Exercises test whether roles, information and decisions hold together under degraded conditions. Plans that look complete fail at the joins: a warning reaching the wrong desk, a decision nobody is sure they may take. The Global Risks Forum (GRF) stewards the exercises; the technical office of The Global Centre for Risk and Innovation (GCRI) runs control and evidence capture. Simulation is marked. Live systems are never touched without approval. Failures become findings.

02Controles do exercício

Seis controles incorporados ao desenho de cada exercício.

  1. 01

    Controle

    A scenario events list with exercise controllers and simulation cells, so every inject is planned and traceable.

  2. 02

    Avaliação

    Avaliadores independentes testam objetivos e desempenho observável, não a presença. Um revisor com conflito declarado nunca assina a aceitação em questão.

  3. 03

    Segurança

    Time control, safety holds and an explicit real-world emergency override. Any participant may call a safety hold.

  4. 04

    Contenção

    Alertas simulados nunca chegam a públicos reais, e a infraestrutura real nunca é um alvo não aprovado.

  5. 05

    Registro

    Divergências e conclusões adversas são preservadas no registro pós-ação.

  6. 06

    Aprendizagem

    Improvement items return to the next annual agenda, with an owner for each.

03Desenho de cenários

Construir um cenário que teste o arranjo, e não os participantes.

  • Start from the arrangement’s assumptions and design injects that challenge each one.
  • Use plausible, evidence-based hazard parameters from GCRI, labelled as illustrative where invented.
  • Inclua pelo menos um inject que atravesse uma jurisdição ou o limite de um setor.
  • Inclua um ponto em que a informação chega atrasada, errada ou contraditória, como em eventos reais.
  • Mantenha um registro do controlador de cada evento injetado e de cada resposta.
04Processo

Como decorre o processo.

Process explorer · Process

Exercises and learning: Exercise from design to lessons

11 passos4 etapas2 portões

Processo

Exercises and learning: Exercise from design to lessons

Um exercício precisa de objetivos, ambientes qualificados e avaliadores independentes; o GRF autoriza a operação real controlada, as evidências são lacradas e a revisão preserva as divergências.

  1. 01 Conceber

    1. 01ObjetivosRegistro · The Global Risks ForumAvaliadores independentes avaliam cada exercício em relação aos seus objetivos declarados. Nada do que é simulado é relatado como impacto observado.
    2. 02Condições de entradaComponenteA semana só começa com ambientes qualificados, controladores, avaliadores, um plano de cenário e autoridade para interromper o trabalho.
    3. 03Direction, control and evaluation kept apartComponent · The Global Risks ForumGRF holds direction and admission, and GCRI’s technical office runs the simulation environment. Evaluators did not design the scenario.
  2. 02 Conduzir

    1. 04G4 · Operação real controlada autorizadaEtapa de controle · The Global Risks ForumO GRF autoriza a operação real controlada para a Semana de ação.
    2. 05Semana de Ação: exercícios controladosExercício · UniverseDez trilhas de exercício funcionam com avaliadores independentes e observação. Nenhuma tem acionamento real, comando de incidentes ou autoridade de alerta.
    3. 06Injeções do exercício, exemplo da trilha financeiraEtapa · The Global Risks AllianceAs injeções de preparação financeira e de seguros incluem um gatilho paramétrico ultrapassado ou um spread soberano mais amplo. Nenhuma transação ocorre.
    4. 07Registros de execução, de decisão e de observaçãoRegistroA Semana de Ação deixa registros de execução, registros de decisão, registros de observação e avaliações do exercício.
  3. 03 Encerrar

    1. 08EncerramentoEtapa · GCRIO trabalho novo é interrompido e os trabalhos autorizados recebem um ponto de controle. Os acessos temporários são revogados e a capacidade temporária é liberada.
    2. 09G5 · Evidências seladas e encerramento registradoEtapa de controle · The Global Risks ForumAs evidências são lacradas com sua proveniência e o encerramento é registrado. As exceções não resolvidas são registradas com responsáveis que prestam contas.
  4. 04 Aprender

    1. 10Revisão pós-açãoEtapa · UniverseO Universe examina o que funcionou, o que falhou e o que não foi testado, preservando as divergências.
    2. 11Itens de melhoria com responsáveisRegistro · UniverseO exercício termina com itens de melhoria. As constatações sobre métodos e lacunas tornam-se propostas de alteração, e as ações corretivas são concluídas no período seguinte.

