Skip to content

GRF · الحوكمة والثقة

قواعد المجالس والمساءلة

Council rules come before council seats. The Global Risks Forum (GRF) designs each council with a stated purpose, a selection procedure, conduct expectations and limits on what a seat confers, published before applications open. The design follows the OECD Recommendation on Public Integrity (2017): declared interests, recusal, records, an independent complaints route. No council rules are formally adopted yet. The adoption record will appear here.

02Core rules

Four rules every council is designed to follow.

  1. 01

    الاختيار قبل الدفع

    Leaders are selected first; any contribution follows written terms. No payment secures selection, a seat or a renewal.

  2. 02

    مراجعة الكفاءة والنزاهة وتضارب المصالح

    Before invitation, each candidate is to be reviewed for conflicts and suitability. A person with a declared conflict does not decide or sign the matter it concerns.

  3. 03

    سجلات عمل المجالس

    Agendas, approved minutes and commitments are to be published as participants agree, with dissent recorded; see council work and transparency.

  4. 04

    لا صفة مشتراة

    لا يشتري المقعد أبدًا منصبًا أو وظيفة أو مقعدًا في مجلس إدارة أو بيانات مقيدة.

03Conduct code

Elements of a council code of conduct.

  • Duty to declare interests and to step aside when conflicted.
  • Respect for attribution rules and confidentiality of drafts.
  • No use of the council for commercial solicitation.
  • Courtesy and non-discrimination in sessions.
  • Consequences for breach, with a fair process.
04العملية

كيف تُسيَّر العملية.

Process explorer · Process

كيف يسير التصحيح

12 steps5 stages

العملية

كيف يسير التصحيح

يحق لأي شخص طلب تصحيح دون عضوية؛ ويصبح التصحيح المقبول إصدارًا جديدًا، ويبقى الإصدار السابق في السجل مع السبب.

  1. 01 المُبلِّغ

    1. 01يحق لأي شخص طلب تصحيحالفاعل · أي شخصيحق لأي شخص طلب تصحيح، دون عضوية. ولا يلزم أي عضوية أو حساب للإبلاغ عن ضرر أو لتصحيح معلومات عامة.
  2. 02 التوجيه والإقرار بالاستلام

    1. 02التوجيه حسب نوع المسألةخطوةيُحال التصحيح العلمي أو المخاوف المتعلقة بالنزاهة إلى المحرر المسؤول أو مالك المصدر.
    2. 03الإقرار بالاستلامالتسجيلكل من يطرح سؤالًا أو يشارك معرفة محلية أو يُبلغ عن مخاوف يتلقى إقرارًا بالاستلام وقرارًا بشأن مسألته.
  3. 03 المراجعة

    1. 04المراجعة من المحرر أو مالك المصدرالخطوة · المحرر المسؤول أو مالك المصدرلا يوقّع المراجع الذي أفصح عن تعارض في المصالح أبدًا على القبول ذي الصلة.
    2. 05شكوى بشأن قرارالخطوة · مراجع غير مسؤول عن القرارتُراجَع الشكوى المتعلقة ببرنامج أو قرار من جانب شخص غير مسؤول عن القرار المطعون فيه.
    3. 06قوائم الخصوصية والأمن والحمايةخطوةتُحال طلبات الخصوصية والحقوق إلى قائمة مسؤول الخصوصية، وبلاغات الأمن إلى قائمة الإفصاح الأمني.
  4. 04 النتيجة

    1. 07يصبح التصحيح المقبول إصدارًا جديدًاالتسجيلينشئ التصحيح المقبول إصدارًا جديدًا مسجّلًا.
    2. 08قرار بشأن المسألة مسجّلالتسجيليتلقى المُبلِّغ قرارًا بشأن مسألته، وحيثما اقتضى الأمر، معالجةً أو إحالة. ولا تذكر الوثائق أي طعن في رفض التصحيح.
  5. 05 أُدرج في السجل

