Skip to content

GRF · Universe at GRF

Ushiriki wa kitaifa na kikanda

Missions come from national and regional programmes. A programme proposes one with an accountable owner and a question worth testing, such as whether a heat plan holds when power, water and hospitals are stressed at once. The technical office of The Global Centre for Risk and Innovation (GCRI) qualifies data, methods and resources. The Global Risks Forum (GRF) records admission at gate G1, with reasons. Countries may decline or withdraw at any point.

01Sequence

The order things happen in.

  1. 01QuestionNational, regional or institutional priority
  2. 02EvidenceSTEM foundation of the platform
  3. 03BuildFoundry
  4. 04OrganiseNexus ecosystem
  5. 05TestUniverse (independent site)
  6. 06ChapishaRipoti
  7. 07DecideCompetent authorities and institutions, through NXS-RLS (participants, agreements and handoffs)
  8. 08RenewCorrections and the next annual agenda
02From proposal to test

Four steps for a mission.

  1. 01

    Propose

    A national or regional programme proposes a mission with an accountable owner, a question worth testing and the institutions that will act on the result.

  2. 02

    Qualify

    GCRI’s technical office qualifies data, methods and resources. Contributed infrastructure moves through separate states, from offered to accepted.

  3. 03

    Admit

    GRF records an admission decision at gate G1, with its reasons, against the published criteria.

  4. 04

    Build, test and publish

    Admitted missions pass through the build month, the action week and review. Results return to the national programme that proposed them.

03Geography

People and hazards worldwide.

Population density, night lights and flood water across the world, from NASA GIBS. Each layer carries its own date.

Ramani shirikishi inahitaji JavaScript. Orodha ya tabaka na vyanzo imetolewa hapa chini.

Tabaka 3

People and hazards, for this page

Kuhusu tabaka hili
Ushahidi
Imekadiriwa
Chanzo
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Chuo Kikuu cha Columbia))
Mtoaji
NASA SEDAC (CIESIN, Chuo Kikuu cha Columbia)
Leseni
CC BY 4.0
Tarehe ya data
null; Makadirio yanayotokana na sensa, isiyobadilika (2020)
Ubora wa picha
gridi ya takriban kilomita 1
Kutokuwa na uhakika
Makadirio yanayotokana na sensa ya watu kwa kila kilomita ya mraba mwaka 2020, yanayoonyeshwa kama muktadha wa mfiduo; si hesabu ya watu walioathiriwa na janga lolote.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana
Chanzo
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Mtoaji
NASA LAADS DAAC
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Mng'ao wa setilaiti, uliorekebishwa kwa mwanga wa mwezi na angahewa
Ya hivi karibuni wakati wa ujenzi
2026-10-12
Ubora wa picha
gridi ya takriban mita 500
Kutokuwa na uhakika
Mng'ao wa usiku kutoka setilaiti kwa tarehe iliyoonyeshwa; taa ni kiashiria cha matumizi na kukatika kwa umeme, si kipimo cha usambazaji au upatikanaji.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana (mawingu huacha mapengo)
Chanzo
Bidhaa ya Mafuriko ya Kimataifa ya VIIRS (NASA LANCE)
Mtoaji
NASA LANCE
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Ugunduzi wa setilaiti; mawingu huacha mapengo
Ya hivi karibuni wakati wa ujenzi
2026-10-14
Ubora wa picha
gridi ya takriban mita 250
Kutokuwa na uhakika
Ugunduzi wa setilaiti; mawingu huacha mapengo. Raster ya setilaiti au modeli kama mtoaji anavyoichapisha. Mawingu, mapengo ya mkondo wa setilaiti na makosa ya upimaji huacha mapengo na kelele; thamani ni viashiria, si vipimo mahali fulani.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana (mawingu na muda wa kupita kwa setilaiti huacha mapengo)
Chanzo
VIIRS NOAA-20 mita 375 (FIRMS) (NASA LANCE FIRMS)
Mtoaji
NASA LANCE FIRMS
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Ugunduzi wa setilaiti; mawingu na muda wa kupita kwa setilaiti huacha mapengo
Ya hivi karibuni wakati wa ujenzi
2026-10-13
Ubora wa picha
gridi ya takriban mita 500
Kutokuwa na uhakika
Ugunduzi wa setilaiti wa maeneo ya joto kwa siku iliyoonyeshwa, ikiwemo miale ya gesi na joto la viwandani; si moto uliothibitishwa, ripoti ya tukio au onyo.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana
Chanzo
Mwangaza uliorekebishwa wa VIIRS NOAA-20 (NASA LANCE)
Mtoaji
NASA LANCE
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Picha ya satelaiti
Ya hivi karibuni wakati wa ujenzi
2026-10-14
Ubora wa picha
gridi ya takriban mita 250
Kutokuwa na uhakika
Picha ya satelaiti. Raster ya satelaiti au ya muundo kama mtoa huduma anavyoichapisha. Mawingu, mapengo ya ukanda na makosa ya upatikanaji huacha mapengo na kelele; thamani ni viashiria, si vipimo mahali fulani.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov

