Investment governance concerns how public and quasi-public investors are mandated, overseen and held to account: sovereign wealth funds, public pension reserves, public development banks, state-owned enterprises and central bank reserve portfolios. It asks who sets the mandate, who executes, who checks, and how conflicts between political, fiduciary and policy objectives are managed. This page sets out the principles, the roles they separate and the evidence that oversight bodies use.

02A pergunta

Investment governance: how the risk develops.

Roles, oversight and conflicts. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mecanismo

Separating owner and manager

Good practice separates the owner who sets the mandate and apetite a risco from the manager who executes and the board that oversees. When the roles merge, accountability blurs and political direction can bypass the mandate.

Mecanismo

Conflicts of objective

A fund asked to earn returns, support domestic development and stabilise the budget faces trade-offs. Unstated priorities resolve conflicts case by case and weaken oversight of every one of them.

Mecanismo

Information asymmetry

Managers know more than owners and owners more than citizens. Disclosure of mandates, holdings policy, costs and performance against benchmark is what lets oversight work.

Mecanismo

Quasi-fiscal leakage

Directed lending, below-market support or withdrawals outside the rules turn an investment vehicle into an off-budget spending channel and move risk to the public balance sheet without a vote.

03Geografia

Pessoas e ameaças na América Latina e no Caribe.

Densidade populacional, luzes noturnas e água de inundação sobre a América Latina e o Caribe, a partir do NASA GIBS. Cada camada tem sua própria data.

O mapa interativo requer JavaScript. A lista de camadas e as fontes estão abaixo.

Camadas 3

Pessoas e ameaças, para esta página

Sobre esta camada
Evidências
Estimado
Fonte
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Universidade Columbia))
Provedor
NASA SEDAC (CIESIN, Universidade Columbia)
Licença
CC BY 4.0
Versão dos dados
null; estimativa baseada em censo, estática (2020)
Resolução
grade de cerca de 1 km
Incerteza
Estimativa baseada no censo de pessoas por quilômetro quadrado em 2020, exibida como contexto de exposição; não é uma contagem das pessoas afetadas por qualquer ameaça.
Acessível por
gibs.earthdata.nasa.gov, somente depois que você permitir o mapa ao vivo
Sobre esta camada
Evidências
Observado
Fonte
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Provedor
NASA LAADS DAAC
Licença
Dados abertos da NASA
Versão dos dados
diário; radiância de satélite, corrigida pelo luar e pela atmosfera
Mais recente na compilação
2026-10-12
Resolução
grade de cerca de 500 m
Incerteza
Radiância noturna de satélite para a data exibida; as luzes são um indicador indireto do uso de eletricidade e de apagões, não uma medida do fornecimento ou do acesso.
Acessível por
gibs.earthdata.nasa.gov, somente depois que você permitir o mapa ao vivo
Sobre esta camada
Evidências
Observado (as nuvens deixam lacunas)
Fonte
Produto VIIRS de inundações globais (NASA LANCE)
Provedor
NASA LANCE
Licença
Dados abertos da NASA
Versão dos dados
diário; detecção por satélite; as nuvens deixam lacunas
Mais recente na compilação
2026-10-14
Resolução
grade de cerca de 250 m
Incerteza
Detecção por satélite; as nuvens deixam lacunas. Raster de satélite ou de modelo tal como o provedor o publica. Nuvens, lacunas de faixa e erro de recuperação deixam falhas e ruído; os valores são indicadores, não medições em um local.
Acessível por
gibs.earthdata.nasa.gov, somente depois que você permitir o mapa ao vivo
Sobre esta camada
Evidências
Observado (as nuvens e o horário de passagem deixam lacunas)
Fonte
VIIRS NOAA-20 375 m (FIRMS) (NASA LANCE FIRMS)
Provedor
NASA LANCE FIRMS
Licença
Dados abertos da NASA
Versão dos dados
diário; detecção por satélite; as nuvens e o horário de passagem deixam lacunas
Mais recente na compilação
2026-10-13
Resolução
grade de cerca de 500 m
Incerteza
Detecções por satélite de pontos de calor do dia exibido, incluindo queimadores de gás e calor industrial; não é um incêndio confirmado, um relatório de incidente nem um alerta.
Acessível por
gibs.earthdata.nasa.gov, somente depois que você permitir o mapa ao vivo
Sobre esta camada
Evidências
Observado
Fonte
VIIRS NOAA-20 refletância corrigida (NASA LANCE)
Provedor
NASA LANCE
Licença
Dados abertos da NASA
Versão dos dados
diário; imagem de satélite
Mais recente na compilação
2026-10-14
Resolução
grade de cerca de 250 m
Incerteza
Imagem de satélite. Raster de satélite ou de modelo tal como o provedor o publica. Nuvens, lacunas de faixa e erro de recuperação deixam falhas e ruído; os valores são indicadores, não medições em um local.
Acessível por
gibs.earthdata.nasa.gov, somente depois que você permitir o mapa ao vivo
Sobre esta camada
Evidências
Modelado (último ano publicado pelo GIBS)
Fonte
MODIS Terra and Aqua land cover (MCD12Q1) (NASA LP DAAC)
Provedor
NASA LP DAAC
Licença
Dados abertos da NASA
Versão dos dados
anual; classificação de satélite; último ano publicado pelo GIBS
Mais recente na compilação
2024-01-01
Resolução
grade de cerca de 500 m
Incerteza
Classes de cobertura da terra por satélite do ano exibido, incluindo terras agrícolas; uma classificação com erros conhecidos, não um cadastro rural.
Acessível por
gibs.earthdata.nasa.gov, somente depois que você permitir o mapa ao vivo

