Public purpose capital

Public purpose capital is the money a state commits to long-lived assets and institutions: roads, grids, schools, hospitals, public development banks and sovereign funds. How it is planned, appraised, selected, executed and maintained decides whether borrowing builds productive capacity or leaves debt without assets. This page sets out the principles that govern public capital allocation, how the quality of those institutions is assessed, and who holds the decisions the evidence serves.

01Register

Public purpose capital on the record.

02The question

Public purpose capital: how the risk develops.

Public investment and capital allocation principles. The dossier below sets out how the risk develops, what is measured, where the data come from, how it is modelled and who decides.

Mechanism

Allocation before appraisal

When projects enter the budget before they are appraised, selection follows visibility rather than value. Independent appraisal, published criteria and a single project pipeline are what keep allocation tied to stated public purpose.

Mechanism

Execution gaps compound

Delays, cost overruns and under-execution of capital budgets push spending into later years, crowd out new projects and weaken the link between the debt incurred and the assets delivered.

Mechanism

Maintenance is deferred first

Operations and maintenance compete with new projects in every budget round and usually lose. Deferred maintenance shortens asset life, raises later replacement costs and turns a stock of assets into a contingent liability.

Mechanism

Capital outside the budget

State-owned enterprises, public development banks, sovereign funds and guarantees move public capital beyond the annual budget. Without consolidated reporting, the true size and risk of public investment is not visible to parliament.

03Geography

Activity and exposure in Latin America and the Caribbean.

Night lights, population density and flood water over Latin America and the Caribbean, from NASA GIBS. Each layer carries its own date.

Ramani shirikishi inahitaji JavaScript. Orodha ya tabaka na vyanzo imetolewa hapa chini.

Tabaka 3

Activity and exposure, for this page

Kuhusu tabaka hili
Ushahidi
Imeonekana
Chanzo
VIIRS Black Marble (VNP46A2) (NASA LAADS DAAC)
Mtoaji
NASA LAADS DAAC
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Mng'ao wa setilaiti, uliorekebishwa kwa mwanga wa mwezi na angahewa
Ya hivi karibuni wakati wa ujenzi
2026-10-12
Ubora wa picha
gridi ya takriban mita 500
Kutokuwa na uhakika
Mng'ao wa usiku kutoka setilaiti kwa tarehe iliyoonyeshwa; taa ni kiashiria cha matumizi na kukatika kwa umeme, si kipimo cha usambazaji au upatikanaji.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imekadiriwa
Chanzo
