Skip to content
Universe Annual programme Governed by GRF
Bernameya salane ya xebitandin, pratîk û hînbûnê

Salek xebat, bi hev re hatiye ceribandin.

Universe is the annual programme of the Nexus Consortium, governed by The Global Risks Forum (GRF). A year of national and regional work is built into a temporary technical environment in one month, tested in one week of controlled exercises, then stood down, reviewed and published.

Eleven months

Prepare: demand, evidence and qualification.

National demand, research, institutional participation, monthly working-group delivery, quarterly evidence, and the qualification of technology and resources. It ends with an approved mission portfolio and an achievable build plan.

Mehek

Build: assemble and test the temporary edition Core.

Bind authorised resources, integrate software and data, test security and interoperability, train teams and rehearse. It ends with a Core Build Report, measured readiness, known defects and go or no-go decisions.

Hefteyek

Act and test: controlled exercises under stop-work authority.

Scenario work, benchmarks, independent observation, leadership deliberation and public-safe engagement. It ends with run, decision and observation records, limitations and improvement items.

Rojek, plankirî

Stand down: seal the evidence and release the capacity.

Stop new work, checkpoint authorised jobs, revoke temporary access, release temporary capacity and seal transferable evidence. Review, reconciliation and corrections continue afterwards.

The year · select a stageDesign, not a schedule
The Universe yearA ring of one year: eleven months of preparation, one month to build, one week to act and test, and one day of planned stand-down, with the eight programme gates G0 to G7 placed around it. Selecting a stage highlights its arc. No edition is on record; the ring shows the design, not a schedule.

Fig. 01The Universe year, from preparation to stand-down. Design, not a schedule.

Deriyên bernameyê
8
G0 to G7, each with a recorded decision
Action week tracks
10
Ji rêbazan heta delîlên giştî
Herêm
6
Contributing national and regional work
Pergalên Foundry
20
Where the year’s work persists
01Çi ye

A proving programme, not an event.

Institutions rarely test their arrangements before a real crisis does it for them. Universe gives them a governed, controlled setting to do it once a year, and a public record of what held and what broke.

It is
  • Missions admitted from national and regional programmes
  • A temporary technical backbone, edition Core, built for each edition
  • Pratîkên kontrolkirî bi nirxandina serbixwe
  • Leadership deliberation on what the tests reveal
  • Reviewed findings, failures and corrections
It is not
  • Not a trade show or a procurement fair
  • Not a funding platform or an investment forum
  • Not a permanent supercomputer: edition Core is temporary
  • Not an emergency service or incident command
  • Not a schedule of confirmed dates or hosts until an edition record exists

Hosting is not ownership. Sponsorship is not authority. A listed mission is not a success, and a simulated loss is not an observed impact.

02Sal, qonax bi qonax

From the first gate to the published record.

Each station has an entry condition and an exit record; work moves on only when the record shows it is ready. GRF records every gate decision within its instruments, and a gate not passed stops the work it governs.

  1. Gate G0 to G2 · the preparation year

    Missions are proposed, qualified and admitted.

    Missions come from national and regional programmes, which keep their own agenda authority and may decline participation or data sharing at any point. A mission is admitted at gate G1 against recorded criteria, with the reasons kept on record. Neither membership nor sponsorship secures admission or a computing allocation.

    Mission board · an edition pipelineIllustrative · no edition on record
    Mission board, example screenAn illustrative mission pipeline for a Universe edition: proposed, qualified, admitted, built, tested and published columns with mission cards from six regions, the build column current at gate G3 and the published column still empty. Names are examples; no edition is on record.

    Fig. 02Missions from proposal to publication. Mission names are examples.

    GirîngîDaxwaza neteweyîGirêdayîbûna di navbera pergalan deValahiya delîlanGengaziya çareserkirinêNirxa kapasîteyêParastinGengaziya çavkaniyêWergirê jêhatî
  2. Gate G3 · the build month

    Bingehek ji bo yek çapê hatiye avakirin, paşê hatiye rawestandin.

    edition Core is the temporary technical environment of an edition: contributed computing, networks and data bound together for one month, tested for security and interoperability, and released in a planned stand-down. It is not a permanent supercomputer and never a service.

    edition Core build · week three of fourIllustrative
    ekrana mînak a avakirina Bingehîn a çapêAn illustrative Core build console: contributed capacity moving through offered, qualified, reserved, allocated, accessible, measured and accepted states, a temporary backbone topology with compute, network, data, identity and observability nodes, readiness meters and a build report with open defects and a pending go or no-go decision. Values are examples.