Mais recente disponível

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © colaboradores do OpenStreetMap (ODbL) · Natural Earth

Carregando as imagens mais recentes da NASA.

Arraste para mover. Use Ctrl ou ⌘ e role, o gesto de pinça ou os botões para ampliar. Passe o cursor para ver os valores sob o ponteiro. Redefinir volta à região.

Pessoas e ameaças, com enquadramento na América Latina e no Caribe.Produtos de satélite e de modelos como a NASA os publica, cada um com sua própria data. São indicadores, não avaliações de nenhum lugar.

Dados: NASA GIBS · ASTER GDEM · Blue Marble · © colaboradores do OpenStreetMap · Natural Earth · NASA EONET · Serviço Geológico dos EUA (USGS)Fontes e licenças

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Dados abertos da NASA
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Dados abertos da NASA
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Com licença CC BY 4.0. Cores redesenhadas a partir da paleta publicada; valores com média em células hexagonais quando mostrados (modificado). doi:10.7927/H49C6VHW. CC BY 4.0
  • Luzes noturnas VIIRS Black Marble, NASA Goddard Space Flight Center; distribuídas pelo NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagens através da NASA GIBS. Cores redesenhadas a partir do mapa de cores publicado; valores agregados em células hexagonais onde apresentados (modificado). Dados abertos da NASA
  • Produtos VIIRS em tempo quase real (cheias, temperatura da superfície terrestre, cobertura de neve, refletância corrigida), NASA LANCE; imagens através da NASA GIBS. Cores redesenhadas a partir do mapa de cores publicado; valores agregados em células hexagonais onde apresentados (modificado). Dados abertos da NASA
  • Fire Information for Resource Management System (FIRMS) da NASA, produto de incêndios ativos VIIRS 375 m, NASA LANCE; mosaicos vetoriais através da NASA GIBS. Cores redesenhadas a partir do mapa de cores publicado; valores agregados em células hexagonais onde apresentados (modificado). Dados abertos da NASA
  • Produtos terrestres MODIS (índices de vegetação, produção primária bruta, ocupação do solo), NASA LP DAAC e LANCE; imagens através da NASA GIBS. Cores redesenhadas a partir do mapa de cores publicado; valores agregados em células hexagonais onde apresentados (modificado). Dados abertos da NASA
  • O ASTER GDEM é um produto do METI e da NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagens através da NASA GIBS. Cores redesenhadas a partir do mapa de cores publicado; valores agregados em células hexagonais onde apresentados (modificado). Citar como: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. Dados abertos da NASA
  • Feito com Natural Earth. Dados cartográficos vetoriais e matriciais gratuitos em naturalearthdata.com. Domínio público
  • © Colaboradores do OpenStreetMap (ODbL), via NASA GIBS (costas, limites, estradas e nomes de locais). Cores redesenhadas a partir do mapa de cores publicado; valores com média em células hexagonais onde apresentados (modificado). ODbL
  • Blue Marble, NASA Earth Observatory; imagens através da NASA GIBS. Cores redesenhadas a partir do mapa de cores publicado; valores agregados em células hexagonais onde apresentados (modificado). Dados abertos da NASA
  • Contexto no globo e no mapa plano: litorais, fronteiras, estradas e nomes de lugares das camadas de referência da NASA GIBS (dados do OpenStreetMap, ODbL, © colaboradores do OpenStreetMap). Imagens Blue Marble como base opcional. Terreno 3D e leitura de elevação a partir do índice de cores de elevação do ASTER GDEM (classes de 5 m a 200 m, exageradas para facilitar a leitura). As fronteiras são desenhadas como publicadas e não implicam posição sobre nenhum território.
  • Eventos ao vivo: NASA Earth Observatory Natural Event Tracker (EONET). Os eventos são indicativos e mantêm os links para suas fontes originais.
  • Ao vivo: NASA EONET. Os eventos são indicativos, não alertas de autoridades.
  • Contexto: © OpenStreetMap contributors (ODbL), via NASA GIBS. © OpenStreetMap contributors (ODbL), renderizado pelo NASA GIBS.
  • Ao vivo: U.S. Geological Survey. Os eventos são indicativos, não alertas de autoridades.
  • NASA GIBS: We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS).
  • As camadas opcionais (5 fontes na lista de camadas: em direto, previsão, observado e contexto) mostram o crédito do fornecedor no mapa e aqui quando ativadas; as previsões são resultados de modelos e os índices derivados são estimativas.