Gridded Population of the World v4.11 (NASA SEDAC (CIESIN, Chuo Kikuu cha Columbia))
Mtoaji
NASA SEDAC (CIESIN, Chuo Kikuu cha Columbia)
Leseni
CC BY 4.0
Tarehe ya data
null; Makadirio yanayotokana na sensa, isiyobadilika (2020)
Ubora wa picha
gridi ya takriban kilomita 1
Kutokuwa na uhakika
Makadirio yanayotokana na sensa ya watu kwa kila kilomita ya mraba mwaka 2020, yanayoonyeshwa kama muktadha wa mfiduo; si hesabu ya watu walioathiriwa na janga lolote.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana (mawingu huacha mapengo)
Chanzo
Bidhaa ya Mafuriko ya Kimataifa ya VIIRS (NASA LANCE)
Mtoaji
NASA LANCE
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Ugunduzi wa setilaiti; mawingu huacha mapengo
Ya hivi karibuni wakati wa ujenzi
2026-10-14
Ubora wa picha
gridi ya takriban mita 250
Kutokuwa na uhakika
Ugunduzi wa setilaiti; mawingu huacha mapengo. Raster ya setilaiti au modeli kama mtoaji anavyoichapisha. Mawingu, mapengo ya mkondo wa setilaiti na makosa ya upimaji huacha mapengo na kelele; thamani ni viashiria, si vipimo mahali fulani.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana (mawingu na muda wa kupita kwa setilaiti huacha mapengo)
Chanzo
VIIRS NOAA-20 mita 375 (FIRMS) (NASA LANCE FIRMS)
Mtoaji
NASA LANCE FIRMS
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Ugunduzi wa setilaiti; mawingu na muda wa kupita kwa setilaiti huacha mapengo
Ya hivi karibuni wakati wa ujenzi
2026-10-13
Ubora wa picha
gridi ya takriban mita 500
Kutokuwa na uhakika
Ugunduzi wa setilaiti wa maeneo ya joto kwa siku iliyoonyeshwa, ikiwemo miale ya gesi na joto la viwandani; si moto uliothibitishwa, ripoti ya tukio au onyo.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Imeonekana
Chanzo
Mwangaza uliorekebishwa wa VIIRS NOAA-20 (NASA LANCE)
Mtoaji
NASA LANCE
Leseni
Data huria ya NASA
Tarehe ya data
kila siku; Picha ya satelaiti
Ya hivi karibuni wakati wa ujenzi
2026-10-14
Ubora wa picha
gridi ya takriban mita 250
Kutokuwa na uhakika
Picha ya satelaiti. Raster ya satelaiti au ya muundo kama mtoa huduma anavyoichapisha. Mawingu, mapengo ya ukanda na makosa ya upatikanaji huacha mapengo na kelele; thamani ni viashiria, si vipimo mahali fulani.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov
Kuhusu tabaka hili
Ushahidi
Modelled (latest year GIBS publishes)
Chanzo
MODIS Terra and Aqua land cover (MCD12Q1) (NASA LP DAAC)
Mtoaji
NASA LP DAAC
Leseni
Data huria ya NASA
Tarehe ya data
yearly; Satellite classification; latest year GIBS publishes
Ya hivi karibuni wakati wa ujenzi
2024-01-01
Ubora wa picha
gridi ya takriban mita 500
Kutokuwa na uhakika
Satellite land cover classes for the year shown, including croplands; a classification with known errors, not a farm register.
Imefikiwa kupitia
kipeperushi cha data cha tovuti hii, kutoka gibs.earthdata.nasa.gov

