Most crisis failures are failures of authority, not knowledge: nobody knew who could decide, who to consult or who would answer for the result. The OECD Recommendation on the Governance of Critical Risks (2014) asks governments to name a lead for each critical risk. The Global Risks Forum (GRF) helps institutions make decision rights explicit before they are needed: mandate, responsible actor, delegation, gaps. GRF records the agreements. It never takes the decision.
حقوق و مسئولیتهای تصمیمگیری در هفت بخش.
- 01Four elementsWhat a decision-rights map records
- 02NotationFrom a RACI chart to a decision-rights record
- 03Workshop formatHow a mapping session runs
- 04The methodHow a responsibility map is built and tested
- 05Records and standardsWhy a common format matters
- 06GRF’s own decision rightsWhere GRF decides, and where it does not
- 07SourcesWhere this page’s references lead
What a decision-rights map records.
The source of authority
The law, instrument or charter that gives an institution its authority, and its limits.
Who decides and answers
The office or person who decides and is accountable for the decision.
Who acts for whom
چه چیزی، به چه کسی، تحت چه شرایطی تفویض شده و چگونه میتوان آن را پس گرفت.
Where authority is unclear
Decisions that fall between mandates, or that several institutions believe are theirs.
From a RACI chart to a decision-rights record.
Project managers use RACI charts to say who is responsible, accountable, consulted and informed. Public decisions need two more columns. One for the legal basis of the authority. One for the condition that moves a decision from one holder to another, such as a declared emergency or a threshold on a gauge. A decision-rights record therefore names the decision, the holder, the instrument, the trigger, the people who must be consulted and the route of appeal or review.
| حوزه | Example entry (illustrative) |
|---|---|
| تصمیم | Release water from a reservoir ahead of forecast inflow |
| دارنده | Dam operator under its licence |
| ابزار | Operating rules set under the licence issued by the water regulator |
| Trigger for escalation | Forecast exceeding a stated return period, at which point the basin authority directs |
| Must consult | Downstream municipalities, civil protection |
| بازبینی | Regulator’s post-event review |
نهاد چگونه اداره میشود.
Process explorer · Governance
نقش و محدودیتهای Forum
7 steps·4 stages·1 gate
حکمرانی
نقش و محدودیتهای Forum
Consortium · Governance · Councils · Dialogues · Programme year · Platforms · Standards · Reports · Take part · Universe year · Action Week · Handoffs · Programme states · The programme year · A national mission · Mission admission · Data and resources qualified · Build accepted for exercise · Action Week live operation · Stand-down and evidence sealed · Publication authorised · Correction and renewal · The Nexus cycle · National Nexus · Regional programmes · Working groups · Competence Cells and CERT · Joining as institution · Governance dialogues · Reports · Risk Academy · Finance readiness dossier · The Nexus Consortium · Twenty-seven phase cycle · Executable annual cycle · Complaint and appeal · Founding and institutional establishment · Consortium formation lifecycle · Constitutional amendment · Independent review and appeal · Correction and contestability · Registry entry · Body charter and council · Succession · Public interest and anti-capture · External authority hand-off · Funding · Public transparency · Gates G0 to G7 · Forming the annual agenda · NNC membership · Year-One leadership pathway · Public-authority interface and delegation · Annual Universe operating cycle · Participation campaign
انجمنی سوئیسی با هدف خیر عمومی و غیرانتفاعی که گفتوگو را رهبری میکند و متولی Universe است، بیآنکه مقرراتگذاری، تأمین مالی، تدارکات یا صدور گواهی کند.
01 شکل حقوقی
- 01انجمن سوئیسیآغاز · ارکان قانونیانجمنی سوئیسی بر پایهٔ قانون مدنی سوئیس، با نشانی منتشرشده در Zug.
02 مأموریت
- 02رهبری و گفتوگوگام · The Global Risks ForumGRF گفتوگوی نهادی را در سراسر Nexus Consortiums رهبری میکند.
- 03چهار تصمیم برنامهتصمیم · The Global Risks Forumمأموریت سالانه، پذیرش مأموریت اجرایی، تصمیمهای دروازه و مجوز انتشار.
03 هرگز
- 04هرگز مقرراتگذاری، تأمین مالی، تدارکات یا صدور گواهی نمیکنددروازه · The Global Risks Forumتصمیمهای سیاستی، عملیاتی و مالی با مرجع صلاحیتدار میماند.
04 با اینها کار میکند
- 05دفتر فنی The Global Centre for Risk and Innovation (GCRI)سابقه · GCRIGCRI دفتر فنی را اداره میکند. GRF برای GCRI Canada اختیار انعقاد قرارداد ندارد.
- 06آمادگی مالی Global Risks Alliance (GRA)سابقه · The Global Risks AllianceGRA سوابق دارای پیامد مالی را میخواند و یادداشتهای گزینهها را بازمیگرداند.
- 07وضعیتهای ثبتشدهبرآیند · The Global Risks ForumGRF در حال حاضر هیچ وضعیت بیرونی ثبت نکرده است. شوراهای جهانی و منطقهای در حال شکلگیریاند.
Global Risks Forum · جایگاه نهادیطرحی کلی از چگونگی اجرای کار؛ وضعیت هیچ تصمیم یا سابقهای را گزارش نمیکند.