Camadas e datas

  • Densidade populacional, 2020: População: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · estático
  • Luzes noturnas, diárias: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 out. 2026
  • Água de inundação, composto de 3 dias: VIIRS Global Flood Product, NASA LANCE · 14 out. 2026
  • Focos de incêndio ativos e anomalias térmicas: VIIRS NOAA-20 375 m (FIRMS), NASA LANCE FIRMS · 13 out. 2026
  • Cor verdadeira: reflectância corrigida VIIRS NOAA-20, NASA LANCE · 13 out. 2026
  • Tipo de cobertura do solo (IGBP), anual: MODIS Terra e Aqua cobertura do solo (MCD12Q1), NASA LP DAAC · 2024

04Indicadores

O que é medido e com que qualidade.

Cada indicador leva sua unidade, sua periodicidade, o tipo de fonte por trás dele e a etiqueta de evidência que um valor levaria. Nenhum valor é mostrado: um programa os fornece sob sua própria autoridade.

IndicadorUnidadeCadênciaTipo de fonteRótulo
Published investment mandate and apetite a riscodisclosed (yes or no)anualFund and agency publicationsDECLARADO
Santiago Principles self-assessment publisheddisclosed (yes or no)anualIFSWF member recordsDECLARADO
Independent board memberspercent of board seatsanualAnnual reports and governance statementsREPORTADO
Withdrawals and transfers against statutory rulescompliant or non-compliant per transferanualBudget and fund accounts, audit reportsEstatísticas publicadas
State-owned enterprise ownership policy in forcedisclosed (yes or no)por revisãoGovernment ownership reportsDECLARADO
Audit opinion on fund financial statementscategory (unqualified, qualified, adverse, disclaimer)anualSupreme audit institution or external auditorEstatísticas publicadas
Related-party and directed transactions disclosedcontagemanualAnnual reportsREPORTADO
05Monitoramento

Carteira de investimento público.

A tela que uma equipe usaria para acompanhar esta matéria: suas medidas, estados e decisões. Os nomes são exemplos e os valores são ilustrativos.

Carteira de investimento público

Investment governance · Member state A · Budget cycle 1

4 projects unscreenedGRF · Capital Nexus

Cadeia de processamento

Melhoria da estrada costeiraTransportesRisco elevadoRefazerAvaliação prévia
Hospital distritalSaúdeMédioConcluídoComité
Projeto de irrigaçãoAgriculturaMédioConcluídoFinanciamento
Minirredes solaresA energiaBaixoConcluídoCompras

Comité

Próxima reunião
week 6
Quórum
6 members
Conflitos
declarado, registrado
Papel do GRF
convocação e métodos

Ciclo de investimento

  1. Identificarnecessidades
  2. Triarclima e desastres
  3. Avaliarcusto-benefício
  4. Selecionarcomitê
  5. Finançascombinação
  6. Implementarmonitorar
  7. Avaliarex post
Public investment pipeline: the screen’s structure, terms and states for Investment governance.Nomes de exemplo e valores ilustrativos; um projeto, não um registro nem um sistema ativo.
06Fontes

De onde vêm as evidências.