    Fig. 03The month an edition’s technical environment is built and checked. Illustrative values.

    Seven states of contributed capacity

    An infrastructure offer is not an allocation. Each state is recorded separately, and none implies the next.

    1. Pêşkêşkirî

    2. Jêhatî

    3. Veqetandî

    4. Veqetandî

    5. Gihîştbar

    6. Pîvandî

    7. Hatiye pejirandin

  3. Gate G4 · the action week

    Ten tracks, run under exercise controls.

    The action week brings every part of the year’s work into one controlled setting, from scientific methods to leadership deliberation and public challenge. Independent evaluators test objectives and observable performance, not attendance. Simulated warnings never reach live audiences, and real infrastructure is never an unapproved target.

    Exercise control · day four, cross-systemIllustrative
    Exercise control, example screenAn illustrative exercise control room for the action week: a scenario events list with timed injects, a safety panel with stop-work authority, a safety hold, a real-world override and sealed live audiences, an evaluation grid of objectives against observed performance by day, and an after-action record counting observations, preserved dissent, adverse findings and improvement items. Values are examples.

    Wêne 04Hefteya çalakiyê, bi kontrolên ewlehiyê û nirxandinê. Nirxên nimûneyî.

    The ten tracks

    1. 01Scientific methods and dataEvidence
    2. 02National compute and network integrationCore
    3. 03Sector and country missionsMissions
    4. 04Nirxandina teknolojiyên sînorNirxandin
    5. 05Public-authority learningLearning
    6. 06Leadership and policy deliberationCouncils
    7. 07Amadebûna darayî û sîgortayêGRA
    8. 08Academy and workforceLearning
    9. 09Rights, safeguards and integrityTrust
    10. 10Public evidence and challengePublic
  4. Gate G5 to G7 · stand-down, publication, renewal

    Evidence sealed, results reviewed, the next mandate set.

    Temporary access and capacity are released in a planned stand-down, which becomes a programme commitment only when the annual programme records its purpose, clock, scope and exceptions. Retained evidence is preserved. Scientific and editorial review, financial reconciliation and corrections continue afterwards, and improvement items return to the next annual agenda.

    1. G0Annual programme authorised
    2. G1Missions admitted
    3. G2Dane û çavkanî hatine pejirandin
    4. G3Avakirin ji bo pratîkê hatiye pejirandin
    5. G4Controlled live operation authorised
    6. G5Evidence sealed, stand-down recorded
    7. G6Weşan hatiye destûrdan
    8. G7Renewal reviewed

    No edition is on record, so no gate above has been passed. Each gate is a decision GRF records within its instruments.

03Kî çi dike

GRF governs. GCRI runs the technical office. GRA reads it for finance.

The Global Centre for Risk and Innovation (GCRI) is the Lead Institution of the Nexus Consortium; GRF and the Global Risks Alliance (GRA) are independent consortium stewards with it. None of them takes the decisions that belong to the governments, operators and licensed institutions taking part. Hosts provide venues and support under written safeguards.

Council agenda · the governance viewIllustrative
Rojeva encumen û çapê, dîmena nimûneKonsoleke nimûneyî ya GRF: beşdariya encumenan di şeş hilbijêran de, bernameya salane ji diyalog û hilbijartina mîsyonê heta avakirina Bingehîn, hefteya ceribandinê, rawestandineke plankirî û senteza, tomara diyalogê ji rojeva pejirandî heta rastkirinên vekirî, û sê stûnên beşdariyê.

Fig. 05Where GRF records the decisions of an edition. Wireframe, not a live screen.

GRF

Rêveberiya bernameyê

The annual mandate, mission admission, gate decisions and publication authorisation, with leadership dialogue throughout the year. GRF tests inclusion, institutional fit and public-purpose legitimacy.

GCRI

Ofîsa teknîkî

Mission scoping, data and method qualification, the Core build, exercise control and evidence capture. See GCRI’s programmes.

GRA

Finance-readiness dialogues

The finance and insurance readiness track: protection gaps and diligence questions, never an approval or a transaction. See finance readiness at GRA.

Şeş stûn

Ev di nav şeş stûnan de çawa dixebite.

GRF works through six pillars of one annual programme, led by the Nexus Consortium, with GCRI, GRF and GRA each contributing in its role: explore, experiment and prototype in Labs, build, simulate and prepare in Foundry, convene and test in Universe, codify, correct and apply in Nexus Standards, publish in every format in Reports, teach in the open in Risk Academy.

