural Earth
- Cities Natural Earth
Across the six pillars, led by Nexus Consortium
- Experiments Labs
- Built in Disaster and Crisis Governance in Foundry
- Tested at Disaster and Crisis Governance in Universe
- Codified in Hazards and Disaster Risk Reduction in Standards
- Published in Disaster and Crisis Governance in Reports
- Taught in Faculty of Hazards, Disasters and Resilience in Academy
Who decides, and what the evidence serves.
Disaster and Crisis Governance prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.
| Ubani onqumayo | The question | Evidence this page serves |
|---|---|---|
| Boards and accounting officers | Which services are essential and what disruption is tolerable | Service mapping practice and comparable tolerances |
| Sector regulators | What continuity and resilience obligations apply | Comparative rules and supervisory findings |
| Civil protection authorities | How essential service operators are included in emergency plans | Dependency maps and exercise records |
| Procurement and supplier managers | Which suppliers need continuity assurance | Supplier criticality and assurance practice |
Outputs this topic produces
- Guide to impact tolerances and how they differ from recovery time objectives
- Comparative notes on continuity rules across sectors
- Dialogue briefs on shared dependencies between essential services
- Questions for boards on continuity oversight
From mandate to evaluation, by pillar.
The steps an instrument takes from mandate to evaluation, each with the pillar that runs it, and the decisions that stay with the authority. Teaching model with stated illustrative values, not a prediction. The map on this page shows The Caribbean; the model itself is not tied to a place.
- Mandate and problem framing Competent authority (outside the programme)
A competent authority frames the problem and the mandate under its own rules. Howlett, Ramesh and Perl (2009) - Evidence and system model Foundry
The system is modelled with its feedbacks, data and stated limits. OECD (2014), principle 2 - Options appraised with scenarios Foundry
Instruments are compared under scenarios, with uncertainty shown. Hood (1983) - Exercise with stakeholders Universe
The options are tested in an exercise with those who would implement and bear them. OECD (2014), principle 3 - Standard or guidance drafted Nexus Standards
What works is codified as a standard or guidance, open to comment. Nexus Standards process - Decision by the authority Competent authority (outside the programme)
The authority decides, outside the programme, with the evidence on record. Howlett, Ramesh and Perl (2009) - Capacity and training Risk Academy
Those who implement are trained on the decided instrument and its data. Sendai Framework (2015), priority 2 - Monitoring and public report Reports
Indicators are published with sources, limits and corrections. OECD (2014), principle 5 - Evaluation and revision Nexus Standards
Results return to the standard and the model: the cycle closes. Howlett, Ramesh and Perl (2009)
Izindlela
- Policy cycle Howlett, Ramesh and Perl (2009), Studying Public Policy, Oxford University Press
- Governance of critical risks OECD (2014), Recommendation of the Council on the Governance of Critical Risks
- Layered drawing of directed graphs Sugiyama, Tagawa and Toda (1981), IEEE SMC 11
Across the six pillars, led by Nexus Consortium
- Experiments Labs
- Built in Disaster and Crisis Governance in Foundry
- Tested at Disaster and Crisis Governance in Universe
- Codified in Hazards and Disaster Risk Reduction in Standards
- Published in Disaster and Crisis Governance in Reports
- Taught in Faculty of Hazards, Disasters and Resilience in Academy
What governance experts ask.
When a disaster strikes, people need power, water, telecommunications, fuel, food, payments and health care. The organisations that provide these services must keep operating while their own staff, sites and suppliers are affected. Their continuity plans, and the way those plans fit with public priorities, often decide how long a community goes without essential services.
- Which functions must continue in a crisis, at what minimum level, and what do they depend on?
- How do operators’ continuity plans align with public emergency plans and priorities for restoration?
- How are dependencies between operators, such as telecommunications needing power, managed jointly?
- What obligations do regulators place on operators, and how is compliance tested?
Exercise a cascade in business continuity governance with the people who decide.
Assembled from the Nexus Standards area profile Business continuity and resilience: the hazards it names, the systems and communities that carry the loss, the controls and institutions that dampen it and the data that observe it. Pick an initiating event and step through the cascade to see where mandates meet and which decisions fall to whom. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise for dialogue, not a forecast, an assessment or a position. To model a place of your own choosing, open the full System Builder.
