Deep uncertainty describes situations where experts and stakeholders cannot agree on the models that link actions to outcomes, the probability of key future conditions, or how to value the results. Treating such conditions as if a single probability were known produces fragile decisions. This page sets out the methods institutions use when probabilities are contested: robustness, adaptive pathways and monitored triggers, and the mandates that must accept an explicit plan for changing course.

01In brief

The short answer.

Deep uncertainty describes situations where experts and stakeholders cannot agree on the models linking actions to outcomes, the probabilities of key future conditions or how to value results. Decision making under deep uncertainty seeks options that perform acceptably across many futures, and plans that adapt when signposts reach pre-agreed triggers.

02Geography

Hazards and exposure in the Arctic.

For deep uncertainty, in GRF's situational-awareness reading, the map opens on population density, flood water and rain with relief in 3D and clouds now from NASA GIBS, framed on the Arctic; every other NASA layer, live feed and forecast waits in the layer list.

The interactive map needs JavaScript; the layer list and sources are below.

Layers 3

Hazards and exposure, for this page

Latest available

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © OpenStreetMap contributors (ODbL) · Natural Earth

Loading the latest NASA imagery.

Drag to move. Ctrl or ⌘ and scroll, pinch or the buttons to zoom; hover for the values under the pointer; reset returns to the region.

For deep uncertainty, in GRF's situational-awareness reading, the map opens on population density, flood water and rain with relief in 3D and clouds now from NASA GIBS, framed on the Arctic; every other NASA layer, live feed and forecast waits in the layer list.Satellite and model products as NASA publishes them, each with its own date; indicators, not assessments of any place; claim ceiling INTEGRATED.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · GDACS · NOAA GOES-East ABI GeoColorSources and licences

  • We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). CC BY 4.0
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • GPM IMERG precipitation, NASA Precipitation Processing System; distributed by the NASA Goddard Earth Sciences Data and Information Services Center (GES DISC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • GHRSST Level 4 MUR analyses, NASA Jet Propulsion Laboratory; distributed by the NASA Physical Oceanography DAAC (PO.DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • Made with Natural Earth. Free vector and raster map data @ naturalearthdata.com. Public domain
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into H3 cells where shown (modified). NASA open data
  • Context on the globe and flat map: coastlines, boundaries, roads and place names from NASA GIBS reference layers (OpenStreetMap data, ODbL, © OpenStreetMap contributors); Blue Marble imagery as an optional base; 3D terrain and the elevation read-out from the ASTER GDEM elevation colour index (5 m to 200 m classes, exaggerated for legibility). Boundaries are drawn as published and imply no position on any territory.
  • Globe: MapLibre GL JS 6.9.1, BSD-3-Clause, © MapLibre contributors.
  • Live: NASA EONET Events are indicative, not official warnings.
  • Live: GDACS (EC JRC / UN OCHA) Events are indicative, not official warnings.
  • Live: NOAA GOES-East ABI GeoColor (CIRA). We acknowledge the use of imagery provided by services from NASA's Global Imagery Browse Services (GIBS), part of NASA's Earth Science Data and Information System (ESDIS).
  • Optional layers (35 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Layers and dates

  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Flood water, 3-day composite: VIIRS Global Flood Product, NASA LANCE · 14 Oct 2026
  • Precipitation rate, daily mean: GPM IMERG, NASA GES DISC · 12 Oct 2026
  • Land surface temperature, day, 8-day composite: VIIRS NOAA-20 Level 3, 8-day, NASA LANCE · 14 Sep 2026
  • Sea surface temperature anomaly: GHRSST MUR25, NASA JPL PO.DAAC · 12 Oct 2026
  • Night-time lights, daily: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Oct 2026

03Console

Policy wind tunnel, in outline.

The working screen behind this subject: its structure, terms and states. Names are placeholders and values illustrative.

Policy wind tunnel

Deep uncertainty · Scenario set B · Policy: POL-19

Fails in one scenarioGRF · Foresight Nexus

Policy performance by scenario

0 fails to 100 robust

Higher is more robust. Placeholder scores.

