Skip to content

GRF · Disaster and Crisis Governance

Business continuity governance

When a disaster strikes, hospitals, utilities, banks, ports and ministries must keep their essential services running. Business continuity governance decides which services are essential, how long they may be interrupted and who answers if they fail. ISO 22301 and sector rules on operational resilience set the frame. This page sets out how continuity governance works and fails, the records that show it, and who holds the decisions.

02The question

Business continuity governance: how the risk develops.

Operator and public coordination. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mechanism

Essential services are defined

Continuity starts by identifying the services whose interruption would cause harm, and setting tolerances for how long and how much disruption is acceptable. Without that, plans protect systems rather than outcomes.

Mechanism

Dependencies hide single points

Services rely on power, telecom, suppliers and staff who may all be affected by the same event. Plans that ignore shared dependencies fail when the backup shares the same weak point.

Mechanism

Boards own continuity

Continuity is a governing body responsibility. Where it sits only with an operational team, investment decisions do not reflect tolerances and gaps surface in an event.

Mechanism

Plans decay untested

Staff change, systems are replaced and suppliers shift. Plans that are not exercised against severe, plausible scenarios lose accuracy without anyone noticing.

03Geography

People and hazards in the Caribbean.

Population density, night lights and flood water over the Caribbean, from NASA GIBS. Each layer carries its own date.

Die interaktiewe kaart benodig JavaScript; die laaglys en bronne is hieronder.

Lae 3

People and hazards, for this page

Oor hierdie laag
Bewyse
Geskat
Bron
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Columbia-universiteit))
Verskaffer
NASA SEDAC (CIESIN, Columbia-universiteit)
Lisensie
CC BY 4.0
Oesjaar
null; Sensusgebaseerde skatting, staties (2020)
Resolusie
ongeveer 1 km-rooster
Onsekerheid
Sensusgebaseerde skatting van mense per vierkante kilometer in 2020, getoon as blootstellingskonteks; nie ’n telling van mense wat deur enige gevaar geraak word nie.
Bereik deur
hierdie werf se data-aanstuurder, vanaf gibs.earthdata.nasa.gov
Oor hierdie laag
Bewyse
Waargeneem
Bron
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Verskaffer
NASA LAADS DAAC
Lisensie
NASA-oopdata
Oesjaar
daagliks; Satellietstraling, gekorrigeer vir maanlig en atmosfeer
Nuutste by bou
2026-10-12
Resolusie
ongeveer 500 m-rooster
Onsekerheid
Satelliet-nagstraling vir die getoonde datum; ligte is ’n benadering van elektrisiteitsgebruik en onderbrekings, nie ’n meting van voorsiening of toegang nie.
Bereik deur
hierdie werf se data-aanstuurder, vanaf gibs.earthdata.nasa.gov
Oor hierdie laag
Bewyse
Waargeneem (wolke laat gapings)
Bron
VIIRS Wêreldwye Vloedproduk (NASA LANCE)
Verskaffer
NASA LANCE
Lisensie
NASA-oopdata
Oesjaar
daagliks; Satellietopsporing; wolke laat gapings
Nuutste by bou
2026-10-14
Resolusie
ongeveer 250 m-rooster
Onsekerheid
Satellietopsporing; wolke laat gapings. Satelliet- of modelraster soos die verskaffer dit publiseer. Wolke, baangapings en herwinningsfoute laat gapings en geraas; waardes is aanwysers, nie metings op ’n plek nie.
Bereik deur
hierdie werf se data-aanstuurder, vanaf gibs.earthdata.nasa.gov
Oor hierdie laag
Bewyse
Waargeneem (wolke en oorvlugtye laat gapings)
Bron
VIIRS NOAA-20 375 m (FIRMS) (NASA LANCE FIRMS)
Verskaffer
NASA LANCE FIRMS
Lisensie
NASA-oopdata
Oesjaar
daagliks; Satellietopsporing; wolke en oorvlugtye laat gapings
Nuutste by bou
2026-10-13
Resolusie
ongeveer 500 m-rooster
Onsekerheid
Satellietopsporings van hittekolle vir die getoonde dag, insluitend gasfakkels en industriële hitte; nie ’n bevestigde brand, ’n insidentverslag of ’n waarskuwing nie.
Bereik deur
hierdie werf se data-aanstuurder, vanaf gibs.earthdata.nasa.gov
Oor hierdie laag
Bewyse
Waargeneem
Bron
VIIRS NOAA-20 corrected reflectance (NASA LANCE)
Verskaffer
NASA LANCE
Lisensie
NASA-oopdata
Oesjaar
daily; Satellite image
Nuutste by bou
2026-10-14
Resolusie
ongeveer 250 m-rooster
Onsekerheid
Satellite image. Satellite or model raster as the provider publishes it. Clouds, swath gaps and retrieval error leave gaps and noise; values are indicators, not measurements at a place.
Bereik deur
hierdie werf se data-aanstuurder, vanaf gibs.earthdata.nasa.gov
Oor hierdie laag
Bewyse
Modelled (latest year GIBS publishes)
Bron
MODIS Terra and Aqua land cover (MCD12Q1) (NASA LP DAAC)
Verskaffer
NASA LP DAAC
Lisensie
NASA-oopdata
Oesjaar
yearly; Satellite classification; latest year GIBS publishes
Nuutste by bou
2024-01-01
Resolusie
ongeveer 500 m-rooster
Onsekerheid
Satellite land cover classes for the year shown, including croplands; a classification with known errors, not a farm register.
Bereik deur
hierdie werf se data-aanstuurder, vanaf gibs.earthdata.nasa.gov

