- Reports
- GRF Public Deliberation
- Baseline Edition 2026
Public Deliberation: East Asia 2026
What convenings, councils and the public concluded: positions, dissent and open questions. This edition is in preparation: its frame is set and shared with the other five desks, and Global Risks Forum writes its chapters from its own mandate. Nothing on these pages is a finding yet.
- Desk
- GRF Public Deliberation
- Publisher of record
- The Global Risks Forum (GRF)
- Collection
- Reports Collection 2026
- Status
- In preparation; not released
GRF Public Deliberation
East Asia 2026
What convenings, councils and the public concluded: positions, dissent and open questions.
01 · Contents
Eight chapters in the shared frame.
The same eight-chapter frame on every desk, so a reader can move across desks and the Collection can align them chapter by chapter. Each chapter title comes from this desk’s mandate.
- 1
Chapter 1. What was asked, and by whom
The questions put to the convenings of the cycle, and the bodies and roles that put them.
Frame: The question · In preparation
- 2
Chapter 2. Conclusions and dissent
What the convenings concluded, with the dissent recorded beside each conclusion.
Frame: Findings · In preparation
- 3
Chapter 3. Positions by sector
The positions stated by sector and by type of body, attributed to those who hold them.
Frame: By system and sector · In preparation
- 4
The concerns raised by the public and by civil society, as they were raised.
Frame: Risk and capability · In preparation
- 5
Chapter 5. Deliberated scenarios
The scenarios the convenings discussed, and what participants said would change their view.
Frame: Scenario · In preparation
- 6
Chapter 6. Readings from the other desks
Readings from the other desks: cross-references to their editions for the same scope, not copies of them.
Frame: Readings · Seeded from the Global Centre for Risk and Innovation (GCRI) edition
- 7
Chapter 7. Commitments asked for
The commitments participants asked of institutions, recorded as requests, not as agreements.
Frame: Agenda · In preparation
- 8
The record of each session: agenda, participation by role, materials and outcome.
Frame: In depth · In preparation
Annex A (methodology), Annex B (data), Annex C (references and record), the complete edition for print and the citation forms are added at release, in the same form as every edition.
02 · Now
What exists today.
The evidence on East Asia sits today in the GCRI Systems Evidence edition, a draft in stewardship review. This edition cross-references it chapter by chapter and does not copy it.
GRF reading
Public Meaning
Printed in the GCRI edition and seeded here in chapter 6, attributed to this desk.
Subject collection
East Asia 2026
Every desk edition for this subject, compiled by GCRI Canada for the Collection.
03 · This desk
What GRF Public Deliberation reports on East Asia.
The Forum reads an edition for public meaning: what a finding means for governance, diplomacy and trust, and how it can be said without overclaiming.
The Forum deposits session records, positions and the open questions of its series, with the dissent attached to each conclusion.
If you took part in a convening, send the record and say which body held it. The Forum will ask each participant before it names them.
04 · Six desks
Every desk’s edition for East Asia.
| Desk | Edition | State | Identifier |
|---|---|---|---|
| GRF Public Deliberation | Public Deliberation: East Asia 2026 | In preparation | NR-GRF-REG-EAS-2026-BASELINE (reserved) |
| GCRI Systems Evidence | Systems Evidence: East Asia 2026 | Drafted, in stewardship review | NR-REGIONAL-EAS-2026-BASELINE-v1.0.0 |
| GRA Capital Readiness | Outside this desk’s remit | Not in remit | |
| Standards Progress | Outside this desk’s remit | Not in remit | |
| Academy Capability | Outside this desk’s remit | Not in remit | |
| Index Measurement | Measurement: East Asia 2026 | In preparation | NR-GRX-REG-EAS-2026-BASELINE (reserved) |
05 · Downloads
The print edition of the evidence on East Asia.
This desk’s edition is in preparation and has no print of its own until release. The evidence it cross-references is in the GCRI Systems Evidence edition for East Asia: its designed PDF (A4 or US Letter), its data and its citation files are here, from this site’s library.
Draft, not yet releasedThe print and files of the GCRI edition this desk’s edition cross-references. Review copies until release; the DOI is issued at deposit.
Print
PDF, A4
The GCRI Systems Evidence print edition for this subject, A4: cover, imprint, contents with page numbers, every chapter and annex.
PDF113 pages951 KBTagged, with bookmarks
SHA-256
c6a8156d7890ada41b91c03c4f857741aa8949571c25c2accc6ed64fb5b20a2fPDF, US Letter
The GCRI Systems Evidence print edition for this subject, US Letter: cover, imprint, contents with page numbers, every chapter and annex.