Ya karibuni zaidi inayopatikana

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © wachangiaji wa OpenStreetMap (ODbL) · Natural Earth

Inapakia picha za hivi karibuni za NASA.

Buruta ili kusogeza. Ctrl au ⌘ na usogeze, bana au tumia vitufe ili kukuza; elea juu ili kuona thamani zilizo chini ya kiashiria; weka upya hurudisha kwenye eneo.

People and hazards, framed on the world.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Takwimu: NASA GIBS · ASTER GDEM · Blue Marble · © wachangiaji wa OpenStreetMap · Natural Earth · NASA EONET · Utafiti wa Jiolojia wa MarekaniVyanzo na leseni

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • NASA Fire Information for Resource Management System (FIRMS), VIIRS 375 m active fire product, NASA LANCE; vector tiles via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Imetengenezwa kwa Natural Earth. Data huria za ramani za vekta na rasta @ naturalearthdata.com. Kikoa cha umma
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Muktadha kwenye tufe na ramani bapa: mwambao, mipaka, barabara na majina ya mahali kutoka tabaka za marejeo za NASA GIBS (data ya OpenStreetMap, ODbL, © wachangiaji wa OpenStreetMap); picha za Blue Marble kama msingi wa hiari; ardhi ya 3D na usomaji wa mwinuko kutoka faharasa ya rangi ya mwinuko ya ASTER GDEM (madaraja ya 5 m hadi 200 m, yaliyokuzwa ili yasomeke). Mipaka imechorwa kama ilivyochapishwa na haimaanishi msimamo wowote kuhusu eneo lolote.
  • Matukio ya moja kwa moja: NASA Earth Observatory Natural Event Tracker (EONET); matukio ni ya kuashiria tu na yanabaki na viungo vya vyanzo vyao asili.
  • Moja kwa moja: NASA EONET. Matukio ni ya kuashiria tu, si tahadhari rasmi za mamlaka.
  • Context: © OpenStreetMap contributors (ODbL), via NASA GIBS. © OpenStreetMap contributors (ODbL), rendered by NASA GIBS.
  • Moja kwa moja: U.S. Geological Survey. Matukio ni ya kuashiria tu, si tahadhari rasmi za mamlaka.
  • NASA GIBS: Tunatambua matumizi ya picha zinazotolewa na huduma za Global Imagery Browse Services (GIBS) za NASA, sehemu ya Earth Science Data and Information System (ESDIS) ya NASA.
  • Optional layers (5 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Tabaka na tarehe

  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Taa za usiku, kila siku: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Okt 2026
  • Maji ya mafuriko, mchanganyiko wa siku 3: VIIRS Global Flood Product, NASA LANCE · 14 Okt 2026
  • Moto unaowaka na hitilafu za joto: VIIRS NOAA-20 375 m (FIRMS), NASA LANCE FIRMS · 13 Okt 2026
  • Rangi halisi: VIIRS NOAA-20 mng'ao uliosahihishwa, NASA LANCE · 13 Okt 2026

04A mission proposal

What a national proposal contains.

NyanjaExample (illustrative)
SwaliCan the coastal province and the national grid operator coordinate load shedding during a storm surge?
Accountable ownerThe provincial civil protection authority
Institutions to exerciseProvincial authority, grid operator, port authority, hospital network
Arrangement under testDraft escalation protocol, version stated
Data contributedAsset locations under a stated licence
Publication consentSummary only
05Mchakato

How the process runs.

Process explorer · Process

National and regional participation: Programme through eight gates

Hatua 11Hatua 4Malango 8

Mchakato

National and regional participation: Programme through eight gates

GRF records eight yearly gates, each a programme decision; a gate not passed stops its work, and the competent authority decides outside.