Nuutste beskikbaar

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap-bydraers (ODbL) · Natural Earth

Laai tans die nuutste NASA-beelde.

Sleep om te skuif. Ctrl of ⌘ en rol, knyp of die knoppies om te zoem; sweef vir die waardes onder die wyser; terugstel keer terug na die streek.

People and hazards, framed on the Caribbean.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Gegewens: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap-bydraers · Natural Earth · NASA EONET · Amerikaanse Geologiese OpnameBronne en lisensies

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • NASA Fire Information for Resource Management System (FIRMS), VIIRS 375 m active fire product, NASA LANCE; vector tiles via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Gemaak met Natural Earth. Gratis vektor- en rasterkaartdata @ naturalearthdata.com. Openbare domein
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Konteks op die aardbol en platkaart: kuslyne, grense, paaie en plekname uit NASA GIBS-verwysingslae (OpenStreetMap-data, ODbL, © OpenStreetMap contributors); Blue Marble-beelde as 'n opsionele basis; 3D-terrein en die hoogte-aflesing vanaf die ASTER GDEM-hoogtekleurindeks (klasse van 5 m tot 200 m, vir leesbaarheid oordryf). Grense word geteken soos gepubliseer en impliseer geen standpunt oor enige gebied nie.
  • Lewende gebeure: NASA Earth Observatory Natural Event Tracker (EONET); gebeure is aanduidend en behou hul oorspronklike bronskakels.
  • Lewend: NASA EONET. Gebeure is aanduidend, nie owerheidswaarskuwings nie.
  • Lewend: U.S. Geological Survey. Gebeure is aanduidend, nie owerheidswaarskuwings nie.
  • NASA GIBS: Ons erken die gebruik van beelde verskaf deur dienste van NASA se Global Imagery Browse Services (GIBS), deel van NASA se Earth Science Data and Information System (ESDIS).
  • Optional layers (5 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Lae en datums

  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Naglig, daagliks: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Okt. 2026
  • Vloedwater, 3-dae-saamgestelde beeld: VIIRS Global Flood Product, NASA LANCE · 14 Okt. 2026
  • Aktiewe brande en termiese afwykings: VIIRS NOAA-20 375 m (FIRMS), NASA LANCE FIRMS · 13 Oktober 2026
  • Ware kleur: VIIRS NOAA-20 gekorrigeerde weerkaatsing, NASA LANCE · 13 Oktober 2026
  • Land cover type (IGBP), yearly: MODIS Terra and Aqua land cover (MCD12Q1), NASA LP DAAC · 2024

04Aanwysers

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeLabel
ISO 22301 certificates issuedcountannualISO Survey of certificationsREPORTED
Essential services with set impact tolerancesshare of identified servicesannualSelf-assessmentsDECLARED
Continuity exercises against severe scenarioscount per yearannualExercise recordsDECLARED
Recovery time achieved against targethoursper incident and per testIncident and test recordsOBSERVED
Critical suppliers with continuity assuranceshare of critical suppliersannualSupplier management recordsDECLARED
Public service interruptions after disastersservice hours lostper eventRegulator and operator reportsREPORTED
05Monitor

Multi-agency coordination board.