    1. 09إعادة تشغيل التحليل المتأثر بمدخلات مصحَّحةالخطوة · ركيزة Foundryيُعاد تشغيل التحليل المتأثر بالمدخلات المصحَّحة.
    2. 10اقتراح تغيير على المعاييرالسجل · ⁨Nexus Standards⁩تُحال نتائج المناهج والتصحيحات إلى Nexus Standards بوصفها مقترحات تغيير (F06). وتسجّل التصحيح بوصفه تغييرًا في الأدلة.
    3. 11المقررات التي درّست النتيجة حُدِّثتالخطوة · Risk Academyتحدّث Risk Academy أي دورة درّست النتيجة المصحَّحة.
    4. 12إصدار جديد بالتصحيح وسببهالسجل · ⁨Reports⁩تنشر Reports إصدارًا جديدًا يتضمن التصحيح وسببه. ويبقى الإصدار السابق في السجل مع تاريخ التصحيحات.

Status and service levels · Reports · The programme yearDesigned process, not a record of any case: no cycle has run and every programme is at service level R0, information and enquiries. A gate is a programme decision, never a public-authority approval, a certification or a deployment authorisation. The competent authority decides.

05الاعتماد

How rules become binding.

Rules are adopted by the responsible GRF organ, dated and published before any nomination opens. Amendments follow the same route, with a notice on news.

06Role-specific conduct

What each role is expected to do.

الدورConduct expected
Council members (institutions)Act through authorised representatives, declare interests, follow through on recorded commitments and respect restricted sessions
Leadership Council membersServe in a personal capacity, describe the seat accurately, declare interests and recuse where conflicted
Working-group contributorsWork within the assignment and competence, cite sources and limits, and accept supervision
Chairs and convenersRun fair inclusion procedures, record dissent and never report silence as agreement
المقيّمون والمراجعونDeclare conflicts and never sign an acceptance they are conflicted on
الجهات المضيفة والداعمةRespect the separation of support from agenda, participants and findings
07Adoption record

How the rules become binding.

الحالة

Not yet adopted

The rules on this page are the design. Global and regional councils are in formation, and no council rules have yet been formally adopted.

الاعتماد

Published record

When rules are adopted, this page will show the adopting body, the date, the text in force and the councils it applies to.

التغييرات

Versioned changes

Later changes are adopted the same way and published as new versions, with earlier versions kept.

Councils are programme bodies, not the statutory organs of the association. GRF is governed by its statutory organs under its articles of association.

08المساءلة

أين تُثار المخاوف.

Send concerns about council conduct or decisions to the integrity concern form. Someone not responsible for the contested decision reviews them; see corrections and concerns. Safeguarding concerns use the restricted route on participant safeguarding. The model: council architecture. The overview: Governance and trust.

09المصادر

Where this page’s references lead.

الهيئات والوثائق التي تُقرأ هذه الصفحة في ضوئها. وتتغير الحالات والإصدارات؛ ويقود كل رابط إلى الهيئة المُصدِرة.

10أسئلة

أسئلة وأجوبة.

Are these rules in force?
Not yet. They are the design GRF intends to adopt before councils are constituted. The adoption record will be published here when it exists.
Who adopts council rules?
GRF’s competent statutory body under its articles of association. The adoption record will name the body and the date.
What happens if a member breaks the rules?
The adopted rules will set out the procedure. As designed, a concern is reviewed by someone not responsible for the decision, the member is heard, and the outcome is recorded with reasons.
المنتدى العالمي للمخاطر (⁨The Global Risks Forum⁩)

اعرض مسألة حوكمة على المنتدى.

المعلومات والاستفسارات متاحة اليوم. ويحصل الاستفسار على رقم مرجعي ويحدد الخطوة التالية؛ ولا تُفتح الطلبات والمدفوعات وتخصيصات الحوسبة والتسجيلات إلا حين يتوافر فريقها وشروطها وقدرة المراجعة.