GRF · Diplomacy Nexus
دیپلۆماسیی زانستی
Science diplomacy is a chapter of Diplomacy Nexus: a specialist sub-community with its own group, editor and research agenda. Science diplomacy is a fundamental part of existing Diplomacy Nexus.
ئەو ڕیزبەندییەی شتەکان تێیدا ڕوودەدەن.
- 01پرسیارئەولەویەتی نیشتمانی، ناوچەیی یان دامەزراوەیی
- 02بەڵگەبنەمای STEM بۆ پلاتفۆرمەکە
- 03BuildFoundry
- 04ڕێکخستنئەکۆسیستەمی Nexus
- 05تاقیکردنەوەUniverse (ماڵپەڕی سەربەخۆ)
- 06بڵاوکردنەوەڕاپۆرتەکان
- 07بڕیارداندەسەڵات و دامەزراوە تایبەتمەندەکان، لە ڕێگەی NXS-RLS (بەشداربووان، ڕێککەوتن و دەستبەدەستکردن)
- 08نوێکردنەوەڕاستکردنەوەکان و ئەجێندای ساڵانەی داهاتوو
What Science diplomacy covers.
- 01
ئەندامان
Specialists who work on the chapter’s questions.
- 02
گرووپ
A moderated group, opened when its hosting and terms are in place.
- 03
Editor
A named editor responsible for the chapter’s pages.
- 04
Research agenda
Questions the chapter works on, starting from its cornerstone topic.
Science cooperation that has outlasted politics.
- CERN’s founding convention, an early model of science for diplomacy.
- SESAME, a synchrotron light source in the Middle East shared by regional members.
- The IPCC and IPBES, where governments approve summaries of science.
- The International Science Council’s work on science diplomacy and science advice.
See science diplomacy for the topic depth.
چۆن پرۆسەکە کار دەکات.
Process explorer · Process
Science diplomacy: N-1 contingency assessment
5 steps·3 stages
پرۆسە
Science diplomacy: N-1 contingency assessment
The EU System Operation Guideline names contingency lists, analysis and handling; Nexus describes no N-1 process, so only these steps are shown.
01 Inputs
- 01Network state and modelRecord · The system operatorThe analysis starts from the operating state and network model of the system operator. Their content is set by that operator.
02 هەڵسەنگاندن
- 02Contingency listRecord · The system operatorThe System Operation Guideline lists contingency lists as a named step. The list contents are set by the operator and are not stated here.
- 03Contingency analysisModel · The system operatorThe System Operation Guideline lists contingency analysis as a named step. The method, tools and limits are not stated here.
- 04Contingency handlingStep · The system operatorThe System Operation Guideline lists contingency handling as a named step. What it requires is not stated here.
03 Operator
- 05Operators decide; the programme controls no gridActor · The operatorWater and power operators decide any real-world change to their systems. Exercises give the programme no control of operational technology.
A national mission · Decision rightsOutline of an externally published process, not a Nexus process and not a record of operation. The published Nexus documents describe no N-1 assessment. No programme runs one and every programme is at service level R0.
Take part.
Write to the contact form. The acknowledgement gives a reference and names the next step.
پرسیار و وەڵام.
Can a chapter become its own platform?
پرسیارێکی حوکمڕانی بهێنە بۆ فۆرومەکە.
زانیاری و پرسیار ئەمڕۆ کراوەن. پرسیارێک ژمارەی ئاماژەی پێدەدرێت و هەنگاوی دواتر دیاری دەکات؛ داواکاری، پارەدان، تەرخانکردنی کۆمپیوتەر و تۆمارکردن تەنیا کاتێک دەکرێنەوە کە تیم، مەرج و توانای پێداچوونەوەیان هەبێت.
بەڵگەنامە یاساییەکان.
پیشاندانی هەموو 18 بەڵگەنامە یاساییەکە
نەخشە، داتا و وێنەکانی ئەم ماڵپەڕە بۆ ناوەڕۆک و زانیاریی گشتی پیشان دراون. ئامۆژگاری، پێشبینی یان ئاگادارکردنەوە نین؛ سنوورەکانی زانیارییەکە لە ڕەتکردنەوەی بەرپرسیارێتی و ئاگاداریی داتادا دەستنیشان کراون.