The screen a team would use to follow this subject: its measures, states and decisions. Names are examples and values are illustrative.

Multi-agency coordination board

Business continuity governance · National crisis centre · Exercise EX-98

Coordination exerciseGRF · Disaster and Crisis Governance

Who leads what

WarningMeteorological serviceCivil protectionDuidelikActive
EvacuationMunicipalityPoliceOverlapTasked
ShelterSocial servicesVolunteer societyDuidelikActive
Public informationCrisis coordinatorAllGapUnassigned

Exercise log

  1. 09:00STAExercise start
  2. 09:31WRNRed warning issued
  3. 10:48GAPTwo agencies issue conflicting advice
  4. 11:00FIXSingle spokesperson named

After-action items

  1. AA-1Assign public information lead in lawPolicy owner67 d
  2. AA-2Shared situation picture between agenciesCrisis centre45 d
Multi-agency coordination board: the screen’s structure, terms and states for Business continuity governance.Example names and illustrative values; a design, not a record or a live system.
06Bronne

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

BronWhat it givesLicence class
ISO Survey of management system standard certificationsCounts of certifications by standard and countryFree to read, ISO terms
Basel Committee Principles for Operational ResilienceExpectations for banks’ operational resilience and continuityFree, BIS terms
Sector regulator operational resilience rules and reportsRequirements and supervisory findings for regulated sectorsPublic records, terms per regulator
Business Continuity Institute researchSurveys of continuity practice and incidentsFree to read with registration, terms to check
Utility and telecom outage reportsRecorded service interruptions and causesPublic records, terms per regulator
07Policy scenarios

Compare instruments: rules, incentives and information.

Three families of instruments side by side against the baseline, each with its own lag and adoption speed, under the coverage and compliance you set; effect sizes are teaching values to replace with evidence. Scenario: named assumptions about the future, not a forecast. The map on this page shows The Caribbean; the model itself is not tied to a place.

Controls

Baseline trend of the outcome
2.0% a year
Coverage of the instrument
70%
Nakoming
75%
Effect size, against the teaching value
100%
Years ahead
20 years

Readouts

Largest reduction at the horizon
Regulation
Its reduction against the baseline
21%
Numbers, methods and sources
YearBasislynRegulationEconomic incentiveInformation and capacity
0100.099.598.899.1
1102.0101.2100.199.8
2104.0102.5101.199.9
3106.1103.5101.6100.0
4108.2103.7101.8100.7
5110.4103.2101.7102.1
6112.6102.0101.6103.9
7114.9100.4101.6105.9
8117.299.2102.1108.0
9119.598.6102.9110.1
10121.998.9104.2112.3
11124.399.7105.7114.5
12126.8101.1107.4116.8
13129.4102.7109.4119.2
14131.9104.5111.4121.6
15134.6106.5113.5124.0
16137.3108.5115.7126.5
17140.0110.7118.0129.0
18142.8112.9120.4131.6
19145.7115.1122.8134.2
20148.6117.4125.2136.9

Metodes

  1. Tools of government Hood (1983), The Tools of Government, Macmillan
  2. Carrots, sticks and sermons Bemelmans-Videc, Rist and Vedung (1998), Transaction
  3. Diffusion of innovations Rogers (2003), Diffusion of Innovations, Free Press
  4. Uncertainty fan (parameter Monte Carlo) Spiegelhalter, Pearson and Short (2011), Visualising uncertainty about the future, Science 333
  5. One-at-a-time sensitivity (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Data

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:

  • Borders Natural Earth
  • Cities Natural Earth
Compare instruments: rules, incentives and information. Illustrative teaching model: it runs on the values set by the controls, not on measured data. Methods: Tools of government (Hood (1983), The Tools of Government, Macmillan); Carrots, sticks and sermons (Bemelmans-Videc, Rist and Vedung (1998), Transaction); Diffusion of innovations (Rogers (2003), Diffusion of Innovations, Free Press).
08Decisions

Who decides, and what the evidence serves.

Disaster and Crisis Governance prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Wie besluitThe questionEvidence this page serves
Boards and accounting officersWhich services are essential and what disruption is tolerableService mapping practice and comparable tolerances
Sector regulatorsWhat continuity and resilience obligations applyComparative rules and supervisory findings
Civil protection authoritiesHow essential service operators are included in emergency plansDependency maps and exercise records
Procurement and supplier managersWhich suppliers need continuity assuranceSupplier criticality and assurance practice

Outputs this topic produces

  • Guide to impact tolerances and how they differ from recovery time objectives
  • Comparative notes on continuity rules across sectors
  • Dialogue briefs on shared dependencies between essential services
  • Questions for boards on continuity oversight
09Implementering

From mandate to evaluation, by pillar.

