Skip to content
Universe Annual programme Governed by GRF
پڕۆگرامی ساڵانەی کارکردن، ڕاهێنان و فێربوون

ساڵێک کار، پێکەوە تاقیکراوەتەوە.

Universe is the annual programme of the Nexus Consortium, governed by The Global Risks Forum (GRF). A year of national and regional work is built into a temporary technical environment in one month, tested in one week of controlled exercises, then stood down, reviewed and published.

Eleven months

Prepare: demand, evidence and qualification.

داواکاریی نیشتمانی، توێژینەوە، بەشداریی دامەزراوەیی، دەرچوونی مانگانەی گروپی کار، بەڵگەی چارەکی، و شیاوکردنی تەکنەلۆجیا و سەرچاوەکان. بە پۆرتفۆلیۆی ئەرکی پەسەندکراو و پلانی بنیاتنانی بەدەستهێنراو کۆتایی دێت.

یەک مانگ

Build: assemble and test the temporary edition Core.

Bind authorised resources, integrate software and data, test security and interoperability, train teams and rehearse. It ends with a Core Build Report, measured readiness, known defects and go or no-go decisions.

یەک هەفتە

Act and test: controlled exercises under stop-work authority.

Scenario work, benchmarks, independent observation, leadership deliberation and public-safe engagement. It ends with run, decision and observation records, limitations and improvement items.

یەک ڕۆژ، پلاندانراو

Stand down: seal the evidence and release the capacity.

Stop new work, checkpoint authorised jobs, revoke temporary access, release temporary capacity and seal transferable evidence. Review, reconciliation and corrections continue afterwards.

The year · select a stageDesign, not a schedule
The Universe yearA ring of one year: eleven months of preparation, one month to build, one week to act and test, and one day of planned stand-down, with the eight programme gates G0 to G7 placed around it. Selecting a stage highlights its arc. No edition is on record; the ring shows the design, not a schedule.

Fig. 01The Universe year, from preparation to stand-down. Design, not a schedule.

دەروازەکانی پڕۆگرام
8
G0 to G7, each with a recorded decision
Action week tracks
10
لە میتۆدەوە بۆ بەڵگەی گشتی
ناوچەکان
6
Contributing national and regional work
سیستەمەکانی Foundry
20
Where the year’s work persists
01چییە

پڕۆگرامێکی سەلماندن، نەک ڕووداوێک.

Institutions rarely test their arrangements before a real crisis does it for them. Universe gives them a governed, controlled setting to do it once a year, and a public record of what held and what broke.

It is
  • Missions admitted from national and regional programmes
  • A temporary technical backbone, edition Core, built for each edition
  • ڕاهێنانی کۆنترۆڵکراو بە هەڵسەنگاندنی سەربەخۆ
  • Leadership deliberation on what the tests reveal
  • Reviewed findings, failures and corrections
It is not
  • Not a trade show or a procurement fair
  • Not a funding platform or an investment forum
  • Not a permanent supercomputer: edition Core is temporary
  • Not an emergency service or incident command
  • Not a schedule of confirmed dates or hosts until an edition record exists

Hosting is not ownership. Sponsorship is not authority. A listed mission is not a success, and a simulated loss is not an observed impact.

02ساڵەکە، وێستگە بە وێستگە

From the first gate to the published record.

Each station has an entry condition and an exit record; work moves on only when the record shows it is ready. GRF records every gate decision within its instruments, and a gate not passed stops the work it governs.

  1. Gate G0 to G2 · the preparation year

    Missions are proposed, qualified and admitted.

    Missions come from national and regional programmes, which keep their own agenda authority and may decline participation or data sharing at any point. A mission is admitted at gate G1 against recorded criteria, with the reasons kept on record. Neither membership nor sponsorship secures admission or a computing allocation.

    Mission board · an edition pipelineIllustrative · no edition on record
    Mission board, example screenAn illustrative mission pipeline for a Universe edition: proposed, qualified, admitted, built, tested and published columns with mission cards from six regions, the build column current at gate G3 and the published column still empty. Names are examples; no edition is on record.

    Fig. 02Missions from proposal to publication. Mission names are examples.