  1. 01 Robo ya 1 · Mipango

    1. 01G0 · Annual programme authorisedGate · The Global Risks ForumGRF authorises the annual mandate. It never sets a national agenda.
    2. 03Route the candidate mission to standardsStep · Nexus StandardsNexus Standards routes each candidate mission to the standards and profiles that apply.
  2. 02 Robo ya 2 · Utayari na ujenzi

    1. 04G1 · Missions admittedGate · The Global Risks ForumGRF admits missions with reasons recorded. It cannot admit a mission without an accountable owner.
    2. 05G2 · Data and resources qualifiedGate · The Global Risks ForumReadiness preparation closes when data, people and resources are qualified.
    3. 06G3 · Build accepted for exerciseGate · The Global Risks ForumGRF records whether the build is accepted for exercise. A gate not passed stops the work it governs.
  3. 03 Q3 · Action Week

    1. 07G4 · Controlled live operation authorisedGate · The Global Risks ForumGRF authorises controlled live operation for Action Week.
    2. 08G5 · Evidence sealed and stand-down recordedGate · The Global Risks ForumThe evidence is sealed with its provenance and the stand-down is recorded.
  4. 04 Robo ya 4 · Utoaji ripoti na upyaishaji

    1. 02Competent authority decides and actsActor · The competent authorityThe competent authority decides and acts under its own rules. The programme informs it and never decides for it.
    2. 09Scientific and editorial reviewStep · Reviewers and the publisherQualified, conflict-managed reviewers and the publisher decide what is accepted. Institutions cannot decide a scientific conclusion.
    3. 10G6 · Publication authorisedGate · The Global Risks ForumGRF authorises publication of results that have passed scientific and editorial review. It cannot publish personal data.
    4. 11G7 · Renewal reviewedGate · The Global Risks ForumGRF reviews renewal and sets the next cycle’s mandate.

The programme year · The Global Risks Forum · Decision rightsDesigned programme process, not a record of operation. No cycle has run and every programme is at service level R0. A gate is a programme decision, never a public-authority approval, certification or deployment authorisation.

06Data sovereignty

Contributed data stays under national rules.

Data contributed by a national programme remains governed by that country’s law and the terms under which it was shared. It is used only in the mission it was contributed for, unless the contributor agrees otherwise, and is removed at the end of the edition if the terms say so. Technical handling is by GCRI’s Registry.

07Admission criteria

What GRF weighs at gate G1.

CriterionThe question asked
MaterialityDoes the risk matter to the institutions and people concerned?
National demandHas a competent national or regional structure asked for it?
Cross-system dependenceDoes it test how systems and institutions depend on each other?
Evidence gapWill testing reduce a real uncertainty?
TractabilityCan it be tested meaningfully in one action week?
Capability valueWill the participants be more capable afterwards?
KingaAre rights, safety and protected knowledge covered?
Resource feasibilityAre qualified data, people and infrastructure available?
A competent recipientIs there an institution with authority to act on the result?
08Contributed infrastructure

An offer is not an allocation.

Computing, network and technical environments contributed by national programmes move through separate states, and none implies the next: offered, qualified, reserved, allocated, accessible, measured and accepted.

Neither membership nor sponsorship secures mission admission or a computing allocation. A country listed in the consortium geography does not, by that fact, have a constituted programme.

09National ownership

Countries keep control of their contribution and its results.

Ajenda

National agenda authority

National structures decide what to propose, and may decline participation or data sharing at any point.

Data

Data under agreed rights

Data is used only under the rights agreed for the mission, and nothing is shared without agreement.

Results

Results return home

Findings return to the national programme, which decides how to use them. With its consent, they inform the country’s edition in Reports and the Universe Annual Synthesis.

10Vyanzo

Where this page’s references lead.

The bodies and documents this page is read against. Status and editions change; each link goes to the issuing body.

11Maswali

Questions and answers.

Can our country propose a mission now?
Not yet. Mission calls open once an edition is authorised at gate G0. Until then, write to the Secretariat at the contact form or your regional desk; the acknowledgement gives a reference and names the next step.
Who decides whether a mission is admitted?
GRF records the admission decision at gate G1, with reasons, after GCRI’s technical office has qualified the mission’s inputs. A conflicted reviewer does not decide the admission concerned.
What if a mission is not admitted?
The reasons are recorded and given to the proposing programme. A mission can be revised and proposed again in a later edition.
Where is national participation described more broadly?
On national and regional participation, and in GCRI’s country programme enquiry route. The overview is on the Universe gateway.
Global Risks Forum

Bring a governance question to the Forum.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.