The steps an instrument takes from mandate to evaluation, each with the pillar that runs it, and the decisions that stay with the authority. Teaching model with stated illustrative values, not a prediction. The map on this page shows The Caribbean; the model itself is not tied to a place.

  1. Mandate and problem framing Competent authority (outside the programme)
    A competent authority frames the problem and the mandate under its own rules. Howlett, Ramesh and Perl (2009)
  2. Evidence and system model Foundry
    The system is modelled with its feedbacks, data and stated limits. OECD (2014), principle 2
  3. Options appraised with scenarios Foundry
    Instruments are compared under scenarios, with uncertainty shown. Hood (1983)
  4. Exercise with stakeholders Universe
    The options are tested in an exercise with those who would implement and bear them. OECD (2014), principle 3
  5. Standard or guidance drafted Nexus Standards
    What works is codified as a standard or guidance, open to comment. Nexus Standards process
  6. Decision by the authority Competent authority (outside the programme)
    The authority decides, outside the programme, with the evidence on record. Howlett, Ramesh and Perl (2009)
  7. Capacity and training Risk Academy
    Those who implement are trained on the decided instrument and its data. Sendai Framework (2015), priority 2
  8. Monitoring and public report Reports
    Indicators are published with sources, limits and corrections. OECD (2014), principle 5
  9. Evaluation and revision Nexus Standards
    Results return to the standard and the model: the cycle closes. Howlett, Ramesh and Perl (2009)

Metodes

  1. Policy cycle Howlett, Ramesh and Perl (2009), Studying Public Policy, Oxford University Press
  2. Governance of critical risks OECD (2014), Recommendation of the Council on the Governance of Critical Risks
  3. Layered drawing of directed graphs Sugiyama, Tagawa and Toda (1981), IEEE SMC 11
From mandate to evaluation, by pillar: the steps as recorded, each with its pillar; sources as cited on each step.
10Core questions

What governance experts ask.

When a disaster strikes, people need power, water, telecommunications, fuel, food, payments and health care. The organisations that provide these services must keep operating while their own staff, sites and suppliers are affected. Their continuity plans, and the way those plans fit with public priorities, often decide how long a community goes without essential services.

  • Which functions must continue in a crisis, at what minimum level, and what do they depend on?
  • How do operators’ continuity plans align with public emergency plans and priorities for restoration?
  • How are dependencies between operators, such as telecommunications needing power, managed jointly?
  • What obligations do regulators place on operators, and how is compliance tested?
11Twin and cascade simulator

Exercise a cascade in business continuity governance with the people who decide.

Assembled from the Nexus Standards area profile Business continuity and resilience: the hazards it names, the systems and communities that carry the loss, the controls and institutions that dampen it and the data that observe it. Pick an initiating event and step through the cascade to see where mandates meet and which decisions fall to whom. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise for dialogue, not a forecast, an assessment or a position. To model a place of your own choosing, open the full System Builder.

Gevare

  • Dam failure
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • Mass displacement (set off downstream)
  • Widespread power outage (set off downstream)
  • Water supply shortfall (set off downstream)

Controls

  • NS-0 Grondwet en beginsels
  • NS-9 Kontekstuele UNI's (ontplooiings, instansies, programinstansies)
  • NS-10 Policies and clauses (machine-readable obligations: definition, binding, evaluation and enforcement)
  • NS-11 Verifikasie en monitering (getuienis, attestasies, zero-trust-ooreenstemmingwaarneming)
  • NRS-K36 Domain pack profile: Critical infrastructure (DOMAIN-036)
  • NRS-H107 Hazard family: Digital infrastructure concentration and monoculture (NHS-1 tech.digital-concentration)
  • NRS-H120 Hazard family: Structural fragility of interconnected systems (NHS-1 sys.fragility)
  • NRS-X8 Operational resilience and business continuity
  • NRS-H56 Hazard family: Conflict-induced harm (NHS-1 soc.conflict-induced)
  • NRS-H61 Hazard family: Cascading failure (NHS-1 sys.cascade)

Observation

  • NASA Black Marble night-time lights (VNP46) (listed for reference)
  • OpenStreetMap planet and replication (listed for reference)
  • Number of disruptions to basic services attributed to disasters

Example geography

  • Europe: 113 hexagonal cells
  • Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
  • Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Rain rate, last half hour (IMERG), NASA GIBS
  • Surface soil moisture (SMAP), NASA GIBS
12Mechanisms

How the arrangements work.