    گرنگیداواکاریی نیشتمانیپشتبەستنی نێوان سیستەمەکانبۆشایی بەڵگەچارەسەرپێکراویبەهای تواناپاراستنەکانشیانی سەرچاوەوەرگرێکی شیاو
  2. Gate G3 · the build month

    ئێسکەبەندییەک بۆ یەک وەشان دروست کراوە، پاشان هەڵوەشێنراوەتەوە.

    edition Core is the temporary technical environment of an edition: contributed computing, networks and data bound together for one month, tested for security and interoperability, and released in a planned stand-down. It is not a permanent supercomputer and never a service.

    edition Core build · week three of fourIllustrative
    بنیاتنانی ناوەکیی وەشان، شاشەی نموونەAn illustrative Core build console: contributed capacity moving through offered, qualified, reserved, allocated, accessible, measured and accepted states, a temporary backbone topology with compute, network, data, identity and observability nodes, readiness meters and a build report with open defects and a pending go or no-go decision. Values are examples.

    Fig. 03The month an edition’s technical environment is built and checked. Illustrative values.

    Seven states of contributed capacity

    An infrastructure offer is not an allocation. Each state is recorded separately, and none implies the next.

    1. پێشکەشکراو

    2. شارەزا

    3. پارێزراو

    4. تەرخانکراو

    5. دەستگەیشتوو

    6. پێوانەکراو

    7. وەرگیراو

  3. Gate G4 · the action week

    Ten tracks, run under exercise controls.

    The action week brings every part of the year’s work into one controlled setting, from scientific methods to leadership deliberation and public challenge. Independent evaluators test objectives and observable performance, not attendance. Simulated warnings never reach live audiences, and real infrastructure is never an unapproved target.

    Exercise control · day four, cross-systemIllustrative
    Exercise control, example screenAn illustrative exercise control room for the action week: a scenario events list with timed injects, a safety panel with stop-work authority, a safety hold, a real-world override and sealed live audiences, an evaluation grid of objectives against observed performance by day, and an after-action record counting observations, preserved dissent, adverse findings and improvement items. Values are examples.

    وێنەی 04هەفتەی کردار، بە کۆنترۆڵی سەلامەتی و هەڵسەنگاندنەکەیەوە. بەهای نموونەیی.

    The ten tracks

    1. 01Scientific methods and dataEvidence
    2. 02National compute and network integrationCore
    3. 03Sector and country missionsMissions
    4. 04هەڵسەنگاندنی تەکنەلۆجیای پێشەنگهەڵسەنگاندن
    5. 05Public-authority learningLearning
    6. 06Leadership and policy deliberationCouncils
    7. 07ئامادەیی دارایی و بیمەGRA
    8. 08Academy and workforceLearning
    9. 09Rights, safeguards and integrityTrust
    10. 10Public evidence and challengePublic
  4. Gate G5 to G7 · stand-down, publication, renewal

    Evidence sealed, results reviewed, the next mandate set.

    دەستگەیشتن و توانای کاتی لە کۆتایی هێنانێکی پلاندانراودا دەدرێنەوە، کە تەنیا کاتێک دەبێتە پابەندبوونی پڕۆگرام کە پڕۆگرامی ساڵانە مەبەست، کات، بواری کار و جیاوازییەکانی تۆمار بکات. بەڵگەی هەڵگیراو دەپارێزرێت. پێداچوونەوەی زانستی و ئەدیتۆریال، ڕێکخستنەوەی دارایی و ڕاستکردنەوەکان دواتر بەردەوام دەبن، و بابەتەکانی باشترکردن دەگەڕێنەوە بۆ ڕۆژەڤی ساڵانەی داهاتوو.

    1. G0Annual programme authorised
    2. G1Missions admitted
    3. G2داتا و سەرچاوە شیاوکراون
    4. G3بنیاتنان بۆ ڕاهێنان وەرگیرا
    5. G4Controlled live operation authorised
    6. G5Evidence sealed, stand-down recorded
    7. G6بڵاوکردنەوە ڕێپێدراوە
    8. G7Renewal reviewed

    No edition is on record, so no gate above has been passed. Each gate is a decision GRF records within its instruments.

03کێ چی دەکات

GRF governs. GCRI runs the technical office. GRA reads it for finance.

The Global Centre for Risk and Innovation (GCRI) is the Lead Institution of the Nexus Consortium; GRF and the Global Risks Alliance (GRA) are independent consortium stewards with it. None of them takes the decisions that belong to the governments, operators and licensed institutions taking part. Hosts provide venues and support under written safeguards.