Stûnan hilbijêre · li xetan bigere16 / 18 teslîmkirin

Rê

Li dora Universe

Stûnên ku Universe kar ji wan re dişîne û ji wan werdigire.

L · F · U · S · R · A

Stûn
5 ji 6
Radestkirin
16 ji 18
Çerx
16 girtî

Radestkirinên di xebatê de

  • F01Universe → Foundry · Admitted mission becomes a cycle project with a decision caseReadiness preparation
  • F02Foundry → Universe · Core Build Report and go or no-go evidenceControlled build
  • F03Foundry → Reports · Sealed observations and indicator series behind a profileCloseout
  • F04Universe → Reports · After-action and scenario findings for chapters 10 and 13After-action review

û 12 yên din

F01 heta F14 radestkirinên tomarkirî yên salê bernameyê ne, her yek bi hunera ku diguhere û qonaxa wê; R1, R2, R3 û R4 kar li dora xelekê digerînin. Xelek tê jimartin dema ku her stûnek li ser wê were hilbijartin. Her stûn ji hêla Nexus Consortium ve tê birêvebirin.
  1. LabsWhere questions become experiments and prototypes: new methods, data and tools are tried in the open, with their limits on record, before the Foundry builds them, under the Nexus Consortium.Labs
  2. FoundryWhere the evidence behind a mandate or commitment is built, with its owner and limits on record.Foundry at GRF: BuildFoundry
  3. UniverseWhere mandates become missions: GRF records each gate, convenes the parties and keeps implementation accountable.Universe at GRF: Universe at GRFuniverse.nexus
  4. Nexus StandardsWhere shared rules are agreed in the open; each jurisdiction decides adoption, and no global body holds a veto.Nexus Standards
  5. ReportsWhere governance analysis and the year’s results are published, so commitments can be followed and checked.Reports at GRF: PublishReports
  6. Risk AcademyWhere policymakers, diplomats and agency staff learn the programme roles and decision-making on the record, on Risk Academy.Risk Academy

Ya ku her sazî ji bo her stûnê tîne

StûnGCRIGRFGRA
LabsCeribandinan dimeşîne: tîmên wê yên zanist û teknolojiyê prototîpan sêwirînin, rêbazê tomar dikin û ya têk çû jî weke ya serkeftî diweşînin.Pirsên ku siyaset û rêveberî pêdivî bi bersivê dibînin tîne, û ceribandinekê di derîyekî tomarkirî de dixe bernameyê.Pirsên fînansî tîne ji bo ceribandinê, da ku prototîp li ser delîlên ku sazîyên fînansî dikarin bixwînin were ceribandin.
FoundryPlatformên wê yên zanistî û teknîkî rêbaz, dane û delîlên ku Foundry li ser ava dike tînin.Mîsyonan qebûl dike û avakirinê ji bo pratîkê di derîyekî tomarkirî de dipejirîne, da ku xebata Foundry li ser tomarê bikeve bernameyê.Pirsên amadebûna fînansî tîne, da ku avakirin delîlên ku sazîyên fînansî dikarin bixwînin hilberînin.
UniverseOfîsa wê ya teknîkî amadebûna zanistî û daneyê ya her mîsyonê amade dike.Bername birêve dibe û rêve dibe: mandat, deriyên G0 heta G7, civandin û Hefteya Çalakiyê.Diyalogên amadebûna fînansî dimeşîne li ser wateya her mîsyonê ji bo fînans û sîgortayê.
StandardsGCRI Canada weşangera tomarkirî û sekreterya ye; GCRI delîl, rêbaz, dane û lêkolîna vekirî ya li pişt standardan diparêze.Beşdariyê dicivîne û tomara giştî ya naskirin û rewşê diparêze.Standardan ji fînans û sîgortayê re dixwînbar dike.
rêzeya Pergalên StratejîkMalpera kanonîk a Reports dihewîne û delîlan li ser welat, sektor û rêbazan diweşîne.Publishes governance analysis and authorises publication of the year’s results at gate G6.Analîza sektorê û rêzeya amadebûna fînans û sîgortayê diweşîne.
AkademîKursan li ser rêbaz, dane û pergalênFoundry dinivîse, li Risk Academy têne mêvandarkirin.Kursan li ser rêveberî, siyaset û rolên bernameyê dinivîse, li Risk Academy têne mêvandarkirin.Kursan li ser fînans, sîgorta û amadebûnê dinivîse, li Risk Academy têne mêvandarkirin.