PDF119 pages962 KBTagged, with bookmarks
SHA-256
084bb8cac485081838fd5bd3d7607fde42db322aee812ed63b2612a08af796e8
Web edition
Complete edition, one page
Every chapter and annex at one address, with running heads when printed from the browser
HTML
Edition home
Key messages, contents, citation and the readings of each desk
HTML
Data bundle
Indicators, CSV
20 indicators with unit, year, status and source
NR-REGIONAL-EAS-2026-BASELINE-indicators.csv1 KB
SHA-256
63af0abe1e563d10a6f62924fd324121cdb42f7084e62a564b9beaa39d34d227Indicators, JSON
The same indicators with the edition’s identity and licence
NR-REGIONAL-EAS-2026-BASELINE-indicators.json3 KB
SHA-256
a14c884a4cb9d042970655d1824452af1219b74159061d7180868003436fda01Findings, CSV
12 findings with status, evidence-quality level and references
NR-REGIONAL-EAS-2026-BASELINE-findings.csv3 KB
SHA-256
ea2d451244b84ade10fbb0c9c9e2f73396486e336860317fdec111e634e9c703
Citation files
Citation, BibTeX
For LaTeX and reference managers
NR-REGIONAL-EAS-2026-BASELINE.bib1 KB
SHA-256
12758a5b8c104f8818883a86a5a1c4b42aec69ba951ea9143f756d1b7b9e66c9Citation, RIS
For Zotero, EndNote and Mendeley
NR-REGIONAL-EAS-2026-BASELINE.ris1 KB
SHA-256
9f7709f17b233cc4d3bd72ab3696653ed05169cf9ffea1051ee7462cafd21971Citation, CITATION.cff
Citation File Format 1.2.0, for GitHub, Zenodo and software catalogues
NR-REGIONAL-EAS-2026-BASELINE.cff1 KB
SHA-256
755781feb65fa48cc921c55c446202411876d10689c247ac038d3cc585b339e7
Check a file with its SHA-256: shasum -a 256 <file> (macOS, Linux) or Get-FileHash <file> (Windows). Text, tables and figures by Nexus: CC BY 4.0; each source keeps its own licence.
06 · Cite
Cite this report.
- Reserved identifier
- NR-GRF-REG-EAS-2026-BASELINE
- Part of
- NR-COL-2026-BASELINE
- DOI
- Not yet deposited
- Until release
- Cite the GCRI Systems Evidence edition, East Asia 2026, which prints this desk’s reading in its chapter 6. Cite the GCRI edition
Contribute to Public Deliberation: East Asia 2026.
Reports is the Consortium’s quarterly publication, written by six desks. This page sits with the GRF Public Deliberation desk. What you know about this subject can become evidence, a case or a correction in the next edition, credited to you and published under CC BY 4.0 where it is your own work. Sent to the wrong desk, it is forwarded, not refused.
- EmailGateway GW-GRFSend it from this pageEvidence, a correction, a case, a method, a review, a translation or profile input. It arrives tagged with this page, so the editor who owns it receives it.
- ZenodoOpen depositDeposit it and submit to the communityPublish your own record on Zenodo with your ORCID iD, then submit it to the Reports community there. Curators review it; the DOI stays yours.
- ReportsGlobal Risks ForumSee which desk takes what you haveThe routing table opens the contribution page: what you have, the desk that takes it, how each contribution is reviewed and credited, and the licence.
Never send personal data, sensitive infrastructure detail or anything you have no right to share. A contribution is reviewed before use; sending it confers no authorship or editorial rights, and sponsorship never buys a finding.
Reports · GRF Public Deliberation
Bring evidence to this edition.
The record of deliberation: what a convening, council, dialogue or working group was asked, what it concluded, where participants disagreed and which questions stayed open.
- NR-GRF-REG-EAS-2026-BASELINE
- CC BY 4.0
- In preparation
CC BY 4.0 Free to read. Text and figures: CC BY 4.0. Data: CC0 1.0. Authors keep copyright. Published by GCRI Canada.
What you can do from this page.
- ReaderNew to the reports? A short guide to reading an edition.Start here
- ContributorYour contributions to this edition and the reviews open on it are listed below the edition.Contribute
- ReviewerReview for this desk; verified reviews are credited.Become a reviewer
- Editor, steward or boardQueues, decisions and production are in the workspace.My workspace
This edition
Contributions and reviews on REG-EAS
- Open contributions to this edition
- 0
- Reviews open on this edition
- 0
Open your account on this site to see your own contributions to this edition and any review invited from you.
