GRF · Yönetişim ve güven
Konsey kuralları ve hesap verebilirlik
Council rules come before council seats. The Global Risks Forum (GRF) designs each council with a stated purpose, a selection procedure, conduct expectations and limits on what a seat confers, published before applications open. The design follows the OECD Recommendation on Public Integrity (2017): declared interests, recusal, records, an independent complaints route. No council rules are formally adopted yet. The adoption record will appear here.
Council rules and accountability in seven parts.
- 01Temel kurallarHer konseyin uymak üzere tasarlandığı dört kural
- 02Conduct codeElements of a council code of conduct
- 03AdoptionHow rules become binding
- 04Role-specific conductWhat each role is expected to do
- 05Adoption recordHow the rules become binding
- 06AccountabilityWhere to raise a concern
- 07SourcesWhere this page’s references lead
Her konseyin uyması için tasarlanmış dört kural.
- 01
Ödemeden önce seçim
Leaders are selected first; any contribution follows written terms. No payment secures selection, a seat or a renewal.
- 02
Yeterlilik ve uygunluk ile çıkar çatışması incelemesi
Before invitation, each candidate is to be reviewed for conflicts and suitability. A person with a declared conflict does not decide or sign the matter it concerns.
- 03
Konsey çalışmalarının kayıtları
Gündemler, onaylanmış tutanaklar ve taahhütler, katılımcıların mutabakatına göre yayımlanacak; muhalefet şerhleri kayda geçirilecektir. Bkz. konsey çalışmaları ve şeffaflık.
- 04
Satın alınmış statü yok
Bir koltuk asla bir makam, istihdam, yönetim kurulu üyeliği veya kısıtlı veri satın almaz.
Bir konsey davranış kuralları belgesinin unsurları.
- Duty to declare interests and to step aside when conflicted.
- Respect for attribution rules and confidentiality of drafts.
- No use of the council for commercial solicitation.
- Courtesy and non-discrimination in sessions.
- Consequences for breach, with a fair process.
Sürecin nasıl işlediği.
Process explorer · Process
Bir düzeltme nasıl ilerler
12 steps·5 stages
Süreç
Bir düzeltme nasıl ilerler
Herkes üyelik olmadan düzeltme talep edebilir; kabul edilen düzeltme yeni bir sürüm olur ve önceki sürüm gerekçesiyle birlikte kayıtta kalır.
01 Bildirimde bulunan
- 01Herkes düzeltme talep edebilirAktör · HerkesHerkes, üyelik olmadan düzeltme talep edebilir. Zararı bildirmek veya kamuya açık bilgiyi düzeltmek için üyelik ya da Hesap gerekmez.
02 Yönlendirme ve alındı bildirimi
- 02Kaygının türüne göre yönlendirilirAdımBilimsel bir düzeltme veya dürüstlük kaygısı sorumlu editöre veya kaynak sahibine iletilir.
- 03Alındı bildirimiKayıtBir soru soran, yerel bilgi paylaşan veya bir kaygı bildiren herkes bir alındı bildirimi ve konunun nasıl ele alındığına ilişkin bir karar alır.
03 İnceleme
- 04Editör veya kaynak sahibi tarafından incelemeAdım · Sorumlu editör veya kaynak sahibiBeyan edilmiş bir çatışması olan incelemeci ilgili kabulü asla imzalamaz.
- 05Bir karara yönelik şikâyetAdım · Karardan sorumlu olmayan bir incelemeciBir program veya karar şikâyeti, itiraz edilen karardan sorumlu olmayan biri tarafından incelenir.
- 06Gizlilik, güvenlik ve koruma kuyruklarıAdımGizlilik ve hak talepleri Gizlilik Sorumlusu kuyruğuna, güvenlik bildirimleri ise güvenlik açıklama kuyruğuna gider.
04 Sonuç
- 07Kabul edilen düzeltme yeni bir sürüm olurKayıtKabul edilen bir düzeltme kaydedilmiş yeni bir sürüm oluşturur.
- 08Konunun nasıl ele alındığı kaydedildiKayıtBildirimde bulunan kişi, konunun nasıl ele alındığına ilişkin bir karar ve uygun olduğunda bir çözüm veya yönlendirme alır. Belgeler, reddedilen bir düzeltme için itiraz yolu belirtmez.