Stûn di salê bernameyê de

StûnQ1 · Rewş û ajandaQ2 · Delîl û avakirinQ3 · Stress Test û AmadebûnQ4 · Senteza salane û nûkirin
LabsOpens the year’s experiments on the questions the mandate namesPrototîpan di çerxên kurt de dimeşîne; yên dubarekirî dide FoundryRamanan li kêleka Hefteya Çalakiyê diceribîne; tomar dike ka çi têk çû û çimaWrites up every experiment; proposes next year’s questions
FoundryProjeyên çerxê vedike; xeta bingehîn a Portfolyoya NeteweyîÇavkaniyan dipejirîne; avakirineke kontrolkirî ya mehekêDi Hefteya Çalakiyê de simulasyonan dimeşîne; kapasîteya demkî berdidePakêtên daneyê peyda dike; valahiyên kapasîteyê tomar dike
UniverseMandata salane (G0)Mîsyon hatin pejirandin (G1), hatin pejirandin ku têkildar in (G2), avakirin hat qebûlkirin (G3)Hefteya Çalakiyê (G4), rawestandin, delîl hatine mohrkirin (G5)Weşan hat destûrdan (G6), nûkirin (G7)
StandardsMîsyonan ber bi standardan ve dibeProfîlan pêk tîne; avakirinê rast dikeLihevhatinê çavdêrî dike; encam dibin pêşniyarNirxandina Encumenê; guhertinên hatine pejirandin têne weşandin
rêzeya Pergalên StratejîkÇapa Rewş û AjandayêÇapa Delîl û AvakirinêStress Test and Readiness editionSenteza Salane, ala sereke
AkademîRê vekirî ne; komên nû tomar dibinKursên jêhatîbûnê; fêrbûn li ser avakirinêNirxandinên pratîkê; tomarên temamkirinêGuhertinên kursan; koma pêş vekirî ye
04How to take part

Roles for every kind of contributor.

Bername

Bernameyên neteweyî û herêmî

Propose a mission once an edition is authorised.

Binesazî

Computing and network contributors

Offer qualified resources; offered capacity is never counted as allocated.

Mêvandar

Mêvandar û cih

Propose hosting; no event is confirmed before host authority and readiness are evidenced.

Nirxandin

Nirxandin û nirxandêr

Observe and evaluate; a reviewer with a declared conflict never signs the acceptance concerned.

People

Leaders and experts

Contribute through the Leadership Council and working groups on Participate.

Giştî

Readers and critics

Encamên weşandî bixwînin û bi riya Rêveberî û bawerî.

No edition is on record yet. Enquiries are open and receive a reference. Mission calls, hosting decisions and registration open only when an edition is authorised and its terms and review capacity are in place. Governance questions go to the contact form, hosting proposals to the partnership form.

05Pirs

Questions about Universe.

When and where is the next Universe?
No edition is on record yet. Dates, hosts and locations are published only with an edition record, after the host’s authority and readiness are evidenced. Until then, any date you see elsewhere is not confirmed by GRF.
What is the Universe website address?
Universe has its own website at universe.nexus. This gateway on globalriskforum.com explains how GRF governs the programme. Treat any other address presented as the programme’s website as not confirmed by GRF.
Is everything torn down after the action week?
Temporary access and capacity are released in a planned stand-down, which becomes a programme commitment only when the annual programme records it. Retained evidence is preserved, and scientific review, financial reconciliation and corrections continue afterwards.
Does sponsorship or membership secure a mission place?
No. Missions are admitted at gate G1 against the criteria set out on this page. Neither membership nor sponsorship secures admission or a computing allocation.
Are exercise results binding findings?
No. Exercise results are evidence with stated limits. Simulated loss or performance is not observed impact, and results are published only after review. Decisions based on them remain with competent authorities.
How is GCRI involved?
GCRI, the Lead Institution of the Nexus Consortium, provides the technical office: mission scoping, data and method qualification, the Core build, exercise control and evidence capture. GRF governs the programme, and GRA leads the finance-readiness track.
rêzeya Pergalên StratejîkTevkarî bike

Ji vê rûpelê delîl bidin.

Reports weşana sê mehane ya Konsorsiyûmê ye. Tiştê ku tu li ser vê mijarê dizanî dikare di çapa pêş de bibe delîl, dosya an rastkirin, bi navê te û di bin CC BY 4.0 de weşandî li cihê ku karê te bi xwe be.

Global Risks Forum
Sekreterya Konsorsiyûmê

Prepare a mission worth testing.

The Secretariat answers Universe enquiries and names the next step. An enquiry receives a reference; it does not create a mission place, an allocation or a registration.