Ya karibuni zaidi inayopatikana

NASA GIBS / EOSDIS · ASTER GDEM (METI, NASA) · Blue Marble (NASA) · © wachangiaji wa OpenStreetMap (ODbL) · Natural Earth

Inapakia picha za hivi karibuni za NASA.

Buruta ili kusogeza. Ctrl au ⌘ na usogeze, bana au tumia vitufe ili kukuza; elea juu ili kuona thamani zilizo chini ya kiashiria; weka upya hurudisha kwenye eneo.

Activity and exposure, framed on Latin America and the Caribbean.Satellite and model products as NASA publishes them, each with its own date. They are indicators, not assessments of any place.

Data: NASA GIBS · ASTER GDEM · Blue Marble · © OpenStreetMap contributors · Natural Earth · NASA EONET · U.S. Geological Survey · CIESIN/Columbia, NASA SEDAC HBASESources and licences

  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • We acknowledge the use of imagery provided by services from NASA’s Global Imagery Browse Services (GIBS), part of NASA’s Earth Science Data and Information System (ESDIS). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • VIIRS Black Marble night-time lights, NASA Goddard Space Flight Center; distributed by the NASA Level-1 and Atmosphere Archive and Distribution System (LAADS DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Center for International Earth Science Information Network (CIESIN), Columbia University. 2018. Gridded Population of the World, Version 4 (GPWv4): Population Density, Revision 11. NASA Socioeconomic Data and Applications Center (SEDAC). Licensed under CC BY 4.0. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). doi:10.7927/H49C6VHW. CC BY 4.0
  • VIIRS near-real-time products (flood, land surface temperature, snow cover, corrected reflectance), NASA LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • NASA Fire Information for Resource Management System (FIRMS), VIIRS 375 m active fire product, NASA LANCE; vector tiles via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • MODIS land products (vegetation indices, gross primary production, land cover), NASA LP DAAC and LANCE; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • ASTER GDEM is a product of METI and NASA (ASTER Global Digital Elevation Model V003, NASA LP DAAC); imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). Cite as: NASA/METI/AIST/Japan Spacesystems and U.S./Japan ASTER Science Team (2019). ASTER Global Digital Elevation Model V003. doi:10.5067/ASTER/ASTGTM.003. NASA open data
  • Imetengenezwa kwa Natural Earth. Data huria za ramani za vekta na rasta @ naturalearthdata.com. Kikoa cha umma
  • © OpenStreetMap contributors (ODbL), via NASA GIBS (coastlines, boundaries, roads and place names). Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). ODbL
  • Blue Marble, NASA Earth Observatory; imagery via NASA GIBS. Colours redrawn from the published colour map; values averaged into hexagonal cells where shown (modified). NASA open data
  • Muktadha kwenye tufe na ramani bapa: mwambao, mipaka, barabara na majina ya mahali kutoka tabaka za marejeo za NASA GIBS (data ya OpenStreetMap, ODbL, © wachangiaji wa OpenStreetMap); picha za Blue Marble kama msingi wa hiari; ardhi ya 3D na usomaji wa mwinuko kutoka faharasa ya rangi ya mwinuko ya ASTER GDEM (madaraja ya 5 m hadi 200 m, yaliyokuzwa ili yasomeke). Mipaka imechorwa kama ilivyochapishwa na haimaanishi msimamo wowote kuhusu eneo lolote.
  • Matukio ya moja kwa moja: NASA Earth Observatory Natural Event Tracker (EONET); matukio ni ya kuashiria tu na yanabaki na viungo vya vyanzo vyao asili.
  • Moja kwa moja: NASA EONET. Matukio ni ya kuashiria tu, si tahadhari rasmi za mamlaka.
  • Moja kwa moja: U.S. Geological Survey. Matukio ni ya kuashiria tu, si tahadhari rasmi za mamlaka.
  • Context: CIESIN/Columbia, NASA SEDAC HBASE. Center for International Earth Science Information Network (CIESIN), Columbia University, and NASA Socioeconomic Data and Applications Center (SEDAC): Global Human Built-up And Settlement Extent (HBASE) 2010; Seto, Guneralp and Hutyra 2012, Global Grid of Probabilities of Urban Expansion to 2030; Global Urban Heat Island (UHI) Data Set, 2013.
  • NASA GIBS: Tunatambua matumizi ya picha zinazotolewa na huduma za Global Imagery Browse Services (GIBS) za NASA, sehemu ya Earth Science Data and Information System (ESDIS) ya NASA.
  • Optional layers (5 sources in the layer list: live, forecast, observed and context) print their provider credit on the map and here when switched on; forecasts are model output and derived indices are estimates.

Tabaka na tarehe

  • Taa za usiku, kila siku: VIIRS Black Marble (VNP46A2), NASA LAADS DAAC · 12 Okt 2026
  • Population density, 2020: Population: CIESIN, Columbia University, Gridded Population of the World v4.11 (2018), NASA SEDAC, CC BY 4.0 · static
  • Maji ya mafuriko, mchanganyiko wa siku 3: VIIRS Global Flood Product, NASA LANCE · 14 Okt 2026
  • Moto unaowaka na hitilafu za joto: VIIRS NOAA-20 375 m (FIRMS), NASA LANCE FIRMS · 13 Okt 2026
  • Rangi halisi: VIIRS NOAA-20 mng'ao uliosahihishwa, NASA LANCE · 13 Okt 2026
  • Land cover type (IGBP), yearly: MODIS Terra and Aqua land cover (MCD12Q1), NASA LP DAAC · 2024

04Viashiria

What is measured, and how well.

Each indicator carries its unit, its cadence, the kind of source behind it and the evidence label a value would carry. No values are shown: a programme supplies them under its own authority.