Conjuntos de dados públicos nomeados e registros institucionais, cada um com sua classe de licença. As fontes obtidas por acordo só são usadas nos seus termos e nunca são republicadas.

FonteO que ofereceClasse de licença
International Forum of Sovereign Wealth Funds publicationsSantiago Principles and member self-assessmentsPublic, IFSWF terms
OECD Guidelines on Corporate Governance of State-Owned Enterprises and country reviewsStandards and peer reviews for state ownershipCC BY 4.0
OECD Pension Markets in Focus and public pension reserve fund dataAssets, allocation and governance features of pension fundsCC BY 4.0
IMF Fiscal Transparency EvaluationsCoverage of public corporations and funds in fiscal reportingGratuito, direitos de autor e termos de uso do FMI
Annual reports and audited statements of public investorsMandates, governance statements, costs and performancePublic records, terms per institution
Supreme audit institution reports (INTOSAI members)Audit opinions and performance audits of public investment vehiclesPublic records, terms per institution
07Cenários de política

Comparar instrumentos: regras, incentivos e informação.

Três famílias de instrumentos lado a lado em relação à linha de base, cada uma com sua própria defasagem e velocidade de adoção, conforme a cobertura e a conformidade que você definir; os tamanhos de efeito são valores didáticos a substituir por evidências. Cenário: premissas nomeadas sobre o futuro, não uma previsão. O mapa desta página mostra a América Latina e o Caribe; o modelo em si não está atrelado a um lugar.

Controles

Tendência de base do resultado
2,0% ao ano
Cobertura do instrumento
70%
Conformidade
75%
Tamanho do efeito, em relação ao valor didático
100%
Anos à frente
20 anos

Leituras

Maior redução no horizonte
Regulação
Sua redução em relação à linha de base
21%
Números, métodos e fontes
AnoLinha de baseRegulaçãoIncentivo econômicoInformação e capacidades
0100.099.598.899.1
1102.0101.2100.199.8
2104.0102.5101.199.9
3106.1103.5101.6100.0
4108.2103.7101.8100.7
5110.4103.2101.7102.1
6112.6102.0101.6103.9
7114.9100.4101.6105.9
8117.299.2102.1108.0
9119.598.6102.9110.1
10121.998.9104.2112.3
11124.399.7105.7114.5
12126.8101.1107.4116.8
13129.4102.7109.4119.2
14131.9104.5111.4121.6
15134.6106.5113.5124.0
16137.3108.5115.7126.5
17140.0110.7118.0129.0
18142.8112.9120.4131.6
19145.7115.1122.8134.2
20148.6117.4125.2136.9

Métodos

  1. As ferramentas de governo Hood (1983), The Tools of Government, Macmillan
  2. Cenouras, porretes e sermões Bemelmans-Videc, Rist e Vedung (1998), Transaction
  3. Difusão de inovações Rogers (2003), Diffusion of Innovations, Free Press
  4. Leque de incerteza (Monte Carlo de parâmetros) Spiegelhalter, Pearson e Short (2011), Visualising uncertainty about the future, Science 333
  5. Sensibilidade de um fator de cada vez (tornado) Saltelli and others (2008), Global Sensitivity Analysis: The Primer, Wiley

Dados

The model runs on the teaching values set by the controls. To calibrate it for a place, read it against these admitted layers and series, which this page’s map can draw:

  • Fronteiras Natural Earth
  • Cidades Natural Earth
Comparar instrumentos: regras, incentivos e informação. Modelo didático ilustrativo: funciona com os valores definidos pelos controles, não com dados medidos. Métodos: As ferramentas de governo (Hood (1983), The Tools of Government, Macmillan); Cenouras, porretes e sermões (Bemelmans-Videc, Rist e Vedung (1998), Transaction); Difusão de inovações (Rogers (2003), Diffusion of Innovations, Free Press).