Signposts to monitor

  1. S-1Trade restrictions on inputstriggers adaptation 2quarterly
  2. S-2Cost of sensorstriggers scale-upannual
Policy wind tunnel: the screen's structure, terms and states for Deep uncertainty.Placeholder names and illustrative values; a design, not a record or a live system.
04The question

Deep uncertainty: how the risk develops.

Methods when probabilities are contested. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mechanism

Contested probabilities

Long horizons, novel conditions and reflexive human behaviour leave no reliable frequency record. Different credible models give different answers, and choosing one hides the disagreement that decision-makers need to see.

Mechanism

Robustness over optimality

Under deep uncertainty the question shifts from which option is best in an expected future to which option performs acceptably across many futures, and where it fails. Vulnerabilities, not predictions, become the focus.

Mechanism

Adaptive pathways and tipping points

Plans are sequenced so that early actions keep later options open. Each pathway has an adaptation tipping point, the condition beyond which it no longer meets its objective, and a lead time to switch.

Mechanism

Signposts, triggers and commitment

Adaptive plans need monitored signposts, pre-agreed triggers and an institution with authority to act on them. Without that commitment an adaptive plan becomes a static plan with a review clause.

05Key terms

Terms used on this page.

Each term as this page uses it. Where a standard-setting body defines the term, the wording follows that body.

TermDefinition
RegretThe difference between an option's outcome in a given future and the best outcome available in that future.
Adaptation tipping pointThe point at which a strategy no longer meets its objectives as conditions change.
Dynamic adaptive policy pathwaysA method that maps sequences of actions and the tipping points at which to switch between them.
06Indicators

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeLabel
Spread of outcomes across a scenario ensembleunits of the decision objectiveper assessmentModel ensemblesMODELLED
Options meeting performance thresholds across futuresshare of sampled futuresper analysisRobustness analysisMODELLED
Regret of the preferred optionunits of the decision objectiveper analysisRegret analysis across scenariosMODELLED
Plans with stated adaptation tipping pointscount of plansper planning cyclePublished plansOFFICIAL
Signposts monitored with pre-agreed triggerscount of signpostsquarterlyMonitoring registerREPORTED
Spread of elicited expert judgementrange between elicited quantilesper elicitationStructured expert elicitationESTIMATED
Structural diversity of the model ensemblecount of independent model structuresper assessmentModel intercomparison recordsDECLARED
07Canvas

From sources to decisions.

The topic as a computational graph: named sources feed the methods, an evidence review gates the outputs, and the decisions stay with the authorities that hold them.

Pipeline canvas · Deep uncertainty as a run graphDesign, not a record
Deep uncertainty: from horizon scanning to wind-tunnelled policySignals from horizon scanning are clustered into drivers; the most uncertain and impactful define scenario axes; narratives are written; policies are wind-tunnelled against each scenario and signposts monitored. Design of the process, not a record of a run.

Fig. 02Nodes carry their type, two metric rows and a state; connectors show what feeds what; dashed frames name the owners; the timeline is the cadence. Design of the pipeline, not a record of a run.

08Sources

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

SourceWhat it givesLicence class
IPCC Sixth Assessment Report, Working Groups I and IIAssessed ranges, calibrated confidence language and storylines for low-likelihood, high-impact outcomesIPCC terms, free with attribution
Thames Estuary 2100 Plan (Environment Agency)Adaptive pathways for tidal flood risk with monitored indicators and decision pointsOpen Government Licence
Dutch Delta Programme (Deltaprogramma)Adaptive delta management, decision points and annual programme reportingPublic records, Dutch government terms
NGFS climate scenariosA structured set of transition and physical risk pathways for financial supervisorsFree with attribution
Society for Decision Making under Deep UncertaintyPublished methods, case studies and open tools for robust and adaptive decisionsTerms per publication, many open access
CMIP model intercomparison archives (WCRP)Multi-model climate outputs that show where model structure drives disagreementFree and open, CC BY 4.0 for most datasets
09Decisions

Who decides, and what the evidence serves.