IndicatorUnitCadenceSource typeLabel
PIMA institutional design and effectiveness ratingrating by institution (low, medium, high)per assessmentIMF Public Investment Management AssessmentPublished statistics
PEFA public investment management scoregrade (A to D)per assessmentPEFA assessment reportPublished statistics
Capital budget execution ratepercent of approved capital appropriationannualBudget execution reportsPublished statistics
General government investmentpercent of GDPannualNational accounts, IMF Investment and Capital Stock DatasetIMEKADIRIWA
Public capital stockpercent of GDPannualPerpetual inventory estimatesIMEUNDWA KIMUUNDO
Major projects with published appraisalpercent of projects above the national thresholdannualTreasury project registersIMERIPOTIWA
Maintenance allocation against asset basepercent of estimated asset replacement valueannualBudget documents, asset registersIMEKADIRIWA
Public investment efficiency gappercent distance from the efficiency frontierper assessmentFrontier analysis of inputs and infrastructure outputsIMEUNDWA KIMUUNDO
05Twin and cascade simulator

Exercise a cascade in public purpose capital with the people who decide.

Assembled from the Nexus Standards area profile Disaster and climate risk finance: the hazards it names, the systems and communities that carry the loss, the controls and institutions that dampen it and the data that observe it. Pick an initiating event and step through the cascade to see where mandates meet and which decisions fall to whom. The Map view places the run on an example geography with open data. Every weight is a stated assumption. An exercise for dialogue, not a forecast, an assessment or a position. To model a place of your own choosing, open the full System Builder.

Majanga

  • Tropical cyclone
  • Earthquake
  • Ice-jam flood
  • Storm surge (set off downstream)
  • Intense rainfall (set off downstream)
  • River flood (set off downstream)
  • Flash flood (set off downstream)
  • Dangerous surf (set off downstream)
  • Widespread power outage (set off downstream)
  • Mass displacement (set off downstream)
  • Coastal flood (set off downstream)
  • Aftershock sequence (set off downstream)
  • Fault surface rupture (set off downstream)
  • Soil liquefaction (set off downstream)
  • Slope slide (set off downstream)
  • Rockfall (set off downstream)
  • Tsunami (set off downstream)
  • Building collapse (set off downstream)

Controls

  • NS-0 Katiba na kanuni
  • NS-3 UNI za rekodi za hatari (sarufi, ulinganishi wa urithi, mamlaka ya ugawaji)
  • NS-9 UNI za kimuktadha (utekelezaji, matukio, matukio ya programu)
  • NS-10 Sera na vifungu (wajibu unaosomeka na mashine: ufafanuzi, ufungamanishaji, tathmini na utekelezaji)
  • NS-11 Uthibitishaji na ufuatiliaji (ushahidi, uthibitisho, uchunguzi wa ulinganifu usio na imani)
  • NS-14 Ulinganifu na upatanisho na viwango vya nje
  • NRS-F8 Uhamishaji wa hatari kwa vigezo na kwa faharasa
  • NRS-F7 Fedha za hatari za maafa na fedha zilizopangwa mapema
  • NRS-H113 Familia ya majanga: Udhaifu wa mfumo wa fedha (NHS-1 soc.financial-system)
  • NRS-H114 Familia ya majanga: Mishtuko ya uchumi mkuu na ya kifedha ya serikali (NHS-1 soc.macro-fiscal)
  • NRS-D1 Maendeleo yanayozingatia hatari na uchujaji wa miradi
  • NRS-H28 Familia ya majanga: Mabadiliko ya hali ya tabianchi (NHS-1 eco.climate-state)

Observation

  • ERA5 reanalysis (Copernicus Climate Data Store) (listed for reference)
  • CHIRPS quasi-global gridded precipitation (listed for reference)
  • USGS earthquake GeoJSON summary feeds (listed for reference)
  • Total public international support for national disaster risk reduction actions (Sendai indicator F-1)
  • Direct economic loss attributed to disasters in relation to global GDP

Example geography

  • Western Europe: 152 hexagonal cells
  • Rain rate, last half hour (IMERG), NASA GIBS
  • Night lights tonight, outages (VIIRS Day/Night Band), NASA GIBS
  • Surface water through cloud, 30 m (OPERA DSWx-S1 radar), NASA GIBS
  • Surface soil moisture (SMAP), NASA GIBS
06Vyanzo

Where the evidence comes from.

