Most crisis failures are failures of authority, not knowledge: nobody knew who could decide, who to consult or who would answer for the result. The OECD Recommendation on the Governance of Critical Risks (2014) asks governments to name a lead for each critical risk. The Global Risks Forum (GRF) helps institutions make decision rights explicit before they are needed: mandate, responsible actor, delegation, gaps. GRF records the agreements. It never takes the decision.
Decision rights and responsibilities in seven parts.
- 01Four elementsWhat a decision-rights map records
- 02NotationFrom a RACI chart to a decision-rights record
- 03Workshop formatHow a mapping session runs
- 04The methodHow a responsibility map is built and tested
- 05Records and standardsWhy a common format matters
- 06GRF’s own decision rightsWhere GRF decides, and where it does not
- 07SourcesWhere this page’s references lead
What a decision-rights map records.
The source of authority
Bir kuruma yetkisini veren yasa, belge veya tüzük ve bu yetkinin sınırları.
Who decides and answers
Karar veren ve karardan sorumlu olan makam veya kişi.
Who acts for whom
What has been delegated, to whom, under what conditions and how it can be withdrawn.
Where authority is unclear
Decisions that fall between mandates, or that several institutions believe are theirs.
From a RACI chart to a decision-rights record.
Project managers use RACI charts to say who is responsible, accountable, consulted and informed. Public decisions need two more columns. One for the legal basis of the authority. One for the condition that moves a decision from one holder to another, such as a declared emergency or a threshold on a gauge. A decision-rights record therefore names the decision, the holder, the instrument, the trigger, the people who must be consulted and the route of appeal or review.
| Alan | Örnek kayıt (açıklayıcı) |
|---|---|
| Karar | Release water from a reservoir ahead of forecast inflow |
| Sahibi | Dam operator under its licence |
| Araç | Operating rules set under the licence issued by the water regulator |
| Trigger for escalation | Forecast exceeding a stated return period, at which point the basin authority directs |
| Must consult | Downstream municipalities, civil protection |
| İnceleme | Regulator’s post-event review |
Kurumun nasıl yönetildiği.
Process explorer · Governance
Forumun rolü ve sınırları
7 steps·4 stages·1 gate
Yönetişim
Forumun rolü ve sınırları
Konsorsiyum · Yönetişim · Konseyler · Diyaloglar · Program yılı · Platformlar · Standartlar · Raporlar · Katılın · Evren yılı · Eylem Haftası · Devir teslimler · Program durumları · Program yılı · Ulusal bir görev · Misyon kabulü · Veriler ve kaynaklar yeterli bulundu · Tatbikat için kabul edilen yapı · Action Week canlı operasyonu · Görevden çekilme ve kanıt mühürlendi · Yayın yetkilendirildi · Düzeltme ve yenileme · Nexus döngüsü · Ulusal Nexus · Bölgesel programlar · Çalışma grupları · Yetkinlik Hücreleri ve CERT · Kurum olarak katılım · Yönetişim diyalogları · Raporlar · Risk Akademisi · Finansmana hazırlık dosyası · Nexus Consortium · Yirmi yedi aşamalı döngü · Yürütülebilir yıllık döngü · Şikâyet ve itiraz · Kuruluş ve kurumsal tesis · Konsorsiyum oluşum yaşam döngüsü · Anayasa değişikliği · Bağımsız inceleme ve itiraz · Düzeltme ve itiraz edilebilirlik · Kayıt girdisi · Kurul tüzüğü ve konsey · Halefiyet · Kamu yararı ve ele geçirilmeye karşı koruma · Dış otoriteye devir · Finansman · Kamuya açık şeffaflık · G0'dan G7'ye kadar geçitler · Yıllık gündemin oluşturulması · NNC üyeliği · Birinci yıl liderlik yolu · Kamu otoritesi arayüzü ve yetki devri · Yıllık Universe işletim döngüsü · Katılım kampanyası
Kamu yararı gözeten, kâr amacı gütmeyen bir İsviçre derneği; diyaloğa öncülük eder ve Universe'ün sorumlu yönetimini üstlenir, düzenleme, finansman, tedarik veya belgelendirme yapmaz.
01 Hukuki biçim
- 01İsviçre derneğiBaşlangıç · Yasal organlarİsviçre Medeni Kanunu'na tabi, yayımlanmış adresi Zug'da bulunan bir İsviçre derneği.
02 Yetki
- 02Liderlik ve diyalogAdım · The Global Risks ForumGRF, Nexus Consortiums genelinde kurumsal diyaloğa öncülük eder.
- 03Dört program kararıKarar · The Global Risks ForumYıllık yetki, görev kabulü, geçit kararları ve yayın izni.
03 Asla
- 04Asla düzenleme yapmaz, finanse etmez, satın alma yapmaz veya sertifika vermezGeçit · The Global Risks ForumPolitika, operasyonel ve finansal kararlar yetkili makamda kalır.
04 Birlikte çalıştığı yapılar
- 05The Global Centre for Risk and Innovation (GCRI) teknik ofisiKayıt · GCRITeknik ofisi GCRI yürütür. GRF'nin GCRI Canada adına sözleşme yapma yetkisi yoktur.