Foresight Nexus prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Who decidesThe questionEvidence this page serves
Finance ministries and treasuriesWhether appraisal of long-lived public investment should test robustness rather than a single central caseRegret and robustness results beside the central appraisal, with the futures in which each option fails
Infrastructure and flood risk authoritiesWhen to commit to the next stage of an adaptive planSignpost status against triggers, the lead time to switch, and the tipping point of the current pathway
Central banks and financial supervisorsHow to set supervisory expectations when climate and transition paths are contestedScenario ranges with model and assumption differences shown, not averaged away
Environment and climate ministriesWhich adaptation measures are low-regret now and which should wait for more informationRobustness across ensembles and the value of waiting, stated with its assumptions

Outputs this topic produces

  • Vulnerability maps that show where options fail across futures
  • Adaptive pathway diagrams with tipping points and switching lead times
  • Signpost and trigger registers for plan owners
  • Method notes on when probabilities are and are not defensible
10Core questions

What practitioners ask.

  • When is uncertainty deep, and when can it be represented by probabilities?
  • How can decisions be made robust across many possible futures?
  • How should decisions be designed to adapt as the future unfolds?
  • How can disagreement among experts be represented honestly?
  • How should decision-makers communicate choices made under deep uncertainty?
11Mechanisms

Drivers and dynamics.

Economists have long distinguished risk, where probabilities are known, from uncertainty, where they are not. Under deep uncertainty, optimizing for a single best estimate can produce strategies that fail badly if the estimate is wrong. Decision science has therefore developed approaches that seek robustness, performing acceptably across many futures, and adaptiveness, changing course as new information arrives.

Methods such as robust decision making, dynamic adaptive policy pathways and exploratory modelling run many plausible futures through models to identify the conditions under which strategies fail. Decisions are then designed with signposts and triggers: observable indicators that would prompt a change of course. These approaches have been used in water management, flood protection and long-term infrastructure planning.

12Methods and limits

How it is approached.

  1. 01

    Exploratory modelling

    Running models across many assumptions to map where strategies succeed or fail, using complex systems and agent-based modelling.

  2. 02

    Robustness analysis

    Comparing strategies by their performance across futures, drawing on decision analysis under uncertainty.

  3. 03

    Adaptive pathways

    Sequencing actions with signposts and triggers so that plans can change as conditions do.

  4. 04

    Limits

    These methods need significant analytic capacity, depend on the range of futures considered, and still require value judgements about acceptable outcomes.

13Methods

How it is studied, and what the methods cannot say.

  1. Decision analysis under uncertaintyRobust decision making · Dynamic adaptive policy pathways · Structured expert elicitationApplied here
  2. Scenario design and stress testingExploratory scenario development · Policy wind-tunnellingApplied here
  3. Complex systems and agent-based modellingSystems mapping of drivers · Agent-based exploration of social changeApplied here
  4. Forecasting and time-series analysisAggregated judgemental forecasting · Probabilistic population projectionsApplied here
14Questions

Questions and answers.

When is uncertainty deep rather than ordinary?
When credible experts cannot agree on the system model, the likelihood of key conditions, or how outcomes should be valued. Ordinary uncertainty can be expressed as an agreed probability distribution; deep uncertainty cannot, without hiding a disagreement.
Does deep uncertainty mean doing nothing?
No. It favours actions that perform acceptably across many futures, that keep options open, and that come with monitored triggers for changing course. Waiting is itself an option, with its own risks.
What is an adaptation tipping point?
The condition at which a policy or plan stops meeting its objective, for example a sea level a defence can no longer hold. It is defined by the objective, not by a date, and monitoring shows how close it is.
Is deep uncertainty an excuse not to act?
No. Robust and adaptive methods are designed to support action when waiting for certainty would be costly.
What is a signpost?
An observable indicator that, if it changes, would prompt a planned change of strategy.
Do these methods replace forecasts?
No. Forecasts remain useful where they are reliable; deep uncertainty methods apply where they are not.
Who reviews coverage of this topic?
Published analysis is designed to be reviewed by a named subject reviewer, to cite its references and to include independent specialist voices. Where specialists disagree, the disagreement is reported rather than resolved by omission.
Foresight Nexus

Bring your expertise to this field.

The current service level is R0: information and enquiries. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.

Have questions?