Universe · The programme year · A national missionDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation. The one-day stand-down is still proposed.

05Aprendizagem

Da observação à mudança.

Learning programmes often stop at the lessons-identified stage. The test is whether a lesson becomes a change in a plan, a protocol or a training programme. Each lesson from an exercise is assigned to an owner institution, which reports what it changed; the lesson is closed only when the owner says so.

Lessons appear in institutional learning.

06Concepção do exercício

How an exercise is built, run and evaluated.

ElementoO que éPrática que segue
ObjetivosDefinidos antes de o cenário ser redigido, cada um vinculado a um arranjo a ser testadoPráticas de programas de exercícios, como o HSEEP (revisado em 2020)
TipoSimulado de mesa, funcional ou em escala real, escolhido conforme os objetivos e ampliado somente quando o tipo anterior tiver sido superadoWHO Simulation Exercise Manual (2017)
Scenario and injectsA master scenario events list of timed injects, including late, wrong or contradictory information and at least one cross-boundary injectISO 22398:2013 guidelines for exercises
Hot washAn immediate structured debrief while observations are freshStandard exercise practice
Relatório pós-açãoConstatações em relação aos objetivos, pontos fortes, lacunas, divergências e um plano de melhoria com um responsável para cada itemOrientações da OMS sobre revisão pós-ação (2019)

Scenarios are labelled as scenarios. An exercise finding describes how an arrangement performed under stated assumptions. It is never a forecast, a warning or a pass mark. The offer: GRF programmes. The gates: annual operating cycle. Published outputs: evidence and outcomes. The technical side: GCRI’s Universe technical office.

07Integridade da simulação

What an exercise result is, and what it is not.

It is

Evidence with limits

Observations of how arrangements performed in a controlled scenario, with the scenario’s assumptions and limitations stated.

It is not

Observed impact

Simulated loss or performance is not observed impact, and an exercise result is not a forecast, a rating or an approval.

Análise

Released after review

Os resultados só são publicados após revisão científica e editorial, na etapa de controle G6, e os resultados restritos permanecem restritos.

08From exercise to lesson

O ciclo de aprendizagem.

  • Um responsável pelo exercício declara os objetivos e os arranjos a serem testados antes de o cenário ser desenhado.
  • Participants take part with authority to act in the scenario, so decisions reflect real roles.
  • Evaluators record observations against the objectives during the action week.
  • A revisão pós-ação acorda as conclusões, incluindo falhas e divergências, e nomeia os itens de melhoria.
  • Improvement items are tracked to closure and inform the next mandate at gate G7.

Um teste que falha é uma constatação, não um constrangimento a ser removido. Uma suspensão de segurança interrompe o exercício e é registrada.

09Fontes

Where this page’s references lead.

Os organismos e documentos à luz dos quais esta página é lida. O estado e as edições mudam; cada ligação leva ao organismo emissor.

10Perguntas

Perguntas e respostas.

Can an exercise run on our live systems?
Not without approval. Exercises are controlled. Simulated messages are marked and kept from live audiences. Real infrastructure is never an unapproved target. A safety hold or a real emergency can stop the exercise at any time.
Who sees the results?
Os participantes veem o registro pós-ação. Os resultados públicos só são divulgados após revisão e autorização de publicação, e os resultados restritos permanecem restritos.
Há exercícios em andamento?
Não. Os exercícios são realizados depois que uma edição é autorizada. Ainda não há nenhuma edição registrada; as consultas recebem uma referência pelo portal do Universe.
O Universe é um serviço de resposta a emergências?
No. It is not an emergency service or incident command. In immediate danger, contact your local emergency services.
The Global Risks Forum

Leve uma questão de governança ao Fórum.

A informação e os pedidos estão abertos hoje. Um pedido recebe uma referência e indica o próximo passo; candidaturas, pagamentos, alocações de computação e registros só abrem quando existem a equipa, os termos e a capacidade de revisão.