Named public datasets and institutional records, each with its licence class. Sources by agreement are used only under their terms and never republished.

ChanzoWhat it givesLicence class
IMF Public Investment Management Assessment reportsInstitutional ratings across planning, allocation and implementation, with reform prioritiesPublic where published by the authorities, IMF terms
PEFA assessment reports (PEFA Secretariat)Scored public financial management performance, public investment includedPublic where published by the government, PEFA terms
IMF Investment and Capital Stock DatasetPublic, private and partnership investment and capital stock series by countryFree, IMF copyright and usage terms
OECD Budget Practices and Procedures SurveyInstitutional features of capital budgeting across member and partner countriesCC BY 4.0
Public Development Banks and Development Financing Institutions Database (Finance in Common, AFD and Peking University)Mandates, ownership and size of public development banks worldwideFree, attribution
National budget documents and audit reportsCapital appropriations, execution and supreme audit findingsPublic records, terms per government
07Instruments and commitments

How public purpose capital is governed: instruments, mandates and commitments.

The instruments, mandates, actors and accountability arrangements a policymaker, diplomat or development agency works with, citing the agreements that set them. Structures follow the frameworks named. Any state or progress drawn is illustrative, not a record.

Development outcomes

The Sustainable Development Goals and targets that outcomes on public purpose capital are reported against.

GoalTargetHow this subject links
Goal 1, no povertyTarget 1.5, resilience of the poor and vulnerableOutcomes reported through the agreed indicator of the target
Goal 17, partnerships for the goalsTarget 17.4, long-term debt sustainabilityOutcomes reported through the agreed indicator of the target
Goal 10, reduced inequalitiesTarget 10.5, regulation and monitoring of financial marketsOutcomes reported through the agreed indicator of the target
Goal 16, peace, justice and strong institutionsTarget 16.6, effective, accountable and transparent institutionsOutcomes reported through the agreed indicator of the target
Goals and targets of the 2030 Agenda, chosen from the page’s fields; indicators are reported by countries, not by the Forum.
Sendai Framework for Disaster Risk Reduction · UNDRRParis Agreement · UNFCCC2030 Agenda and the Sustainable Development Goals · United NationsInternational Health Regulations · WHO
08Decisions

Who decides, and what the evidence serves.

Capital Nexus prepares evidence. The decisions below are taken by the authorities named, under their own rules, and never by the platform.

Nani anaamuaThe questionEvidence this page serves
Finance and planning ministriesWhich projects enter the budget, in what order, and under which appraisal standardPIMA and PEFA dimensions on appraisal, selection and execution; project register coverage
Parliaments and budget committeesWhether multi-year capital commitments are affordable and adequately maintainedExecution rates, maintenance allocation and consolidated commitments outside the annual budget
Supreme audit institutionsWhich investment programmes warrant performance auditExecution gaps, cost overruns and appraisal coverage by sector
Boards of public development banks and sovereign fundsWhether the mandate, capital and risk appetite remain aligned with stated public purposeMandate texts, ownership policies and published financial statements

Outputs this topic produces

  • Comparative briefs on public investment institutions using PIMA and PEFA dimensions
  • Dialogue papers on consolidating capital held outside the budget
  • Maintenance and execution evidence framed for parliamentary review
  • Question sets for appraisal and selection reforms
09Core questions

What experts ask.

  1. 01

    What should public capital pay for?

    Which investments deliver public value that markets will not, and how that case is made.

  2. 02

    How is risk reflected in appraisal?