05 Kayda işlenir
- 09Etkilenen analiz düzeltilmiş girdilerle yeniden yürütülürAdım · Foundry ayağıEtkilenen analiz düzeltilmiş girdilerle yeniden yürütülür.
- 10Change proposal to the standardsRecord · Nexus StandardsMethod and correction findings go to Nexus Standards as change proposals (F06). It records the correction as a change to the evidence.
- 11Bulguyu öğreten kurslar güncellenirAdım · Risk AcademyRisk Academy, düzeltilen bulguyu öğreten her kursu günceller.
- 12Düzeltme ve gerekçesiyle yeni sürümKayıt · RaporlarReports, düzeltmeyi ve gerekçesini içeren yeni bir sürüm yayımlar. Önceki sürüm düzeltme geçmişiyle birlikte kayıtta kalır.
Status and service levels · Reports · The programme yearDesigned process, not a record of any case: no cycle has run and every programme is at service level R0, information and enquiries. A gate is a programme decision, never a public-authority approval, a certification or a deployment authorisation. The competent authority decides.
How rules become binding.
Rules are adopted by the responsible GRF organ, dated and published before any nomination opens. Amendments follow the same route, with a notice on news.
What each role is expected to do.
| Rol | Conduct expected |
|---|---|
| Council members (institutions) | Act through authorised representatives, declare interests, follow through on recorded commitments and respect restricted sessions |
| Leadership Council members | Kişisel sıfatla görev yapmak, koltuğu doğru biçimde tanımlamak, çıkarları beyan etmek ve çıkar çatışması olduğunda karar sürecinden çekilmek |
| Working-group contributors | Görev ve yetkinlik sınırları içinde çalışın, kaynakları ve sınırları belirtin, gözetimi kabul edin |
| Chairs and conveners | Run fair inclusion procedures, record dissent and never report silence as agreement |
| Değerlendiriciler ve incelemeciler | Declare conflicts and never sign an acceptance they are conflicted on |
| Ev sahipleri ve destekçiler | Desteğin gündemden, katılımcılardan ve bulgulardan ayrı tutulmasına saygı gösterin |
Kuralların bağlayıcı hale gelmesi nasıl olur.
Henüz benimsenmedi
The rules on this page are the design. Global and regional councils are in formation, and no council rules have yet been formally adopted.
Yayımlanmış kayıt
When rules are adopted, this page will show the adopting body, the date, the text in force and the councils it applies to.
Versioned changes
Later changes are adopted the same way and published as new versions, with earlier versions kept.
Konseyler program organlarıdır, derneğin yasal organları değildir. GRF, esas sözleşmesi uyarınca yasal organları tarafından yönetilir.
Bir endişenin nereye iletileceği.
Send concerns about council conduct or decisions to the integrity concern form. Someone not responsible for the contested decision reviews them; see corrections and concerns. Safeguarding concerns use the restricted route on participant safeguarding. The model: council architecture. The overview: Governance and trust.
Where this page’s references lead.
Bu sayfanın karşılaştırıldığı kuruluşlar ve belgeler. Durumlar ve sürümler değişir; her bağlantı yayımlayan kuruluşa gider.
Sorular ve yanıtlar.
Are these rules in force?
Who adopts council rules?
What happens if a member breaks the rules?
Bir yönetişim sorusunu Forum'a getirin.
Bilgi ve başvurular bugün açıktır. Bir başvuru bir referans numarası alır ve bir sonraki adımı belirtir; başvurular, ödemeler, işlem kapasitesi tahsisleri ve kayıtlar yalnızca ekipleri, koşulları ve inceleme kapasiteleri mevcut olduğunda açılır.
Hukuki belgeler.
18 hukuki belgenin tümünü göster
Bu sitedeki haritalar, veriler ve şekiller bağlam ve genel bilgi amacıyla gösterilir. Tavsiye, tahmin ya da uyarı değildir; bilgilerin sınırları Sorumluluk Reddi ve Veri Bildirimleri'nde açıklanmıştır.