How a mapping session runs.
- Each institution brings its own instruments: statutes, licences, emergency plans, delegations of authority.
- Facilitators walk one scenario hour by hour and ask at each step who can lawfully act and who believes they can.
- شکافها و همپوشانیها به محض ظاهرشدن ثبت میشوند، بدون انتساب تقصیر.
- The draft map returns to each institution’s legal adviser before anything is recorded as agreed.
- Disputed entries stay on the record as disputed, with each institution’s reading.
The method is shared with the Governance Nexus decision-rights page and applied in each specialist field; GRF holds no decision on the map it helps to draw.
How a responsibility map is built and tested.
- 01
Choose a scenario
رویدادی محتمل که از مرز نهادها میگذرد، مانند خاموشی طولانی برق که بیمارستانها و تأمین آب را تحت تأثیر قرار میدهد.
- 02
List the decisions
تصمیمهایی که سناریو مستلزم آنهاست، از هشدار تا بازیابی، همراه با آستانههای فعالسازی هر یک.
- 03
Assign each decision
For each decision, the mandate, the responsible actor, those who must be consulted and those who must be informed, as each institution states them.
- 04
Surface disagreements
Where institutions disagree or no one claims a decision, the record says so plainly. Silence is never recorded as agreement.
- 05
Test and revise
Exercise the map in Universe, where injects deliberately land in the gaps, and revise it with the institutions concerned.
A responsibility map records what institutions agree about their own authority. It does not create, transfer or interpret legal authority, and it is not legal advice.
Why a common format matters.
Responsibility maps work best when neighbouring institutions can read each other’s. Where institutions record decision rights in incompatible ways, GRF can propose a common record format under the Nexus Standards development process. The Global Standards Council decides; national councils may adopt or adapt it. With consent, maps tested in exercises can inform the Universe Annual Synthesis.
Where GRF decides, and where it does not.
| تصمیم | نزد چه کسی است |
|---|---|
| Universe mandate, mission admission, gate decisions and publication authorisation | GRF, within its instruments; see programme stewardship |
| شواهد، روشها و ساخت فنی | The Global Centre for Risk and Innovation (GCRI); GRF does not control technical conclusions |
| Contracting for the Consortium | GCRI Canada as lead contracting organisation; GRF has no contracting authority for it |
| Finance and insurance readiness questions | The Global Risks Alliance (GRA), never an approval or a transaction |
| Policy, operational and financial decisions | دولت، بهرهبردار یا نهاد دارای پروانهٔ ذیربط |
Where this page’s references lead.
نهادها و اسنادی که این صفحه در برابر آنها خوانده میشود. وضعیت و ویراستها تغییر میکنند؛ هر پیوند به نهاد صادرکننده میرود.
پرسش و پاسخ.
Can GRF tell us who should decide?
Is a responsibility map binding?
Where is the method applied?
How do we start a mapping exercise?
از همین صفحه شواهد بیفزایید.
Reports نشریهٔ فصلی کنسرسیوم است. آنچه دربارهٔ این موضوع میدانید میتواند در ویراست بعدی به شواهد، یک مورد یا یک اصلاح تبدیل شود، به نام شما ثبت شود و در صورتی که کار خود شما باشد تحت CC BY 4.0 منتشر شود.
- EmailGateway GW-GRFSend it from this pageEvidence, a correction, a case, a method, a review, a translation or profile input. It arrives tagged with this page, so the editor who owns it receives it.
- Zenodoسپردهٔ بازآن را سپرده و به جامعه ارسال کنیدسابقهٔ خود را با شناسهٔ ORCID iD خود در Zenodo منتشر کنید و سپس آن را در همانجا به جامعهٔ Reports ارسال کنید. متصدیان آن را داوری میکنند؛ DOI از آنِ شما میماند.
- گزارشهاGlobal Risks Forumهمهٔ راههای مشارکت را ببینیدانواع مشارکت، نحوهٔ بررسی هر یک، اعتباری که دریافت میکنید، مجوز و آنچه هرگز پذیرفته نمیشود.
هرگز دادههای شخصی، جزئیات حساس زیرساختی یا چیزی را که حق تسهیم آن را ندارید نفرستید. مشارکت پیش از استفاده بازبینی میشود؛ ارسال آن هیچ حق تألیف یا ویراستاری ایجاد نمیکند و حمایت مالی هرگز یافتهای را نمیخرد.
پرسش حکمرانی خود را نزد Forum بیاورید.
اطلاعات و پرسشها از امروز باز است. هر پرسش شمارهٔ مرجعی میگیرد و گام بعد را نام میبرد؛ درخواستها، پرداختها، تخصیص توان رایانشی و ثبتنامها تنها زمانی باز میشوند که تیم، شرایط و ظرفیت بررسی آنها فراهم باشد.
اسناد حقوقی.
نمایش هر 18 سند حقوقی
نقشهها، دادهها و شکلهای این سایت برای زمینه و اطلاعات عمومی نشان داده میشوند. آنها توصیه، پیشبینی یا هشدار نیستند؛ حدود اطلاعات در سلب مسئولیتها و اطلاعیههای داده بیان شده است.