    Whether hazards, climate change and maintenance needs are considered in project selection.

  3. 03

    Who manages the assets?

    How public assets are recorded, maintained and governed over their life.

  4. 04

    How are liabilities tracked?

    How public backstops, public-private arrangements and state enterprises create contingent obligations.

10Mechanisms

What drives the issue.

Public investment management has stages: strategic planning, appraisal, selection, budgeting, implementation and asset management. Weaknesses at any stage reduce value, and research on public investment efficiency finds substantial losses between spending and the assets actually built.

Risk often enters too late. Projects appraised without hazard data may be built in exposed locations or to inadequate standards, and maintenance is frequently underfunded because it is less visible than new construction.

Off-budget commitments can hide risk. Public-private arrangements, state-owned enterprises and implicit backstops can create obligations that crystallise in crises, when fiscal space is smallest.

Political cycles favour visible new projects over maintenance and risk reduction, whose benefits are losses avoided.

Transparency is a safeguard in itself. Publishing project pipelines, appraisal results and asset condition lets legislatures, auditors and citizens see whether capital is going where the stated priorities say it should.

Why now: the Fourth International Conference on Financing for Development (Seville, 2025) renewed attention to how public and development capital is mobilised and governed. Capital Nexus convenes the institutions that govern that capital on mandates and accountability; it never arranges finance.

11Methods and limits

How evidence is gathered, and where it stops.

Method or dataWhat it showsIts limit
Public investment assessmentsStrengths and gaps in managementDepend on documents and interviews
Cost-benefit analysisEconomic case for projectsSensitive to discount rates and risk assumptions
Asset registersWhat the state owns and its conditionOften incomplete
Fiscal risk statementsContingent liabilitiesCoverage and quality vary
12Mbinu

How it is studied, and what the methods cannot say.

  1. Policy, institutional and decision scienceMandate and decision-rights mapping · Institutional assessment synthesisApplied here
  2. Economics and development economicsAppraisal of public investment · Fiscal incidence of policy choices · Indirect costs of shocksApplied here
  3. Financial economics and macro-financeDebt sustainability under stress · The sovereign and bank feedback loopApplied here
13Maswali

Questions and answers.

What is a Public Investment Management Assessment?
An IMF diagnostic that rates the institutions governing public investment across planning, allocation and implementation, including a climate module. It describes institutional design and effectiveness; it does not score individual projects.
Why does maintenance matter to debt?
Assets that decay early must be replaced sooner, often with new borrowing. A budget that protects maintenance keeps the value of what the debt has already bought.
Are public development banks part of public investment?
They deploy public capital under a public mandate, often off the main budget. Governance evidence treats their mandates, capital and contingent support as part of the public investment picture.
Does Capital Nexus recommend projects or investments?
No. It sets out principles, institutional evidence and questions. Allocation decisions belong to governments, parliaments and the boards of the institutions concerned.
Does Capital Nexus appraise public projects?
No. It convenes dialogue on appraisal principles. Appraisal and selection are decisions for competent public institutions.
Why does maintenance matter for risk?
Because poorly maintained assets fail more often and more severely under stress, and replacement after failure usually costs more.
What is a contingent liability?
An obligation that becomes payable only if an event occurs, such as a public backstop for a project or an enterprise.
RipotiChangia

Changia ushahidi kutoka ukurasa huu.

Reports ni chapisho la kila robo mwaka la Muungano. Unachojua kuhusu somo hili kinaweza kuwa ushahidi, kisa au sahihisho katika toleo lijalo, kikitajwa kwa jina lako na kuchapishwa chini ya CC BY 4.0 pale ambapo ni kazi yako mwenyewe.

Global Risks ForumCapital NexusFinance and Insurance ReadinessEvidence Brief
Capital Nexus

Bring a governance question to the Forum.

Information and enquiries are open today. An enquiry receives a reference and names the next step; applications, payments, compute allocations and registrations open only when their team, terms and review capacity exist.