Council agenda · the governance viewIllustrative
ڕۆژەڤی ئەنجومەن و وەشان، شاشەی نموونەکۆنسۆڵێکی نموونەیی GRF: بەشداریی ئەنجومەن لە شەش هەڵبژێرەردا، پڕۆگرامی ساڵانە لە دیالۆگ و هەڵبژاردنی ئەرکەوە تا بنیاتنانی ناوەکی، هەفتەی تاقیکردنەوە، کۆتاییپێهێنانی پلاندانراو و پوختەکردن، تۆماری دیالۆگێک لە ڕۆژەڤی پەسەندکراوەوە تا ڕاستکردنەوە کراوەکان، و سێ کۆڵەکەی بەشداریکردن.

Fig. 05Where GRF records the decisions of an edition. Wireframe, not a live screen.

GRF

حوکمڕانیی پڕۆگرام

The annual mandate, mission admission, gate decisions and publication authorisation, with leadership dialogue throughout the year. GRF tests inclusion, institutional fit and public-purpose legitimacy.

GCRI

ئۆفیسی تەکنیکی

Mission scoping, data and method qualification, the Core build, exercise control and evidence capture. See GCRI’s programmes.

GRA

Finance-readiness dialogues

The finance and insurance readiness track: protection gaps and diligence questions, never an approval or a transaction. See finance readiness at GRA.

شەش کۆڵەکە

چۆن ئەمە لە ناو شەش کۆڵەکەکەدا کار دەکات.

GRF works through six pillars of one annual programme, led by the Nexus Consortium, with GCRI, GRF and GRA each contributing in its role: explore, experiment and prototype in Labs, build, simulate and prepare in Foundry, convene and test in Universe, codify, correct and apply in Nexus Standards, publish in every format in Reports, teach in the open in Risk Academy.

کۆڵەکەکان هەڵبژێرە · بەسەر هێڵەکاندا ڕابوەستە16 / 18 ڕادەستکردنەوە

ڕێڕەو

دەوروبەری Universe

ئەو کۆڵەکانەی Universe کار بۆیان دەنێرێت و لێیانەوە وەری دەگرێت.

L · F · U · S · R · A

کۆڵەکەکان
5 لە 6
دەستبەدەستکردنەکان
16 لە 18
خولەکان
16 داخراو

دەستبەدەستکردنی لە کاردا

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review

و 12 دانەی دیکە

F01 تا F14 دەستبەدەستکردنە تۆمارکراوەکانی ساڵی پڕۆگرامن، هەر یەکە لەگەڵ ئارتیفاکتی جووڵاو و قۆناغەکەی؛ R1، R2، R3 و R4 کار بە دەوری ئەنگوستیلەکەدا دەگێڕن. خولێک دەژمێردرێت کاتێک هەموو کۆڵەکەیەکی سەری هەڵبژێردرابێت. هەر کۆڵەکەیەک بە سەرپەرشتیی Nexus Consortium ە.
  1. LabsWhere questions become experiments and prototypes: new methods, data and tools are tried in the open, with their limits on record, before the Foundry builds them, under the Nexus Consortium.Labs
  2. FoundryWhere the evidence behind a mandate or commitment is built, with its owner and limits on record.Foundry at GRF: BuildFoundry
  3. UniverseWhere mandates become missions: GRF records each gate, convenes the parties and keeps implementation accountable.Universe at GRF: Universe at GRFuniverse.nexus
  4. Nexus StandardsWhere shared rules are agreed in the open; each jurisdiction decides adoption, and no global body holds a veto.Nexus Standards
  5. ReportsWhere governance analysis and the year’s results are published, so commitments can be followed and checked.Reports at GRF: PublishReports
  6. Risk AcademyWhere policymakers, diplomats and agency staff learn the programme roles and decision-making on the record, on Risk Academy.Risk Academy

