GRF · GRF 中的 Universe
演练与学习
Exercises test whether roles, information and decisions hold together under degraded conditions. Plans that look complete fail at the joins: a warning reaching the wrong desk, a decision nobody is sure they may take. The Global Risks Forum (GRF) stewards the exercises; the technical office of The Global Centre for Risk and Innovation (GCRI) runs control and evidence capture. Simulation is marked. Live systems are never touched without approval. Failures become findings.
分为七个部分的演练与学习。
每次演练均内置六项控制措施。
- 01
控制
包含演练控制员和模拟小组的情景事件清单,使每一项注入事件都有计划且可追溯。
- 02
评估
Independent evaluators test objectives and observable performance, not attendance. A reviewer with a declared conflict never signs the acceptance concerned.
- 03
安全
时间控制、安全暂停以及明确的现实紧急情况优先机制。任何参与者均可发起安全暂停。
- 04
Containment
模拟预警绝不会送达真实受众,真实基础设施也绝不会成为未经批准的目标。
- 05
记录
异议和不利结论保留在事后复盘记录中。
- 06
学习
Improvement items return to the next annual agenda, with an owner for each.
构建检验安排本身而非参与者的情景。
- Start from the arrangement’s assumptions and design injects that challenge each one.
- Use plausible, evidence-based hazard parameters from GCRI, labelled as illustrative where invented.
- 至少设置一项跨越管辖区域或行业界限的情景注入。
- 设置一个信息迟到、错误或相互矛盾的节点,如同真实事件中那样。
- 对每次注入和响应保留控制员日志。
流程如何运行。
Process explorer · Process
Exercises and learning: Exercise from design to lessons
11 个步骤·4 个阶段·2 道关口
流程
Exercises and learning: Exercise from design to lessons
演练需要目标、合格的环境与独立评估人员;GRF 授权受控的实时运行,证据被封存,审查保留异议。
01 设计
- 01目标记录 · Global Risks Forum独立评估人员对照既定目标评估每次演练。任何模拟内容都不会被报告为观测到的影响。
- 02准入条件组件只有在环境、控制人员、评估人员、情景计划与停工权限均已具备资格时,该周才会开始。
- 03Direction, control and evaluation kept apartComponent · The Global Risks ForumGRF holds direction and admission, and GCRI’s technical office runs the simulation environment. Evaluators did not design the scenario.
02 实施
- 04G4 · 受控实际运行获授权关口 · Global Risks ForumGRF 授权在行动周期间进行受控的实际运行。
- 05行动周:受控演练演练 · Universe十个演练议程在独立评估人员与观察下进行。没有一个涉及实时执行、事件指挥或预警权限。
- 06演练注入事件,金融议程示例步骤 · Global Risks Alliance金融与保险准备度注入事件包括被触发的参数化触发条件或扩大的主权利差。不发生任何交易。
- 07运行、决策与观察记录记录行动周留下运行记录、决策记录、观察记录与演练评估。
03 结束
- 08解除警戒步骤 · GCRI新工作停止,已授权的作业设置检查点。临时访问权限被撤销,临时容量被释放。
- 09G5 · 证据已封存,解除待命已记录关口 · Global Risks Forum证据连同其来源追溯一并封存,撤除过程被记录在案。未解决的例外情况连同可问责的负责人一并记录。
04 学习
- 10行动后审查步骤 · UniverseUniverse 审查哪些有效、哪些失败、哪些未经检验,并保留异议。
- 11有负责人的改进事项记录 · Universe演练结束时形成改进事项。方法与缺口发现成为变更提案,纠正措施在下一期间完成。
Universe · The programme year · A national missionDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The one-day stand-down is still proposed.
From observation to change.
学习项目常常止步于总结经验教训阶段。检验标准是教训是否转化为计划、规程或培训项目的改变。演练中的每项教训都分配给一个责任机构,由其报告所做的改变;只有责任方确认后,该教训才算关闭。
Lessons appear in institutional learning.
How an exercise is built, run and evaluated.
| 要素 | 概述 | 其遵循的实践 |
|---|---|---|
| 目标 | 在编写情景之前陈述,每项均与一项待检验的安排相对应 | Exercise programme practice such as HSEEP (revised 2020) |
| 类型 | 桌面演练、功能演练或全面演练,根据目标选择,且只有在通过前一类型之后才逐级提升 | WHO Simulation Exercise Manual (2017) |
| Scenario and injects | 按时间安排的情景注入事件主清单,包括迟到、错误或相互矛盾的信息,以及至少一项跨边界注入 | ISO 22398:2013 guidelines for exercises |
| 即时复盘 | 趁观察印象鲜明时立即进行结构化复盘 | Standard exercise practice |
| 事后评估报告 | 对照目标的发现、优势、差距、异议,以及为每一项设定责任人的改进计划 | 世界卫生组织行动后审查指南(2019) |
Scenarios are labelled as scenarios. An exercise finding describes how an arrangement performed under stated assumptions. It is never a forecast, a warning or a pass mark. The offer: GRF programmes. The gates: annual operating cycle. Published outputs: evidence and outcomes. The technical side: GCRI’s Universe technical office.
演练结果是什么,以及不是什么。
Evidence with limits
Observations of how arrangements performed in a controlled scenario, with the scenario’s assumptions and limitations stated.
观测到的影响
Simulated loss or performance is not observed impact, and an exercise result is not a forecast, a rating or an approval.
Released after review
成果只有经过科学和编辑审查,在 G6 关口之后才会发布,受限成果仍保持受限。
学习闭环。
- 在设计情景之前,演练负责人须说明演练目标和待测试的安排。
- Participants take part with authority to act in the scenario, so decisions reflect real roles.
- Evaluators record observations against the objectives during the action week.
- 行动后审查就结论达成一致,包括失误和不同意见,并指明改进事项。
- Improvement items are tracked to closure and inform the next mandate at gate G7.
失败的测试是一项发现,而不是需要掩盖的难堪。安全中止会停止演练,并予以记录。
Where this page’s references lead.
阅读本页时所对照的机构和文件。状态和版本会变化;每个链接都指向发布机构。
问题与解答。
Can an exercise run on our live systems?
谁能看到结果?
目前有演练在进行吗?
Is Universe an emergency response service?
法律文件。
显示全部 18 份法律文件
本网站上的地图、数据和图表仅作为背景和一般信息展示。它们不是建议、预测或预警;信息的局限见免责声明和数据说明。