Izingozi
- Dam failure
- River flood (set off downstream)
- Flash flood (set off downstream)
- Mass displacement (set off downstream)
- Widespread power outage (set off downstream)
- Water supply shortfall (set off downstream)
Systems and couplings
Controls
NS-0Umthethosisekelo nezimisoNS-9Ama-UNI omongo (ukufakwa, izibonelo, izibonelo zohlelo)NS-10Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)NS-11Ukuqinisekisa nokuqapha (ubufakazi, izifakazelo, ukuqapha ukuhambisana ngaphandle kokwethembana)NRS-K36Iphrofayela yephakethe lomkhakha: Ingqalasizinda ebalulekile (DOMAIN-036)NRS-H107Umndeni wezingozi: Ukugxila nokufana kwengqalasizinda yedijithali (NHS-1 tech.digital-concentration)NRS-H120Umndeni wezingozi: Ubuthakathaka besakhiwo bezinhlelo ezixhumene (NHS-1 sys.fragility)NRS-X8Ukuqina kokusebenza nokuqhubeka kwebhizinisiNRS-H56Umndeni wezingozi: Ukulimala okubangelwa yizingxabano (NHS-1 soc.conflict-induced)NRS-H61Umndeni wezingozi: Ukwehluleka okulandelanayo (NHS-1 sys.cascade)
Observation
- NASA Black Marble night-time lights (VNP46) (listed for reference)
- OpenStreetMap planet and replication (listed for reference)
- Number of disruptions to basic services attributed to disasters
Example geography
- Europe: 113 hexagonal cells
- Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
- Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
- Rain rate, last half hour (IMERG), NASA GIBS
- Surface soil moisture (SMAP), NASA GIBS
How the arrangements work.
Continuity governance links internal planning, sector obligations and public coordination.
Continuity management
Business impact analysis, continuity strategies and plans for loss of staff, sites, systems and suppliers.
Regulatory obligations
Many sectors require operators of essential services to plan for continuity and report incidents. Requirements and enforcement vary.
Coordination with authorities
Arrangements for information sharing, priority restoration, fuel and access during emergencies.
Information sharing between operators and authorities is often the weakest link. Operators may be reluctant to share vulnerabilities for commercial or security reasons, while authorities may lack the expertise to use what is shared. Trusted forums with clear rules on confidentiality, and joint exercises that build relationships, are common ways to overcome this.
Why now: resilience duties increasingly fall on operators directly, for example under the European Union’s rules on critical entities (2022), while continuity plans still assume that other services keep running. The platform is designed to convene operators and authorities on shared dependencies and test continuity arrangements together.
How business continuity governance is governed: instruments, mandates and commitments.
The instruments, mandates, actors and accountability arrangements a policymaker, diplomat or development agency works with, citing the agreements that set them. Structures follow the frameworks named. Any state or progress drawn is illustrative, not a record.
Mandates and agreements over time
The agreements that set mandates and commitments on business continuity governance, from adoption to their current horizon.
- 2015Sendai Framework for Disaster Risk ReductionUNDRR
- 20152030 Agenda and the Sustainable Development GoalsUnited Nations
- 2030Horizon of the 2030 Agenda and the Sendai FrameworkUnited Nations
How the evidence is built, and its limits.
- 01
Continuity plan review
Review of plans and their assumptions. Plans often assume that other services will be available.
- 02
Dependency analysis
Mapping of dependencies between operators. Commercial confidentiality can limit sharing.
- 03
Joint exercises
Exercises involving operators and authorities test whether plans work together.
- 04
Incident analysis
Review of service disruptions and restoration times after events.
How it is studied, and what the methods cannot say.
- 01Optimisation and operations researchPre-positioning relief stocks · Evacuation and relief routing · Sequencing recovery investmentApplied here
- 02Decision analysis under uncertaintyWarning thresholds and false alarms · Pre-agreed triggers for actionApplied here
- 03Policy, institutional and decision scienceComparing emergency law · Tracing recurring findings · Mapping coordination structuresApplied here
Questions and answers.
What is an impact tolerance?
What does ISO 22301 cover?
Is continuity the same as disaster recovery?
Why is business continuity a governance question?
Does the platform audit continuity plans?
What is a common weakness in continuity plans?
Are small businesses included?
Nikela ngobufakazi kusuka kuleli khasi.
Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.
- EmailGateway GW-GRFSend it from this pageEvidence, a correction, a case, a method, a review, a translation or profile input. It arrives tagged with this page, so the editor who owns it receives it.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsGlobal Risks ForumSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
Ungalokothi uthumele idatha yomuntu siqu, imininingwane ebucayi yengqalasizinda noma noma yini ongenalo ilungelo lokuyabelana ngayo. Umnikelo ubuyekezwa ngaphambi kokusetshenziswa; ukuwuthumela akunikezi ubuqambi noma amalungelo okuhlela, futhi ukusekela akuthengi muphumela.
Bring a governance question to the Forum.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Legal documents.
Show all 18 legal documents
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.