ئەوەی هەر دامەزراوەیەک بۆ هەر کۆڵەکەیەک دەیهێنێت

کۆڵەکەGCRIGRFGRA
Labsتاقیکردنەوەکان ڕا دەکات: تیمە زانستی و تەکنەلۆجییەکانی نموونەی سەرەتایی دیزاین دەکەن، میتۆد تۆمار دەکەن و ئەوەی شکستی هێنا و ئەوەی سەرکەوت بڵاو دەکەنەوە.ئەو پرسیارانە دەهێنێت کە سیاسەت و حوکمڕانی پێویستیان بە وەڵامە، و تاقیکردنەوەیەک لە دەروازەیەکی تۆمارکراودا دەخاتە ناو پڕۆگرامەکە.پرسیاری دارایی دەهێنێت بۆ تاقیکردنەوە، تاکو نموونەی سەرەتایی لەسەر بەڵگەیەک بتاقیبکرێتەوە کە دەزگا داراییەکان بتوانن بیخوێننەوە.
Foundryپلاتفۆرمە زانستی و تەکنیکییەکانی میتۆد، داتا و بەڵگە دەهێنن کە Foundry لەسەریان بنیات دەنرێت.ئەرکەکان وەردەگرێت و دروستکراو بۆ ڕاهێنان لە دەروازەیەکی تۆمارکراودا قبوڵ دەکات، بۆ ئەوەی کاری Foundry بە تۆمارەوە بچێتە ناو پڕۆگرامەکە.پرسیارەکانی ئامادەیی دارایی دەهێنێت، تاکو دروستکراوەکان بەڵگەیەک بەرهەم بهێنن کە دەزگا داراییەکان بتوانن بیخوێننەوە.
Universeدەفتەری تەکنیکیی ئامادەیی زانستی و داتای هەر ئەرکێک ئامادە دەکات.پارێزگاریی پڕۆگرامەکە دەکات و بەڕێوەی دەبات: ئەرکەکە، دەروازەکانی G0 بۆ G7، کۆکردنەوە و Action Week.دیالۆگی ئامادەیی دارایی ڕێک دەخات لەبارەی ئەوەی هەر ئەرکێک چی بۆ دارایی و بیمە دەگەیەنێت.
ستانداردGCRI Canada بڵاوکەرەوە و سکرتاریەتی تۆمارە؛ GCRI پارێزگاری لە بەڵگە، میتۆد، داتا و توێژینەوەی کراوەی پشت ستانداردەکان دەکات.بەشداری کۆدەکاتەوە و تۆماری گشتیی ناسین و پێگە ڕادەگرێت.ستانداردەکان بۆ دارایی و بیمە خوێنراو دەکات.
ڕاپۆرتەکانسایتی کانۆنیی Reports ڕاگری دەکات و بەڵگە لەبارەی وڵاتان، کەرتەکان و میتۆدەکان بڵاو دەکاتەوە.Publishes governance analysis and authorises publication of the year’s results at gate G6.شیکاریی کەرتەکان و زنجیرەی ئامادەیی دارایی و بیمە بڵاو دەکاتەوە.
ئەکادیمیاخولی فێرکاری لەسەر میتۆد، داتا و سیستەمەFoundry دادەڕێژێت، لە Risk Academy میوانداری دەکرێت.خولی حوکمڕانی، سیاسەت و ڕۆڵی پڕۆگرام دەنووسێت، لە Risk Academy دا ڕاگیراوە.خولی دارایی، بیمە و ئامادەیی دەنووسێت، لە Risk Academy دا ڕاگیراوە.

کۆڵەکەکان لە ماوەی ساڵی پڕۆگرامدا

کۆڵەکەQ1 · دۆخ و ئەجێنداQ2 · بەڵگە و دروستکردنQ3 · تاقیکردنەوەی فشار و ئامادەییQ4 · پوختەی ساڵانە و نوێکردنەوە
LabsOpens the year’s experiments on the questions the mandate namesنموونەی سەرەتایی لە خولی کورتدا ڕا دەکات؛ ئەوانەی دووبارەکراوەن دەیدات بە Foundryلەگەڵ Action Week دا بیرۆکەکان تاقی دەکاتەوە؛ ئەوەی شکستی هێنا و بۆچی تۆمار دەکاتWrites up every experiment; proposes next year’s questions
Foundryپڕۆژەکانی خول دەکاتەوە؛ بنەڕەتی پۆرتفۆلیۆی نیشتمانیسەرچاوەکان شیاو دەکات؛ دروستکردنی کۆنترۆڵکراوی یەک مانگلە Action Week دا شبیهسازی دەکات؛ توانای کاتی ئازاد دەکاتکۆمەڵە داتا دابین دەکات؛ بۆشایی توانا تۆمار دەکات
Universeئەرکی ساڵانە (G0)ئەرکەکان وەرگیران (G1)، شیاو کران (G2)، دروستکراو قبوڵ کرا (G3)Action Week (G4)، کشانەوە، بەڵگە مۆر کراوە (G5)بڵاوکردنەوە مۆڵەت دراوە (G6)، نوێکردنەوە (G7)
ستانداردئەرکەکان بۆ ستانداردەکان ڕێنیشان دەکاتپرۆفایلەکان پێکدەهێنێت؛ دروستکراو پشتڕاست دەکاتەوەپابەندبوون چاودێری دەکات؛ دۆزینەوەکان دەبنە پێشنیارپێداچوونەوەی ئەنجومەن؛ گۆڕانکارییە پەسەندکراوەکان بڵاو دەکرێنەوە
ڕاپۆرتەکانوەشانی دۆخ و ئەجێنداوەشانی بەڵگە و دروستکردنStress Test and Readiness editionپوختەی ساڵانە، ئاڵای سەرەکی
ئەکادیمیاڕێڕەوەکان کراونەتەوە؛ گروپەکان تۆمار دەکرێنخولی شیاوکردن؛ فێربوون لەسەر دروستکردنهەڵسەنگاندنی ڕاهێنان؛ تۆماری تەواوبوونپێداچوونەوەی خول؛ گروپی داهاتوو کراونەتەوە
04How to take part

