GRF · Universe at GRF
Ukuziqeqesha nokufunda
Exercises test whether roles, information and decisions hold together under degraded conditions. Plans that look complete fail at the joins: a warning reaching the wrong desk, a decision nobody is sure they may take. The Global Risks Forum (GRF) stewards the exercises; the technical office of The Global Centre for Risk and Innovation (GCRI) runs control and evidence capture. Simulation is marked. Live systems are never touched without approval. Failures become findings.
Exercises and learning in seven parts.
- 01Exercise controlsSix controls designed into every exercise
- 02Scenario designBuilding a scenario that tests the arrangement, not the participants
- 03LearningFrom observation to change
- 04Exercise designHow an exercise is built, run and evaluated
- 05Simulation integrityWhat an exercise result is, and what it is not
- 06From exercise to lessonThe learning loop
- 07SourcesWhere this page’s references lead
Six controls designed into every exercise.
- 01
Control
A scenario events list with exercise controllers and simulation cells, so every inject is planned and traceable.
- 02
Evaluation
Independent evaluators test objectives and observable performance, not attendance. A reviewer with a declared conflict never signs the acceptance concerned.
- 03
Safety
Time control, safety holds and an explicit real-world emergency override. Any participant may call a safety hold.
- 04
Containment
Simulated warnings never reach live audiences, and real infrastructure is never an unapproved target.
- 05
Record
Dissent and adverse findings are preserved in the after-action record.
- 06
Learning
Improvement items return to the next annual agenda, with an owner for each.
Building a scenario that tests the arrangement, not the participants.
- Start from the arrangement’s assumptions and design injects that challenge each one.
- Use plausible, evidence-based hazard parameters from GCRI, labelled as illustrative where invented.
- Include at least one inject that crosses a jurisdiction or a sector boundary.
- Build in a point where information is late, wrong or contradictory, as in real events.
- Keep a controller log of every inject and response.
How the process runs.
Process explorer · Process
Exercises and learning: Exercise from design to lessons
11 steps·4 stages·2 gates
Inqubo
Exercises and learning: Exercise from design to lessons
An exercise needs objectives, qualified environments and independent evaluators; GRF authorises controlled live operation, evidence is sealed and the review keeps dissent.
01 Design
- 01ObjectivesRecord · The Global Risks ForumIndependent evaluators assess each exercise against its stated objectives. Nothing simulated is reported as observed impact.
- 02Entry conditionsComponentThe week starts only with qualified environments, controllers, evaluators, a scenario plan and stop-work authority.
- 03Direction, control and evaluation kept apartComponent · The Global Risks ForumGRF holds direction and admission, and GCRI’s technical office runs the simulation environment. Evaluators did not design the scenario.
02 Conduct
- 04G4 · Controlled live operation authorisedGate · The Global Risks ForumGRF authorises controlled live operation for Action Week.
- 05Action Week: controlled exercisesExercise · UniverseTen exercise tracks run with independent evaluators and observation. None carries live actuation, incident command or warning authority.
- 06Exercise injects, finance track exampleStep · The Global Risks AllianceFinance and insurance readiness injects include a crossed parametric trigger or a wider sovereign spread. No transaction occurs.
- 07Run, decision and observation recordsRecordAction Week leaves run records, decision records, observation records and exercise assessments.
03 Close
- 08Stand-downStep · GCRINew work stops and authorised jobs are checkpointed. Temporary access is revoked and temporary capacity is released.
- 09G5 · Evidence sealed and stand-down recordedGate · The Global Risks ForumThe evidence is sealed with its provenance and the stand-down is recorded. Unresolved exceptions are recorded with accountable owners.
04 Learn
- 10After-action reviewStep · UniverseUniverse reviews what worked, what failed and what was not tested, preserving dissent.
- 11Improvement items with ownersRecord · UniverseThe exercise exits with improvement items. Method and gap findings become change proposals, and corrective actions close in the next period.
Universe · The programme year · A national missionDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The one-day stand-down is still proposed.
From observation to change.
Learning programmes often stop at the lessons-identified stage. The test is whether a lesson becomes a change in a plan, a protocol or a training programme. Each lesson from an exercise is assigned to an owner institution, which reports what it changed; the lesson is closed only when the owner says so.
Lessons appear in institutional learning.
How an exercise is built, run and evaluated.
| Element | Yini | Practice it follows |
|---|---|---|
| Objectives | Stated before the scenario is written, each tied to an arrangement to be tested | Exercise programme practice such as HSEEP (revised 2020) |
| Type | Tabletop, functional or full-scale, chosen for the objectives and stepped up only when the earlier type has been passed | WHO Simulation Exercise Manual (2017) |
| Scenario and injects | A master scenario events list of timed injects, including late, wrong or contradictory information and at least one cross-boundary inject | ISO 22398:2013 guidelines for exercises |
| Hot wash | An immediate structured debrief while observations are fresh | Standard exercise practice |
| After-action report | Findings against objectives, strengths, gaps, dissent and an improvement plan with an owner for each item | WHO after action review guidance (2019) |
Scenarios are labelled as scenarios. An exercise finding describes how an arrangement performed under stated assumptions. It is never a forecast, a warning or a pass mark. The offer: GRF programmes. The gates: annual operating cycle. Published outputs: evidence and outcomes. The technical side: GCRI’s Universe technical office.
What an exercise result is, and what it is not.
Evidence with limits
Observations of how arrangements performed in a controlled scenario, with the scenario’s assumptions and limitations stated.
Observed impact
Simulated loss or performance is not observed impact, and an exercise result is not a forecast, a rating or an approval.
Released after review
Results are published only after scientific and editorial review, at gate G6, and restricted results stay restricted.
The learning loop.
- An exercise owner states the objectives and the arrangements to be tested before the scenario is designed.
- Participants take part with authority to act in the scenario, so decisions reflect real roles.
- Evaluators record observations against the objectives during the action week.
- The after-action review agrees findings, including failures and dissent, and names improvement items.
- Improvement items are tracked to closure and inform the next mandate at gate G7.
A failed test is a finding, not an embarrassment to be removed. A safety hold stops the exercise and is recorded.
Where this page’s references lead.
The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.
Questions and answers.
Can an exercise run on our live systems?
Who sees the results?
Are exercises running now?
Is Universe an emergency response service?
Bring a governance question to the Forum.
Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.
Legal documents.
Show all 18 legal documents
Maps, data and figures on this site are shown for context and general information. They are not advice, forecasts or warnings; the limits of the information are set out in the Disclaimers and Data Notices.