Nos seis pilares, sob a liderança do Nexus Consortium

08Decisões

Quem decide, e a que servem as evidências.

O Capital Nexus prepara evidências. As decisões abaixo são tomadas pelas autoridades nomeadas, segundo suas próprias regras, e nunca pela plataforma.

Quem decideA perguntaEvidências a que esta página serve
Finance ministries as ownersHow to set the mandate, apetite a risco and withdrawal rules, and how to separate them from day-to-day directionMandate texts, ownership policies and comparative governance practice
Boards of funds and state-owned enterprisesWhether governance, conflicts policy and disclosure meet the stated standardSelf-assessments, board composition and related-party disclosure
Parliaments and public accounts committeesWhether transfers and directed investment followed the rulesAudit opinions, transfer records and statutory rules
Instituições superiores de controleWhich vehicles and transactions to audit for compliance and performanceDisclosure gaps, related-party transactions and quasi-fiscal activity

Produtos que este tema gera

  • Role maps of owner, manager, board and auditor for each vehicle
  • Comparative briefs against the Santiago Principles and OECD guidelines
  • Conflict registers setting out stated and unstated objectives
  • Question sets for parliamentary and audit oversight
09Implementação

Do mandato à avaliação, por pilar.

As etapas que um instrumento percorre do mandato à avaliação, cada uma com o pilar que a executa e as decisões que permanecem com a autoridade. Modelo didático com valores ilustrativos declarados, não uma previsão. O mapa desta página mostra a América Latina e o Caribe; o modelo em si não está atrelado a um lugar.

  1. Mandato e enquadramento do problema Autoridade competente (fora do programa)
    Uma autoridade competente enquadra o problema e o mandato conforme suas próprias regras. Howlett, Ramesh e Perl (2009)
  2. Evidências e modelo do sistema Foundry
    O sistema é modelado com seus ciclos de retroalimentação, dados e limites declarados. OCDE (2014), princípio 2
  3. Opções avaliadas com cenários Foundry
    Os instrumentos são comparados em diferentes cenários, com a incerteza explicitada. Hood (1983)
  4. Exercício com as partes interessadas Universo
    As opções são testadas em um exercício com quem as implementaria e arcaria com elas. OCDE (2014), princípio 3
  5. Padrão ou orientação redigidos Nexus Standards
    O que funciona é codificado como padrão ou orientação, aberto a comentários. Processo dos Nexus Standards
  6. Decisão da autoridade Autoridade competente (fora do programa)
    A autoridade decide, fora do programa, com as evidências registradas. Howlett, Ramesh e Perl (2009)
  7. Capacidades e treinamento Risk Academy
    Quem implementa é treinado no instrumento decidido e em seus dados. Quadro de Sendai para a Redução do Risco de Desastres (2015), prioridade 2
  8. Monitoramento e relatório público Relatórios
    Os indicadores são publicados com suas fontes, limites e correções. OCDE (2014), princípio 5
  9. Avaliação e revisão Nexus Standards
    Os resultados retornam ao padrão e ao modelo: o ciclo se fecha. Howlett, Ramesh e Perl (2009)

Métodos

  1. Ciclo de políticas Howlett, Ramesh e Perl (2009), Studying Public Policy, Oxford University Press
  2. Governança de riscos críticos OCDE (2014), Recomendação do Conselho sobre a Governança de Riscos Críticos
  3. Desenho em camadas de grafos direcionados Sugiyama, Tagawa e Toda (1981), IEEE SMC 11
Do mandato à avaliação, por pilar: as etapas como registradas, cada uma com seu pilar; fontes citadas em cada etapa.

Nos seis pilares, sob a liderança do Nexus Consortium

10Questões centrais

O que os especialistas perguntam.

  1. 01

    Who is responsible for what?

    How duties are divided between owners, boards, managers and advisers.

  2. 02

    How are conflicts managed?

    How personal, political and commercial conflicts of interest are identified and controlled.

  3. 03

    Is oversight effective?

    Whether boards, auditors and legislatures have the information and independence to hold managers to account.

  4. 04

    How are long-term risks governed?

    Whether governance structures can address risks that unfold over decades.

11Simulador de gêmeo e cascata

Exercise a cascade in investment governance with the people who decide.