- 06The Global Risks Alliance (GRA) finansmana hazırlıkKayıt · The Global Risks AllianceGRA finansal sonuçları olan kayıtları okur ve seçenek notları sunar.
- 07Kayıtlı statülerSonuç · The Global Risks ForumGRF şu anda hiçbir dış statü kaydetmemektedir. Küresel ve bölgesel konseyler oluşum aşamasındadır.
Global Risks Forum · Kurumsal statüİşin nasıl yürütülmek üzere tasarlandığına dair bir özet; herhangi bir karar veya kaydın durumunu bildirmez.
How a mapping session runs.
- Each institution brings its own instruments: statutes, licences, emergency plans, delegations of authority.
- Kolaylaştırıcılar bir senaryoyu saat saat izler ve her adımda hukuka uygun olarak kimin harekete geçebileceğini ve kimin geçebileceğine inandığını sorar.
- Boşluklar ve çakışmalar, kusur atfedilmeksizin ortaya çıktıkça kaydedilir.
- The draft map returns to each institution’s legal adviser before anything is recorded as agreed.
- Disputed entries stay on the record as disputed, with each institution’s reading.
The method is shared with the Governance Nexus decision-rights page and applied in each specialist field; GRF holds no decision on the map it helps to draw.
Bir sorumluluk haritasının nasıl oluşturulduğu ve test edildiği.
- 01
Choose a scenario
A plausible event that crosses institutions, such as a prolonged power outage affecting hospitals and water supply.
- 02
List the decisions
The decisions the scenario requires, from warning to recovery, including the triggers for each.
- 03
Assign each decision
Her karar için yetki, sorumlu aktör, danışılması gerekenler ve bilgilendirilmesi gerekenler, her kurumun kendi beyan ettiği biçimde.
- 04
Surface disagreements
Where institutions disagree or no one claims a decision, the record says so plainly. Silence is never recorded as agreement.
- 05
Test and revise
Exercise the map in Universe, where injects deliberately land in the gaps, and revise it with the institutions concerned.
A responsibility map records what institutions agree about their own authority. It does not create, transfer or interpret legal authority, and it is not legal advice.
Why a common format matters.
Responsibility maps work best when neighbouring institutions can read each other’s. Where institutions record decision rights in incompatible ways, GRF can propose a common record format under the Nexus Standards development process. The Global Standards Council decides; national councils may adopt or adapt it. With consent, maps tested in exercises can inform the Universe Annual Synthesis.
Where GRF decides, and where it does not.
| Karar | Kimde olduğu |
|---|---|
| Universe mandate, mission admission, gate decisions and publication authorisation | GRF, within its instruments; see programme stewardship |
| Evidence, methods and the technical build | The Global Centre for Risk and Innovation (GCRI); GRF does not control technical conclusions |
| Contracting for the Consortium | GCRI Canada as lead contracting organisation; GRF has no contracting authority for it |
| Finance and insurance readiness questions | The Global Risks Alliance (GRA), never an approval or a transaction |
| Policy, operational and financial decisions | İlgili hükümet, işletmeci veya lisanslı kurum |
Where this page’s references lead.
Bu sayfanın karşılaştırıldığı kuruluşlar ve belgeler. Durumlar ve sürümler değişir; her bağlantı yayımlayan kuruluşa gider.
Sorular ve yanıtlar.
Can GRF tell us who should decide?
Bir sorumluluk haritası bağlayıcı mıdır?
Where is the method applied?
How do we start a mapping exercise?
Bu sayfadan kanıt katkısında bulunun.
Reports, Konsorsiyumun üç ayda bir yayımlanan yayınıdır. Bu konu hakkında bildikleriniz bir sonraki sayıda kanıt, vaka veya düzeltme olabilir; size atfedilir ve kendi çalışmanızsa CC BY 4.0 kapsamında yayımlanır.
- E-postaGeçit GW-GRFBu sayfadan gönderinKanıt, bir düzeltme, bir vaka, bir yöntem, bir inceleme, bir çeviri veya profil girdisi. Bu sayfayla etiketlenmiş olarak gelir; böylece sayfanın sahibi editör onu alır.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsGlobal Risks ForumSee every way to contributeThe contribution types, how each is reviewed, what credit you receive, the licence and what is never accepted.
Hiçbir zaman kişisel veri, hassas altyapı ayrıntısı veya paylaşma hakkınız olmayan hiçbir şey göndermeyin. Bir katkı kullanılmadan önce incelenir. Katkıyı göndermek yazarlık veya editoryal hak sağlamaz ve sponsorluk hiçbir zaman bir bulgu satın almaz.
Bir yönetişim sorusunu Forum'a getirin.
Bilgi ve başvurular bugün açıktır. Bir başvuru bir referans numarası alır ve bir sonraki adımı belirtir; başvurular, ödemeler, işlem kapasitesi tahsisleri ve kayıtlar yalnızca ekipleri, koşulları ve inceleme kapasiteleri mevcut olduğunda açılır.
Hukuki belgeler.
18 hukuki belgenin tümünü göster
Bu sitedeki haritalar, veriler ve şekiller bağlam ve genel bilgi amacıyla gösterilir. Tavsiye, tahmin ya da uyarı değildir; bilgilerin sınırları Sorumluluk Reddi ve Veri Bildirimleri'nde açıklanmıştır.