Continuity governance links internal planning, sector obligations and public coordination.

Internal

Continuity management

Business impact analysis, continuity strategies and plans for loss of staff, sites, systems and suppliers.

Sector

Regulatory obligations

Many sectors require operators of essential services to plan for continuity and report incidents. Requirements and enforcement vary.

Openbaar

Coordination with authorities

Arrangements for information sharing, priority restoration, fuel and access during emergencies.

Information sharing between operators and authorities is often the weakest link. Operators may be reluctant to share vulnerabilities for commercial or security reasons, while authorities may lack the expertise to use what is shared. Trusted forums with clear rules on confidentiality, and joint exercises that build relationships, are common ways to overcome this.

Why now: resilience duties increasingly fall on operators directly, for example under the European Union’s rules on critical entities (2022), while continuity plans still assume that other services keep running. The platform is designed to convene operators and authorities on shared dependencies and test continuity arrangements together.

13Instruments and commitments

How business continuity governance is governed: instruments, mandates and commitments.

The instruments, mandates, actors and accountability arrangements a policymaker, diplomat or development agency works with, citing the agreements that set them. Structures follow the frameworks named. Any state or progress drawn is illustrative, not a record.

Mandates and agreements over time

The agreements that set mandates and commitments on business continuity governance, from adoption to their current horizon.

  1. 2015Sendai Framework for Disaster Risk ReductionUNDRR
  2. 20152030 Agenda and the Sustainable Development GoalsUnited Nations
  3. 2030Horizon of the 2030 Agenda and the Sendai FrameworkUnited Nations
Adoption years of the agreements named; the texts and their bodies are the authority. Chosen from the page’s fields.
Sendai Framework for Disaster Risk Reduction · UNDRRParis Agreement · UNFCCC2030 Agenda and the Sustainable Development Goals · United NationsInternational Health Regulations · WHO
14Methods and evidence

How the evidence is built, and its limits.

  1. 01

    Continuity plan review

    Review of plans and their assumptions. Plans often assume that other services will be available.

  2. 02

    Dependency analysis

    Mapping of dependencies between operators. Commercial confidentiality can limit sharing.

  3. 03

    Joint exercises

    Exercises involving operators and authorities test whether plans work together.

  4. 04

    Incident analysis

    Review of service disruptions and restoration times after events.

15Metodes

How it is studied, and what the methods cannot say.

  1. Optimisation and operations researchPre-positioning relief stocks · Evacuation and relief routing · Sequencing recovery investmentApplied here
  2. Decision analysis under uncertaintyWarning thresholds and false alarms · Pre-agreed triggers for actionApplied here
  3. Policy, institutional and decision scienceComparing emergency law · Tracing recurring findings · Mapping coordination structuresApplied here
16Vrae

Questions and answers.

What is an impact tolerance?
The maximum tolerable level of disruption to an important service, such as a maximum outage time, beyond which harm to users or the system becomes intolerable. Several financial regulators use the term.
What does ISO 22301 cover?
Requirements for a business continuity management system: understanding the organisation, setting objectives, planning, exercising and improving continuity arrangements.
Is continuity the same as disaster recovery?
Disaster recovery usually refers to restoring technology systems. Business continuity covers the whole service, including people, premises, suppliers and communication.
Why is business continuity a governance question?
Because essential services are often private, and their continuity decisions affect public safety. Aligning private plans with public priorities requires governance arrangements.
Does the platform audit continuity plans?
No. It convenes dialogue and research and does not assess, audit or certify any organisation.
What is a common weakness in continuity plans?
Assuming that other services, such as power, telecommunications or fuel supply, will remain available. Joint planning reveals these hidden dependencies.
Are small businesses included?
Yes. Small businesses are vital for local recovery and often have the least capacity to plan, so their needs are part of the discussion.
VerslaeDra by

Dra bewyse vanaf hierdie bladsy by.

Reports is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks ForumDisaster and Crisis GovernanceUniverse Annual SynthesisEvidence Brief
Ramp- en krisisbeheer

Bring a governance question to the Forum.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.