Roles for every kind of contributor.

پڕۆگرامەکان

پڕۆگرامی نیشتمانی و هەرێمی

Propose a mission once an edition is authorised.

ژێرخان

بەشداربووانی کۆمپیوتەر و تۆڕ

Offer qualified resources; offered capacity is never counted as allocated.

میواندارەکان

میوان و شوێنەکان

Propose hosting; no event is confirmed before host authority and readiness are evidenced.

هەڵسەنگاندن

هەڵسەنگێنەران و پێداچوونەوەکاران

Observe and evaluate; a reviewer with a declared conflict never signs the acceptance concerned.

People

سەرکردە و شارەزایان

Contribute through the Leadership Council and working groups on Participate.

گشتی

خوێنەر و ڕەخنەگران

ئەنجامە بڵاوکراوەکان بخوێنەرەوە و لە ڕێگەی حوکمڕانی و متمانە.

No edition is on record yet. Enquiries are open and receive a reference. Mission calls, hosting decisions and registration open only when an edition is authorised and its terms and review capacity are in place. Governance questions go to the contact form, hosting proposals to the partnership form.

05پرسیارەکان

پرسیار دەربارەی Universe.

When and where is the next Universe?
No edition is on record yet. Dates, hosts and locations are published only with an edition record, after the host’s authority and readiness are evidenced. Until then, any date you see elsewhere is not confirmed by GRF.
What is the Universe website address?
Universe has its own website at universe.nexus. This gateway on globalriskforum.com explains how GRF governs the programme. Treat any other address presented as the programme’s website as not confirmed by GRF.
ئایا لە دوای هەفتەی کردار هەموو شتێک هەڵدەوەشێتەوە؟
Temporary access and capacity are released in a planned stand-down, which becomes a programme commitment only when the annual programme records it. Retained evidence is preserved, and scientific review, financial reconciliation and corrections continue afterwards.
Does sponsorship or membership secure a mission place?
No. Missions are admitted at gate G1 against the criteria set out on this page. Neither membership nor sponsorship secures admission or a computing allocation.
Are exercise results binding findings?
No. Exercise results are evidence with stated limits. Simulated loss or performance is not observed impact, and results are published only after review. Decisions based on them remain with competent authorities.
How is GCRI involved?
GCRI, the Lead Institution of the Nexus Consortium, provides the technical office: mission scoping, data and method qualification, the Core build, exercise control and evidence capture. GRF governs the programme, and GRA leads the finance-readiness track.
ڕاپۆرتەکانبەشداربە

لەم لاپەڕەیەوە بەڵگە پێشکەش بکە.

Reports بڵاوکراوەی وەرزیی کۆنسۆرتیۆم ـە. ئەوەی تۆ لەسەر ئەم بابەتە دەیزانیت دەتوانێت لە وەشانی داهاتوودا ببێتە بەڵگە، کەیس یان ڕاستکردنەوە، بە ناوی خۆتەوە و لەژێر CC BY 4.0 بڵاو دەکرێتەوە کاتێک کاری خۆتە.

Global Risks Forum
سکرتاریەتی کۆنسۆرتیۆم

Prepare a mission worth testing.

The Secretariat answers Universe enquiries and names the next step. An enquiry receives a reference; it does not create a mission place, an allocation or a registration.