Assembled from the Nexus Standards area profile Financiamento do risco de desastres e climático: the hazards it names, the sistemas and communities that carry the loss, the controls and institutions that dampen it and the data that observe it. Pick an initiating event and step through the cascade to see where mandates meet and which decisions fall to whom. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise for dialogue, not a forecast, an assessment or a position. To model a place of your own choosing, open the full Construtor de sistemas.

Ameaças

  • Ciclone tropical
  • Terremoto
  • Inundação por congestionamento de gelo
  • Storm surge (desencadeado a jusante)
  • Chuvas intensas (desencadeadas a jusante)
  • Inundação fluvial (desencadeada a jusante)
  • Flash flood (set off downstream)
  • Arrebentação perigosa (desencadeada a jusante)
  • Apagão generalizado (desencadeado a jusante)
  • Deslocamento em massa (desencadeado a jusante)
  • Inundação costeira (desencadeada a jusante)
  • Aftershock sequence (set off downstream)
  • Fault surface rupture (set off downstream)
  • Soil liquefaction (set off downstream)
  • Slope slide (set off downstream)
  • Rockfall (set off downstream)
  • Tsunami (set off downstream)
  • Building collapse (set off downstream)

Controles

  • NS-0 Constituição e princípios
  • NS-3 UNIs de registros de risco (gramática, correspondência legada, autoridade de atribuição)
  • NS-9 UNIs contextuais (implantações, instâncias, instâncias de programa)
  • NS-10 Políticas e cláusulas (obrigações legíveis por máquina: definição, caráter vinculante, avaliação e execução)
  • NS-11 Verificação e monitoramento (evidências, atestações, observação da conformidade de confiança zero)
  • NS-14 Conformidade e correspondência com normas externas
  • NRS-F8 Transferência de risco paramétrica e baseada em índices
  • NRS-F7 Financiamento do risco de desastres e financiamento pré-acordado
  • NRS-H113 Família de ameaças: fragilidade do sistema financeiro (NHS-1 soc.financial-system)
  • NRS-H114 Família de ameaças: choques macroeconômicos e fiscais (NHS-1 soc.macro-fiscal)
  • NRS-D1 Desenvolvimento informado por riscos e triagem de projetos
  • NRS-H28 Família de ameaças: mudanças do estado climático (NHS-1 eco.climate-state)

Observação

  • Reanálise ERA5 (Copernicus Climate Data Store) (listada para referência)
  • CHIRPS quasi-global gridded precipitation (listed for reference)
  • USGS earthquake GeoJSON summary feeds (listed for reference)
  • Total do apoio internacional público às ações nacionais de redução do risco de desastres (indicador de Sendai F-1)
  • Perdas econômicas diretas atribuídas a desastres em relação ao PIB mundial

Geografia de exemplo

  • Europa Ocidental: 152 células hexagonais
  • Taxa de chuva, última meia hora (IMERG), NASA GIBS
  • Luzes noturnas desta noite, apagões (VIIRS Day/Night Band), NASA GIBS
  • Água superficial através das nuvens, 30 m (radar OPERA DSWx-S1), NASA GIBS
  • Umidade superficial do solo (SMAP), NASA GIBS
12Mecanismos

O que impulsiona a questão.

Principal-agent problems are central. Those who invest capital may have incentives that differ from those whose capital it is: short-term performance, fees, political goals or career interests.

Board competence and independence matter. Research on public and pension fund governance associates clearer mandates, competent and independent boards and transparent reporting with better outcomes.

Political interference is a specific risk for public capital. Directed investment, appointments and opaque decisions can divert capital from its mandate and damage trust.

Long horizons challenge governance. Risks such as mudança do clima unfold over periods longer than board terms and performance cycles, so structures must deliberately consider them.

Delegation chains lengthen accountability. When capital passes from owners to boards, managers, external managers and advisers, each link adds cost and distance, and governance must make the chain visible enough for oversight to work.

Why now: public investment programmes are being asked to account for climate and disaster risk, and project appraisal rules are being revised in several countries. Capital Nexus compares appraisal and oversight arrangements and records options for the institutions that hold investment decisions.

13Instrumentos e compromissos

How investment governance is governed: instruments, mandates and commitments.

Os instrumentos, mandatos, atores e arranjos de prestação de contas com que trabalha um formulador de políticas, um diplomata ou uma agência de desenvolvimento, com citação dos acordos que os estabelecem. As estruturas seguem os marcos nomeados. Qualquer estado ou progresso exibido é ilustrativo, não um registro.

Resultados de desenvolvimento

The Sustainable Development Goals and targets that outcomes on investment governance are reported against.

ObjetivoMetaComo este assunto se liga a outros
Objetivo 1, erradicação da pobrezaMeta 1.5, resiliência dos pobres e dos vulneráveisResultados reportados pelo indicador acordado da meta
Objetivo 17, parcerias para a implementação dos objetivosMeta 17.4, sustentabilidade da dívida a longo prazoResultados reportados pelo indicador acordado da meta
Objetivo 10, redução das desigualdadesMeta 10.5, regulação e monitoramento dos mercados financeirosResultados reportados pelo indicador acordado da meta
Objetivo 16, paz, justiça e instituições eficazesMeta 16.6, instituições eficazes, responsáveis e transparentesResultados reportados pelo indicador acordado da meta
Goals and targets of the 2030 Agenda, chosen from the page’s fields; indicators are reported by countries, not by the Forum.
Quadro de Sendai para a Redução do Risco de Desastres · UNDRRAcordo de Paris · UNFCCCAgenda 2030 e os Objetivos de Desenvolvimento Sustentável · Nações UnidasRegulamento Sanitário Internacional · OMS
14Métodos e limites

Como as evidências são reunidas e onde param.

Método ou dadosO que mostraSeu limite
Governance codes and reviewsStructures and practicesFormal structures may differ from practice
Comparative studiesLinks between governance and outcomesCausality is hard to establish
Disclosure reviewTransparency of decisionsDisclosure can be selective
Case analysisGovernance failures and responsesHindsight bias
15Métodos

Como é estudado e o que os métodos não podem dizer.

  1. Ciência das políticas, das instituições e da decisãoMapeamento de mandatos e direitos de decisão · Síntese de avaliações institucionaisAplicado aqui
  2. Economia financeira e macrofinançasSustentabilidade da dívida sob estresse · O ciclo de retroalimentação entre o soberano e os bancosAplicado aqui
  3. Economia e economia do desenvolvimentoAvaliação do investimento público · Incidência fiscal das escolhas de políticas · Custos indiretos dos choquesAplicado aqui
16Perguntas

Perguntas e respostas.

What are the Santiago Principles?
Generally accepted principles and practices for sovereign wealth funds, covering legal framework, objectives, governance, accountability and investment and risk management. Funds report against them voluntarily through the International Forum of Sovereign Wealth Funds.
What is quasi-fiscal activity?
Spending or support delivered through public institutions other than the budget, such as directed lending at below-market rates. It has fiscal cost even when it does not appear as budget expenditure.
Why separate owner and manager?
So that the mandate is set openly by an accountable authority, executed professionally, and changed only through a visible procedure rather than by instruction on individual transactions.
Does Capital Nexus advise funds on governance?
No. It convenes dialogue and publishes analysis. It gives no advice to any fund or institution.
Why does investment governance matter for risk?
Because poorly governed capital is more likely to be misallocated, exposed to hidden risks or diverted from its purpose.
How does GRF manage its own conflicts?
Through its governance and its rule that hosting or sponsorship confers no authority. See transparency, rights and safeguards.
RelatóriosContribuir

Contribua com evidências a partir desta página.

Relatórios is the Consortium’s quarterly publication. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work.

Global Risks ForumCapital NexusProntidão financeira e de segurosResumo de evidências
Capital Nexus

Leve uma questão de governança ao Fórum.

A informação e os pedidos estão abertos hoje. Um pedido recebe uma referência e indica o próximo passo; candidaturas, pagamentos, alocações de computação e registros só abrem quando existem a equipa, os termos e a capacidade de revisão.

The Global Risks Forum

Convening · leadership · urgency

Not for profit

Our articles, maps and twins are free to read and free to republish. Readers and partners keep it that way.

Partner with us

Who funds us

GRF is a not-for-profit institution. To ask who funds a piece of work, use the funding questions form.

Independence

Editors and the expert reviewers named on each article decide what we publish. Funders and partners do not review or approve articles before publication.

Licence

Articles: CC BY 4.0. Figures, maps, twins and data: CC BY 4.0. Other uses: ask through the permissions form.